City Construction Projects
100 E 6th ST
- Case Date:
- 4/7/2000
due to the project at 7th and Walnut the lack of striping in the 100 Block of E. 6th is even more critical than before. Please ASAP stripe the angle parkinging in the 100 jBlock of E. 6th.
City Construction Projects
100-198 E Smith Ave
- Case Date:
- 8/31/2012
It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.
City Construction Projects
1004 W 1st ST
- Case Date:
- 10/10/2022
The contractor that did the construction in the basement did it without permits, it also violates the fire code. This facility treats disabled individuals struggling with mental health and addiction.
City Construction Projects
1005 S Covenanter DR
- Case Date:
- 8/11/2020
The drainage easement at the south end of Greenwood Dr., where it dead ends into the sidewalk, is blocked with a landslide of debris. The water level rose to 3 feet on either side of the sidewalk and covered three properties adjacent to the clogged drain with water and debris. Thank you for your help. Jim and Debbie Quinn
City Construction Projects
100–148 E Smith Ave
- Case Date:
- 8/13/2015
Curb blown apart, with exposed rebar.
City Construction Projects
101 S Smith RD
- Case Date:
- 5/28/1996
AT THE CORNER OF MORNINGSIDE DRIVE & SMITH ROAD. THE CITY FINISHED THEIR PROJECT OUT THERE ABOUT A YEAR AGO THERE IS A SMALL PLOT OF LAND AT THIS INTERSECTION THAT HAD SOD PUT DOWN. THE GRASS DIED AND MR. BROTHERS WOULD LIKE FOR THE CITY TO REPLACE THIS PORTION. THIS AREA IS IN THE CITY RIGHT OF WAY. JANE FLEIG DID GO OUT TO TAKE A LOOK AT SITE ON 5/28/96.
City Construction Projects
1010 W 7th ST
- Case Date:
- 12/7/2018
The manhole cover for the sewer on W 7th Street close to Elm is not secured. I stepped on it and it moved under me and I almost fell in the hole.
City Construction Projects
1016 S Mitchell ST
- Case Date:
- 4/2/2013
A new sidewalk in this area was installed, but the road doesn't seem to be finished. There are huge potholes and it is unsafe for bikes, pedestrians, and vehicles.
City Construction Projects
105 W 4th ST
- Case Date:
- 1/12/2022
Level 1 stairway exit (alley way access) - Standpipe (Fire Dept.) leaking and water is accumulating on landing in front of exit door, may ice as temps fall.
City Construction Projects
110 S Clark ST
- Case Date:
- 9/19/2001
Ms. Ritter stated that a street cut was done in front of her house and that the street cut has fallen in. She thought that the cut was made to repair a gas line, but said that the City made the cut?