Skip to main content

Page last updated on January 23, 2023 at 9:01 am

This project will install or enhance pedestrian crosswalks at 3 locations throughout the City. Improvements will include marked crosswalks, accessible curb ramps, warning signs, flashing beacons, a median refuge island, curb bulbouts, and other traffic calming features. The project is programmed to receive federal funding to aid in construction and construction engineering.

The engineering design consultant for the project is Strand Associates.

 

Project Timeline:

  • Design: TBD (2019-2020)
  • Construction: In Progress, Summer 2022 (construction completed at the intersections of 3rd-Grant, Isaac-Patterson, and 11th-Diamond)

Project Contact:

Roy Aten
(812) 349-3423 or atenro@bloomington.in.gov

Neil Kopper
(812) 349-3423 or koppern@bloomington.in.gov

Attachments

Plan Set (6.69 MB)