Title 20 ZONING
Chapter 20.06 DEVELOPMENT STANDARDS OF GENERAL APPLICABILITY
20.06.05.04 Stormwater Management.
(a) Criteria for Stormwater Management Plans. A stormwater management plan
shall be submitted for review on all subdivisions, proposed planned
developments, or site plans. The stormwater management plan shall be designed to
the satisfaction of the city utilities department assistant director for
engineering, and in a manner consistent with the capacity of downstream
facilities. The stormwater management plan shall conform to the following
criteria:
(1) The existing natural drainage system shall be
utilized to the maximum extent possible.
(2) Finished land grades shall be
such that there is no ponding of water on the land and that surface water will
not cause erosion. This shall not be considered to prohibit stormwater retention
facilities or other decorative ponds.
(3) The natural vegetation shall be
utilized where possible to prevent the concentration of surface water
run-off.
(4) Any planned stormwater management construction shall be
integrated into the drainage pattern of surrounding properties.
(5) Except
for swales used to carry runoff to storm sewer inlets, natural drainage ways,
stormwater retention facilities, and stormwater quality mitigation measures, the
construction of open ditches is prohibited.
(6) Stormwater detention shall
be utilized to limit runoff to pre-development rates, where the city utilities
department assistant director for engineering determines that detention is
necessary in consideration of downstream capacity and the impacts of the
proposed development.
(7) The stormwater management plan shall be designed
to conform to standards that may be established by the utilities service board
and additional recommendations of the city engineer and city utilities
department assistant director for engineering.
(b) Review of Stormwater
Management Plans. The city utilities department assistant director for
engineering shall review stormwater management plans. Each petitioner shall
furnish a set of the stormwater management plan with the application for
approval of any proposed subdivision, planned unit development or site plan.
Approval of the stormwater management plan will be based upon, but not limited
to, consideration of the following items:
(1) Culvert and storm sewer size
and placement;
(2) Grade stabilizing structures;
(3) Curb elevations
on streets used as part of the stormwater management system;
(4) Stormwater
retention; and
(5) Stormwater runoff quality.
(Ord. 98-41 § 1,
1998: Ord. 97-16 §§ 1--13, 1997; Ord. 95-21 § 3 (part),
1995).