        "id": "6189",
        "type": "Lane Restriction",
        "department": {},
        "start": "2025-01-01",
        "end": "2025-03-31",
        "title": "Lane and Sidewalk Closures for Duke Energy Work",
        "geography_description": "E Hillside Dr",
        "description": "WO# 42365068. Replacing 9 poles, Replacing overhead equipment on 36 poles, removing equipment from 1 pole, and installing equipment on 2 poles along B-Line Trail\/S Walnut Street, E Hillside Drive\/S Henderson Street, and S High Street in Bloomington, IN 47403\r\n\r\nPermitted closures include:\r\n- 1 day of lane and sidewalk closures along the south side of E Hillside Dr between S Henderson St and S High St.\r\n- 1 day of lane and sidewalk closures along the east side of S High St between E Hillside Dr and E Southdowns Dr.\r\n- 1 day of lane and sidewalk closures along the east side of S Henderson St between E Hillside Dr and E Thornton Dr.\r\n\r\nClosures will occur in the date range of 01\/01\/2025 03\/31\/2025",
        "geography": "GEOMETRYCOLLECTION(LINESTRING(-86.50857144679036 39.150400530436286,-86.52699265985356 39.150509224305694),LINESTRING(-86.52699265985356 39.150509224305694,-86.53350015359871 39.15044711354375))"
    }
]