New: Bloomington.in.gov/alpha. Your feedback can help make our next website better!

Blucher Poole Wastewater Treatment Plant

Blucher Poole Wastewater Treatment Plant

Address5555 N. Bottom Rd.
DescriptionThe Blucher Poole Waste Water Treatment Plant was built in 1968 and upgraded in 1998 and is responsible for treating wastewater generated in the northern part of the Bloomington collection system.
DirectionsGet Directions: To Blucher Poole Wastewater Treatment Plant

The plant has a design capacity of treating 6 million gallons a day and a peak hydraulic capacity of 12 million gallons daily. Employees strive to maintain levels of discharge lower than those required by the state and produce a safe byproduct of operations for disposal (sludge).