Biking & Walking
1100 N Walnut ST
- Case Date:
- 9/21/2023
This is a continuation of #185394, which was never resolved - because their is still a significant amount of construction debris in the bicycle lane. That ticket and this ticket have the same address at the top.
Biking & Walking
120 S Park Ridge RD
- Case Date:
- 6/3/2020
I'm very concerned about the new surfacing on E. 3rd by the State, but I know the City supported it. I know there was not going to be a physical barrier at this point but did think the bike lanes would at least by wide. Please please make sure they are wider than the ones on N. Smith or very very few will feel safe using them. I supported the project as thought it would give me a biking option, but I'm fearful now it'll just be slimmer roads and no real bikable upgrade. Thanks for any input you can give the State!
Biking & Walking
1415 E 3rd ST
- Case Date:
- 1/11/2017
On March 2, 2016, I submitted a question about the lack of painted crosswalks for pedestrians crossing 3rd Street at Jordan Avenue. I received a prompt reply from Matt Smethurst, saying that the intersection would be torn up soon for stormwater improvements, and the crosswalks would be completed after that. There was indeed work completed over the summer, and the curbs now look very nice, but almost a year after my original question, there are still no crosswalks painted in the street. Are they going to appear sometime?
Biking & Walking
149 S Kingston Dr
- Case Date:
- 8/14/2024
New construction at the new sporting store has blocked the bicycle lane.
Biking & Walking
1507 W 11th ST
- Case Date:
- 12/20/2019
I apologize..I'm not sure I picked the right category. I would like to request a crosswalk at 11th and Walnut..across walnut. The bus stops there and let's large groups of students off that then cross, going west. After dark, I'm worried someone will get hit especially.
Thanks in advance.
Susan Hingle
Biking & Walking
1609 N Kinser PIKE
- Case Date:
- 7/24/2016
The sidewalk South of Gourley Pike along N. Kinser Pike has a staircase that prevents the use of this route in my power wheelchair.
Biking & Walking
2901 E 3rd ST
- Case Date:
- 9/25/2024
Construction site at 3rd street and Pete Ellis has setup their construction fencing in the bike line along Pete Ellis. Was this intended and permitted?
Biking & Walking
301 N Washington ST
- Case Date:
- 2/2/2015
There are several sidewalk cuts along Washington Street in front of the AT&T building that are covered with smooth metal pieces. These metal covers provide absolutely no traction when wet and are very dangerous for pedestrians.
Can these please be replaced with the more common covers that have raised ridges to provide some traction?
Biking & Walking
302 N Clark ST
- Case Date:
- 8/13/2023
Trees impinging the bike route on 7th st. They also block the view of oncoming traffic.
Biking & Walking
411 N Washington ST
- Case Date:
- 4/2/2015
When will this street cut in the bike lane be repaired?