[
    {
        "id": "6757",
        "type": "Lane Restriction",
        "department": {},
        "start": "2025-09-15",
        "end": "2025-09-19",
        "title": "QC Boring Work",
        "geography_description": "2998 S Sare Rd",
        "description": "3 to 5 day lane closure with an estimated start date of 9\/15\/25 on the south side of David Dr ath the Sare Rd intersection for span Replacement, underground bore with 2\" duct and coaxial cable for 69ft at a minimum depth of 36\"-48\". Crossing under S Sare Rd just south of David Dr and Sare Rd intersection. Bore points 36\"x36\"x36\".",
        "geography": "LINESTRING(-86.49639449862181 39.13857695537817,-86.4957047445131 39.13854062901052)"
    }
]