closed #185699

Biking & Walking

1100 N Walnut ST

Case Date:
9/21/2023

This is a continuation of #185394, which was never resolved - because their is still a significant amount of construction debris in the bicycle lane. That ticket and this ticket have the same address at the top.

closed #185394

Blocked Street

1100 N Walnut ST

Case Date:
9/2/2023

A construction sign is completely blocking the bicycle lane on a very busy street with speeding drivers. The sign was originally used to warn about road construction. But that construction was complete more than a week ago. All of the past week the lane has still been blocked. Why does the city not fine the contractor for this negligence? The contractor also left a significant about of debris in the bicycle lane between the sign and 17th street. Why does this happen? Does the city really care about bicycle safety?

closed #185042

Traffic Suggestions

201 E Brownstone DR

Case Date:
8/15/2023

Is there a way to level Allen St from the stop sign back about 50 feet at the Bloomfield Rd intersection? The slope causes accidents and near accidents. We've had 3 cars in our yard since we've been there. We've had to fix up the chain link fence best we could. In 2 situations, our gas meter was hit, which is a serious hazard. Alternatively, could Bloomfield Rd be made inaccessible from Allen St (either a one way or block it off)? Thank you for reading this. Sincerely, Theo

closed #181931

Other

303 E Brownstone DR

Case Date:
10/28/2022

Construction of "The Standard" has been going on for 1.5 years, and they start at 5AM! Are there any regulations about how early people can make noise when building something? It seems like they should at least wait until the sun is up. And for how long they can do it? Do they even have a valid permit?

closed #180419

City Performance

205 E 14th ST

Case Date:
6/25/2022

I had previously submitted ureport 180261 complaining about the state of E 14th St. It was closed out with a vague message that it'd be resurfaced "later this month". I realize it is still June and it may still get repaired, but the road has just continued to get worse and worse. The dust is ridiculous. I'm not sure if anyone at the city understands that days matter. Even if it is resurfaced next week, it is still several weeks past due. Has anyone at the city even driven down it??! I also happened to read that the same developer that turned 14th St into a gravel road is now the same developer who has messed up the intersection of 17th and Walnut. I can hardly believe that anyone would allow them to do more work on city roads when they clearly don't care at all about repairing other work they've done.

closed #180261

Potholes, Other Street Repair

205 E 14th ST

Case Date:
6/9/2022

I made the mistake of driving down 14th St at the new development today when I saw it was open. I cannot believe that the city allows something like this to exist! I have never seen a road in such bad condition within the city and it is upsetting that we continue to allow this to happen.

closed #179583

City Construction Projects

214 E 15th ST

Case Date:
4/20/2022

Construction site utilizing alleyway creating potholes and divots

closed #165845

Excessive Growth

221 1/2 E 16th ST

Case Date:
9/7/2018

This property immensely violates the City code regarding overgrowth of the yard and landscaping. In fact, the public sidewalk attached to this property that runs along 16th Street is practically impassable. There is barely a walkable path where the sidewalk should be.