closed #184962

Water Utility Problems

903 S Maxwell TER

Case Date:
8/9/2023

Water meter cover is cracked and fallen into pit

closed #172217

Drainage or Runoff

2017 E Marilyn DR

Case Date:
4/13/2020

Dear Mr. Howard, Mr. Peden, Mr. Meyers, and Mr. Rollo, We are the property-owners at 2017 E Marilyn Dr. abutting Mr. Howard’s residential construction project at 1110 S. Covenanter Dr (http://howardshomeimprovement.com). We're writing because we're concerned about the addition of gravel this past week to Mr. Howard’s lot, raising it several feet above our property, creating what looks sure to become a pond of run-off water along the eastern edge of our property and causing likely flooding at the southern edge. A marshy meadow that used to collect water on Mr. Howard’s property has been shifted onto our property. In order to get a sense of the impacts and the city’s review of them, we are hoping to talk with Mr. Howard and a city inspector before further work proceeds. We are also concerned that the property line has not been staked and our property is being used for construction staging, with considerable removal of vegetation and possible spreading of gravel across the property line. Here is a rough calculation of the drainage runoff from Mr. Howard’s property onto ours: The raised area is 30’+60’+10’=100' X 12’ = 1200 sq ft (at the side) and 22’ + 12’ = 34’ X 10’ = 340’ sq ft (at the back) = 1540 sq ft (total). At an average 5” rainfall in May, that would create 4,800 gallons or 640 cu ft of runoff. Annually, rainfall is about 50” so the runoff would be about 48,000 gallons or 6400 cu ft per year. But with climate change we suspect those amounts are going to increase (rainfall for every month this year has exceeded the norm). We arrived at this estimate using the USGS rainfall calculator: https://water.usgs.gov/edu/activity-howmuchrain.html And we used rainfall estimates from: https://www.weather.gov/ind/Precip_scorecard_IND For the raised area of Mr Howard’s property, we used the schematics attached below. We also have attached photographs showing the construction staging on our property, and the effect of the land build-ups on the east side of our property line. Thank you for your help, Ben and Jenny Robinson

closed #168577

Water Quality

2015 E Marilyn DR

Case Date:
5/17/2019

For the past week, our water from the tap has tasted "fishy" and has an unpleasant odor. What is it? How long will it continue? Is there anything we can do to get rid of it or minimize it?

closed #168743

Drainage or Runoff

2001 E Marilyn DR

Case Date:
5/31/2019

Location - 2001 East Marilyn Drive Issue - rain water is collecting and pooling in front of our home. We believe that it is caused by drainage system built on the "high" side of the road that is poorly engineered and inadequate for this area. Solution - we would like to discuss what it would take to get a curb with an inlet that would connect to the drainage system across the road.

closed #183290

Drainage or Runoff

2001 E Marilyn DR

Case Date:
3/30/2023

We had a storm water drain added a few years back (THANKS- we really appreciate the added drain) - The issue is that the drain causes accumulation of standing water at the base of the drain. We have had an abundance of mosquitos the last few years - & last year Trudy contacted meningitis - so we want to be careful and mitigate any risk! Is there a way the drain basin could be have aggregate (stone or grave) to the standing water? We appreciate your help - Kevin & Trudy Keough -

closed #183481

Drainage or Runoff

2001 E Marilyn DR

Case Date:
4/17/2023

We continue to have storm water pooling in the drain in front of our house. We appreciate having the drain; would hope there would be a simple solution to mitigate the risk of pooling of storm water - in particular the risk of mosquitoes and the public health risk the bring - thanks - Kevin and Trudy Keough

closed #186909

Utilities Construction

2001 E Marilyn DR

Case Date:
1/26/2024

The fiber optic guys are here AGAIN! The are digging and drilling through our property. They asked if they could take down some of our fence to do their work. They admit they are back because they did not do a good job BEFORE. Our issue - we are concerned of that these contractors will damage our property sewer and/or water lines and we will be the ones stuck to deal with the aftermath of repairs and expense of repairs. Issue 2 - We have no idea on how to communicate with these guys!! What are our RiGHTS! Can you guys help us out? We feel helpless!

closed #175094

Drainage or Runoff

1929 E Southdowns DR

Case Date:
3/11/2021

173337 Our case number was closed. We don't know how this happened without anyone contacting us. Today, Mar 11 the flooding began again and reached the side of our houses. The drainage is not able to carry this amount of water away and needs to be addressed. Please contact us. Thanks

closed #174541

Debris Removal

1908 E Viva DR

Case Date:
1/19/2021

As a neighborhood, we are requesting that the drain pipes (driveway culverts) be cleaned out so storm water has a place to drain.

closed #181319

Water Quality

1900 E Viva DR

Case Date:
9/1/2022

Our tap water has smelled and tasted like a pond for over a week. We’ve asked friends and it’s hit or miss who is having water problems but it’s all over the city.