Frank Southern Ice Arena
Quick Links
Public Skating Hours
| Day | Time |
|---|---|
| Monday - Thursday | Noon - 2:30 p.m. |
| Friday | Noon - 2:30 p.m. 7 - 9 p.m. |
| Saturday | 12:30 - 2 p.m. 7 - 9 p.m. (Lunar Skating) 9:15 - 11 p.m. (Night Owl) |
| Sunday | 3 - 5 p.m. |
Spring Ice Show
Friday, March 5, 2010
7-9 p.m.
Frank Southern Ice Arena
$20 for participants, FREE for spectators
The Learn to Skate program introduces our spring ice show: Eat, Sleep, Work, Skate! Skaters in the Learn to Skate program, the IU Figure Skating Club, and Bloomington Figure Skating Club perform a variety of routines while demonstrating all levels of ice skating skill. Learn to Skate participants should register fort he last LTS level in which they were enrolled, and must be able to attend the majority of the practice sessions.
Rehearsal Dates:
Rehearsals are 30 minutes in duration. Designated rehearsal times will be assigned after Ice Show registration has ended. The following dates are possible practice times for ice show participants.
Spring Ice Show Rehearsals
Thursday, 2/25 5:30 - 7:45 p.m.
Friday, 2/26 3:30 - 5:30 p.m.
Saturday, 2/27 10:30 a.m. - 12:15 p.m. and 2:25 p.m. - 6:45 p.m.
Monday, 3/1 3 p.m. - 7 p.m.
Tuesday, 3/2 3 p.m. - 7 p.m.
Wednesday, 3/3 3 p.m. - 7 p.m.
Thursday, 3/4 3 p.m. - 7 p.m. (DRESS REHEARSAL)
Friday, 3/5 3 p.m. - 7 p.m. (SHOW DAY)
Registration Codes and Skating Levels
42502-A Tots
42502-B Pre-Alpha
42502-C Alpha
42502-D Beta
42502-E Gamma
42502-F Delta
42502-G Adult
42502-H Freestyle
42502-I BFSC/IUFSC/Private lessons
** Register by 5 p.m. on Wednesday, February 12, 2010.**
__________________________________________________________________________________________
Capital Improvements at Frank Southern Ice Arena
Anticipated projects for 2008 - 2012
- Acrylic dasher board system
- Arena insulation
- Ammonia system evacuation tank
- Shower flooring, wallcovering, and plumbing update
Capital Improvements Completed Since 1993
- Installation of additional roof truss supports (1996)
- Roofing repairs to lobby (1997)
- New ammonia compressor; Replace valves, valve stems, insulate valves and piping, evacuate ammonia and recharge; electrical upgrade for new compressor; ammonia/carbon dioxide leak detection system (1999)
- Energy efficiency upgrades; building renovation, cosmetic, electrical, and HVAC upgrades (2001)
- Pave north parking lot (2003)
- Restroom accessibility (2004)
- Replace zamboni (2005)
- Replace gutters and downspouts (2006)
- Install new dasher boards (2009)