2nd-Bloomfield Multimodal Safety Project Wst 2nd Street between Landmark Avenue and Patterson Drive April 1, 2019 to October 18, 2019
Traffic Signal and Sidepath project on West 2nd Street between Landmark Avenue and Bloomfield Road. Lane restrictions with flaggers in place.
Planning & Transportation
LINESTRING(-86.5539010858018 39.15995457833884,-86.55231321806497 39.160303975038914,-86.55158365721292 39.16038716447363,-86.55084336752479 39.16037052659456,-86.54977048391885 39.16036220765355,-86.5489336347062 39.16053690520826,-86.54850448126382 39.16074487792204)
Bottom Road Between Prather Road and Mt. Pleasant Road April 1, 2019 to September 30, 2019
This section of road will be closed for the bridge reconstruction and raising the road to address flooding issues. The north end by Prather will be open to local traffic only. Detour routes will be posted.
Monroe County Highway Department
LINESTRING(-86.60218395157979 39.30838547094996,-86.60257018967793 39.30795379629251,-86.60321391984151 39.3072564700671,-86.60351432725118 39.30671739751398,-86.60372890397237 39.30532271347556,-86.60420097275899 39.302533262020404,-86.60226978226827 39.299179131529456,-86.60226978226827 39.29758503297609,-86.60219043842335 39.29672656778553,-86.60180420032519 39.2962616098352,-86.60051673999806 39.295663802218854,-86.59905761829394 39.295431320100676,-86.59669727436084 39.2953316846708,-86.57759994617481 39.295165625306026)
West 17th Street Reconstruction West 17th Street from Lismore Drive to Monroe Street April 1, 2019 to November 8, 2019
West 17th Street from Lismore Drive to Monroe Street will be closed to traffic for a road construction project. Detour signage will be in place.
Planning & Transportation
LINESTRING(-86.55487335992433 39.17911030269323,-86.54920853448488 39.17904376886884,-86.54762066674807 39.17909366924303)
321 S Walnut S Walnut street between E Smith Ave and E 3rd St May 6, 2019 to August 1, 2020
Intermittent lane closures at S Walnut street between E Smith Ave and E 3rd St excluding hours of 7:30 am-9 am and 3 pm- 6pm.
The sidewalk and Bike lane will be closed for the duration of the project as well as the north south alley.
The east-west alley will be limited to 12ft westbound access.
Planning & Transportation
LINESTRING(-86.53361148906325 39.16314245870467,-86.53359003139113 39.163886970604324,-86.5330106742439 39.16388281134189,-86.53301603866194 39.1628721032713)
Duke Downtown relocation project N Morton St, S Gentry St, 4th St, and adjacent alleys May 15, 2019 to November 29, 2019
N Morton St, S Gentry St, 4th St, and adjacent alleys will have temporary closures through August 3rd.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53611399007409 39.16754494671832,-86.53611399007409 39.16722054037882,-86.53606571031182 39.16703754127076,-86.53604961705773 39.16664242793644),LINESTRING(-86.53558291268915 39.166550927689855,-86.53558570551294 39.16608105308566,-86.53558827710717 39.16564839615282),LINESTRING(-86.53677917790978 39.165610963719104,-86.53611399007409 39.16560680455859),LINESTRING(-86.53602279496758 39.16712072274254,-86.53551853967278 39.16712072274254,-86.53551317525476 39.16664242793644),LINESTRING(-86.53555609059897 39.16608094727465,-86.53492845368952 39.16608510640717))
Gordon Pike Rogers Street to mobile home park entrance June 4, 2019 to November 30, 2019
This segment of Gordon Pike will be closed for a bridge replacement
Monroe County Highway Department
LINESTRING(-86.53918780160537 39.121545076378425,-86.53594769311538 39.12147848810943)
W Ralston Ave W Ralston Ave between Milton Dr and Banta Ave June 26, 2019 to August 26, 2019
W Ralston Ave Road Closure between Milton Dr and Banta Ave
Utilities
LINESTRING(-86.54474947666414 39.1385486822858,-86.53967473720797 39.138419698602405)
Old State Rd 37 North Old State Rd 37 North between Gourley Pike and Club House Dr July 10, 2019 to October 15, 2019
Old State Rd 37 North between Gourley Pike and Club House Dr will be closed. Signage will be in place to Detour vehicles to N Walnut St
Planning & Transportation
LINESTRING(-86.53405941796873 39.18959205966095,-86.5349177248535 39.18774599796427,-86.53508938623047 39.18663168500359)
4th St Parking Garage Demolition and Reconstruction S Walnut St (eastern turn lane), W 4th St (eastbound lane), and E 3rd (westbound lane) July 15, 2019 to October 1, 2020
The will be a one-lane closure on S Walnut St (eastern turn lane), W 4th St (eastbound lane), and E 3rd (westbound lane). The adjacent sidewalks will be closed as well. Signage will be in place to direct traffic.
