[
    {
        "id": "6326",
        "type": "Lane Restriction",
        "department": {},
        "start": "2025-03-31",
        "end": "2025-03-31",
        "title": "Winslow, Rogers Resurfacing Project (Allendale to Sare)",
        "geography_description": "Winslow Rd from Allendale east, then east on Rogers Rd to Sare Rd",
        "description": "Winslow and Rogers Rd will be resurfaced from Allendale to Sare Rd. There are new curbs, curb ramps, and sidewalk being installed as well. There is also a median and rain garden being installed at Xavier Ct on Winslow Ave. A median at Spicewood Ln has been added to the project.",
        "rrule": "FREQ=DAILY;UNTIL=20250725T083641;INTERVAL=1",
        "geography": "LINESTRING(-86.51551749270192 39.13596711566274,-86.50934802393678 39.13601056246054,-86.50850382391799 39.13625262229468,-86.50812773400862 39.136147109263476,-86.50795969412214 39.136345722063936,-86.5081917494942 39.13651950815995,-86.5084718161752 39.13627744900657,-86.50811973222555 39.13613469588563,-86.50792768637935 39.13635192885292,-86.50714349942835 39.13644502849087,-86.50611925532218 39.136327102167286,-86.50398274688557 39.1359857356546,-86.49715712214058 39.135911255420865)"
    }
]