closed #182318
Water Utility Problems
100 S Glenwood AVE W
- Case Date:
- 12/24/2022
Water is not coming out of faucets.
Water is not coming out of faucets.
Water leak for over a day now.
For the last week, there has been water seeping up out of an underground location under a metal plate in the street that says "WATER" on it. This began after the fire hydrant was replaced last week at 6th and Elm. Surely CBU doesn't want to be wasting water like this; however, I called them directly a week ago to report this, and nothing has been done.
Overgrown bamboo at 1002 W 6 St and Elm bending into sidewalks and street obstructing traffic. Bird droppings covering the sidewalk. The invasive plant has encroached on neighboring property where we live at 1004, so we are having to engage removal services and eventually install impermeable barriers at our expense. The back yard of 1002 is overgrown also, feral cats, possum and a skunk have been sited or smelled in a fallen shed which has not been cleared out. The Elm Street side of 1002 is full of debris and overgrowth and there is an unattended stagnant water feature where we hear frogs in the summer (which do attract copperhead snakes). Someone does seem to be inhabiting the house, though we know that the owner of the house does not reside in Indiana presently.
I believe there is a water leak somewhere near me. My water usage has apparently tripled since last month, while i have been conserving water due to not having enough income to pay the usual bill.
Low water pressure
There seems to be a water leak between the sidewalk and the street curbing. Water is bubbling up through the ground around the small manhole cover-like object in the grass.
Water is bubbling up through the ground (from the muddy spot on the right) and running into this water meter.
My water is of
The city has marked for a pipe installation project adjacent to my address on East Fifth Street and the man who mows my yard mowed over the flags that mark the gas pipeline and water hook up lines. They will need to be marked again before the project can begin.