Planning & Transportation
LINESTRING(-86.53419605285141 39.16559848623683,-86.53365156442139 39.16559432707555,-86.5336542466304 39.16461899696793,-86.53425506144974 39.16462523579628)
Downtown Curb Ramp Improvement Project Intersection of W 6th St and N Morton St. July 22, 2019 to August 9, 2019
Sidewalk, curbs and ramps replacements. Temporary sidewalk closures and lane restrictions. Pedestrian Detour in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53611484097286 39.167651281958,-86.53611618207734 39.167492198507404),LINESTRING(-86.53601023482126 39.167578498724595,-86.53621274160187 39.167578498724595))
IU Steamline on E 13th St. E 13th St at Fee Lane July 29, 2019 to August 6, 2019 daily until August 6, 2019
E 13th St will be closed west of N Fee Ln for IU Steamline installation.
Planning & Transportation
LINESTRING(-86.52097756941184 39.17512989646045,-86.51910002310142 39.17512157926498)
South Leonard Spring Road South Leonard Springs Road- South of West Tapp Road. July 29, 2019 to August 16, 2019
Sidewalk repair
Street
LINESTRING(-86.58261352446625 39.13679753410298,-86.58260203119079 39.13614565898078)
E 12th St E 12th St from N Park Ave to N Woodlawn Ave July 29, 2019 06:00 am to 16:00 pm every 2 days until August 9, 2019
E 12th St will be closed for 2 days
Planning & Transportation
LINESTRING(-86.52461804223645 39.17432802368964,-86.52357734513868 39.17430307181576)
South Mitchell Street South Mitchell Street between East Maxwell Lane and East Southdowns Drive. July 31, 2019 to August 8, 2019
Resurfacing project- lane restrictions on Tuesday through Thursday from 6:00 am till 3:00 pm .
Street
GEOMETRYCOLLECTION(POINT(-86.51371326118883 39.157791682342776),POINT(-86.51392783791002 39.155941624364004),POINT(-86.5139227416474 39.155941624364004),POINT(-86.5139227416474 39.155941624364004),POINT(-86.51371326118883 39.15777978581818),POINT(-86.51371326118883 39.15777978581818),LINESTRING(-86.51371835745144 39.15778373744763,-86.51375413802802 39.156393244806,-86.5139227416474 39.15596142447282),LINESTRING(-86.5139227416474 39.15596142447282,-86.51390739949042 39.155921782357865,-86.51410153779202 39.1557276890471),LINESTRING(-86.51410153779202 39.1557276890471,-86.5141373183686 39.1557276890471),LINESTRING(-86.5141117840138 39.155739544217056,-86.51410153779202 39.1557276890471),LINESTRING(-86.51412707247422 39.15573559240934,-86.51412197621161 39.155739544217056))
Grimes Ln/Patterson Rd Grimes Ln/Patterson Rd from S Rogers St to S Walnut St August 5, 2019 09:00 am to 15:00 pm
Grimes Ln/Patterson Rd from S Rogers St to S Walnut St closed to through traffic on Monday 8/5/19 from 9am to 3pm for road repair.
Utilities
LINESTRING(-86.53860888564982 39.15381577478715,-86.53796515548625 39.15377417619706,-86.53716719830432 39.15346738583554,-86.53661734545628 39.153347789230594,-86.5358327993194 39.153347789230594,-86.5344447561542 39.15334258937358,-86.53381443703572 39.153347789230594)
West 8th Street West 8th Street Between North College Ave and North Walnut St August 5, 2019 to August 6, 2019
Resurfacing project- lane restrictions from 6:00 am till 3:00 pm .
Street
LINESTRING(-86.53480103307746 39.169487384916636,-86.53359017646953 39.169499279524814)
Downtown Curb Ramps PH II Project Southwest corner of the intersection of North Washington Street and East 6th Street. August 5, 2019 to August 15, 2019
Sidewalk closure and temporary traffic lane restrictions. Pedestrian detour in place.
