uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (3)

closed #164596

Sewer Problems (Storm Sewers)

Case Date:
5/30/2018

Debris has clogged the storm sewer drain grate preventing adequate drainage

closed #156715

Sewer Problems (Storm Sewers)

Case Date:
10/23/2016

I sent this problem in last week. The resolution was they've been clearing the storm drains but they were not going to pick up the debris and tell leaf pickup. This is going to cause the grass today as it does every fall. In Park Ridge as last year we put our leaves at eight weeks we waited for the leaves to be picked up. If these storm drains are going to have piles of leaves next to them for the next 8 weeks then this intersection is going to flood every single time we have rain. This is at the bottom of Three Hills. And the pile is going to get so large like it did last year 4 by 4 by 3 feet high. That the grass is going to die again. It seems reasonable to have the storm sewers cleared and the debris carried away every time we have a flooding event. If this is not resolved differently I will be contacting the mayor. Thank you very much.

closed #131652

Sewer Problems (Storm Sewers)

Bloomington Rail Trail

Case Date:
5/6/2013

Improper construction stormwater management practices