closed #144045
Biking & Walking
313 1/2 N Grant ST
- Case Date:
- 3/13/2015
Intersection of 7th & Grant streets filled with broken glass; can a street sweeper clean this up please?
Intersection of 7th & Grant streets filled with broken glass; can a street sweeper clean this up please?
The sidewalk along the west side of Walnut street between the train tracks and the CVS is in bad shape. There are some large pieces of concrete that have come loose and have created several large tripping hazards.
Sidewalks along North Washington Street are in need or repair; there are sections that are lower than the street w/ no curbing and sections that have crumbled down to th gravel. Sections in question between 12th and Cottage Grove.
Could the sidewalk here be improved to be ADA compliant? Thanks!
It would be really great to see sidewalks and bike paths leading into University Elementary School. Right now the only option is walking alongside the edge of 10th street, hoping fast moving traffic doesn't hit you.
I rode through on 4th heading west to east and encountered a fair amount of loose sand on the road surface. It is on 4th just east of Walnut. That was around 10:30am. I have not been back through to see if it is still on the roadway.
The green painted "bike box" and bike lane entering it are full of gravel and debris. It on the east bound lane of 7th Street just west of College - at the light for 7th.
Please add a flashing light and signage at the crosswalk where the B-Line crosses Rogers to alert drivers to be prepared to stop for pedestrians. It's especially important because the sidewalk on the east side of Rogers is closed, so people entering or exiting the B-Line there need to cross from or to the west side of Rogers. (I.e., we can't walk on the east side and cross Rogers at the stop sign at 11th St.)
East Fourth Street on the east side of Jefferson is blocked by tree limbs. The limbs hang down across Fourth (which at that point is just a pedestrian path) and extend down almost to the surface of the path.
I think it is now more than three years since there have been proper crosswalks for pedestrians crossing Third Street at the Jordan Avenue intersection. It is more than two years since the first time I wrote to inquire about it (March 2016). I was told then that it would be done in the summer of 2016. I wrote again in early 2017, and was told it would be done in the spring of 2017. A friend of mine wrote in the summer of 2017 and was told it would be done in the fall. What the heck is going on? After the recent work at Third and Woodscrest, new crosswalks appeared immediately. For it to take years at a corner where the pedestrian traffic is much higher seems truly unconscionable.