This project will connect the existing B-Line Trail terminus at Adams Street with the multiuse path on the 17th Street I-69 overpass. The proposed route will be along the eastern edge of West Fountain Drive to North Crescent Road, then north along the eastern edge of North Crescent Road to West 17th Street.  Additionally, the project will reconstruct the intersection of West Fountain Drive and North Crescent Road. The project is programmed to receive federal funding assistance for construction.

Public Meeting:

Wednesday, February 22, 2023, 6:00 PM
Tri-North Middle School - Performance Center
1000 W. 15th Street, Bloomington, IN 474704

The first public meeting was held on September 18th, 2019 at the Bloomington City Hall.  The Project was introduced by the Design Consultant Aztec Engineering followed by a round of questions.  

***Public Notice of Planned Improvement***

In compliance with the Construction Stormwater General Permit (CSGP) administered by the Indiana Department of Environmental Management (IDEM), AZTEC Engineering Group, Inc (AZTEC) (320 W 8th St, Suite #100, Bloomington, Indiana 47404) hereby gives notice of future construction activity on behalf of the City of Bloomington. This project includes extending the B-Line Trail west and north from its current terminus at Adams Street to the intersection of Crescent Road and 17th Street by constructing a new paved multiuse path along the north side of the Indiana Railroad, the east side of Fountain Drive, and the east side of Crescent Road. The project will also involve realigning the Fountain Drive / Crescent Road intersection.  

Estimated construction time is from June 2023 to June 2024. A Notice of Intent (NOI) will be submitted to IDEM with the intent to discharge stormwater from construction activities associated with the B-Line Trail Extension and Multiuse Path project located along Fountain Drive and Crescent Road, Bloomington, Indiana 47404; in Township 9 North, Range 1 West, in portions of Sections 31 and 32. In addition to the Municipal Separate Storm Sewer System (MS4), the receiving waters are Griffy Creek, and an unnamed tributary to Clear Creek. A Storm Water Pollution Prevention Plan for the project has been developed and will be implemented during construction. Questions or comments regarding this project should be directed to Roy Aten, Senior Project Manager, City of Bloomington, atenro@bloomington.in.gov, or Adrian Reid, P.E., AZTEC, via email at areid@aztec.us, or via phone at (812) 717-2554.

Environmental Assessment

Displays

Project Timeline:

  • Design: 2018-2022
  • Public Meeting #1: September 18th, 2019, City Hall, 6 PM
  • Public Meeting #2: February 20th, 2023, Tri-North Middle School, 6 PM
  • ROW Acquisition: 2019 - 2023
  • Utility Relocations: Ongoing, completion anticipated in Spring of 2024
  • Construction: Construction will begin April 1st 2024 and will go through November of 2024. There will be plantings in spring of 2025. There will be lane restrictions throughout the project. Construction signs will be in place. There is a road closure at Fountain Dr. and Crescent Rd. near the months of June through September. This is for the intersection realignment. There will be detour signs in place.

Bidding

  • Letting Date will be January 18th, 2024
  • Bids will be received through INDOT, DES 1700735, R-40293)
  • Bidding Documents available through INDOT ERMS Portal

Tree Clearing (Completed)

Bids were opened on Monday February 27th, 2023.

  • Bluestone Tree, $48,764.20
  • J.R. Ellington Tree Experts, $68,295.00
  • Monroe LLC, $53,250.00
  • Crider & Crider INC, $192,450.00

Bidding Documents

Project Contact:

Roy Aten
(812) 349-3423 or atenro@bloomington.in.gov