Planning & Transportation
LINESTRING(-86.53243335787403 39.16755407374552,-86.53233411614046 39.16755407374552,-86.53233277503595 39.167485449461225)
N. Maple Grove Road 6855 N. Maple Grove Road (2,600' north of W. Maple Grove Road) August 5, 2019
This segment of roadway will be closed for one day for a culvert replacement.
Monroe County Highway Department
POINT(-86.56658817292124 39.25170910332312)
Alley Closure at Dimension Mill 642 N Madison St in the north-south alley August 5, 2019 to August 30, 2019
The north south alley located east of 642 N Madison St (Dimension Mill) will be closed.
Planning & Transportation
LINESTRING(-86.5366665251311 39.17323845028287,-86.53663970304095 39.17169971099017)
S Mitchell Lane S Mitchell Lane from E Ruby Lane to Dead of S Mitchell Lane August 6, 2019 to August 8, 2019
Resurfacing project- lane restrictions on Tuesday through Thursday from 6:00 am till 3:00 pm .
Street
GEOMETRYCOLLECTION(LINESTRING(-86.5136577954856 39.15480117668139,-86.51373186466135 39.154689257175306,-86.5137076040448 39.15440896892227),LINESTRING(-86.51370887811045 39.15440896892227,-86.5137114396659 39.15440797054197),LINESTRING(-86.5137050425712 39.154414907028325,-86.5137050425712 39.154414907028325))
Dittemore Road 1232' north of Bottom Road August 6, 2019
This segment of road will be closed for a culvert replacement.
Monroe County Highway Department
POINT(-86.55590222864026 39.28929581205176)
N. Maple Grove Road At Reynolds Road intersection August 7, 2019
This sement of roadway will be closed for one day for a culvert replacement.
Monroe County Highway Department
POINT(-86.56148529307008 39.21260548855682)
West 6th Street W 6th St from N Rogers St to N Madison St August 8, 2019 09:00 am to 16:00 pm August 10, 2019 every 3 days until August 10, 2019
The westbound lane will be closed with flaggers in place for traffic control.
Planning & Transportation
LINESTRING(-86.5380058629836 39.16758938251087,-86.53742114141835 39.16758938251087)
North College Ave North College Ave between West 10th St/ West 11th St August 8, 2019
Two lane restriction for tree removal from 6:00 am to 3:00 pm
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53480775428382 39.17328500973082,-86.53483457637397 39.171690127667034),LINESTRING(-86.53483189416495 39.171690127667034,-86.53482116532889 39.17167973066398),LINESTRING(-86.53482384753791 39.171690127667034,-86.53482921195594 39.171690127667034))
East 7th Street Between North Dunn St and North Indiana Avenue will be closed from 6:00 am to 3:00 pm, weather permitting. August 9, 2019 to August 11, 2019
Tree and Stump removal.
Street
GEOMETRYCOLLECTION(POINT(-86.52825704535176 39.16851668133498),POINT(-86.52694544514347 39.16850836335732),POINT(-86.5269508095615 39.16850628386277),LINESTRING(-86.52825704535176 39.16851668133498,-86.52825704535176 39.16851668133498,-86.52695349177053 39.16850836335732),LINESTRING(-86.52695349177053 39.16850836335732,-86.52694812735248 39.16850004537869))
East 7th Street Between North Lincoln Street to North Dunn Street from 6:00 am to 3:00 pm, weather permitting. August 9, 2019 to August 11, 2019
Tree and Stump removals
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53104054755718 39.168529870582375,-86.53104591197521 39.168529870582375,-86.5282725078538 39.16852155260628),LINESTRING(-86.5282725078538 39.16852155260628,-86.52826177901775 39.16852155260628),LINESTRING(-86.52828323668986 39.168529870582375,-86.52828323668986 39.168529870582375))
South Mitchell Street South Mitchell Street between East Maxwell Lane to East Southdowns Drive from 6:00 am to 4:00 pm August 12, 2019 to August 13, 2019
Resurfacing
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51373548631769 39.15777948525823,-86.51374058225288 39.15649194523567,-86.5139193787249 39.155980882751294,-86.51415439353829 39.155703594475284,-86.51443538178087 39.15552135576934,-86.51412376292087 39.15572734671332,-86.51399088618152 39.155632254944464,-86.51411861328911 39.15572339490487,-86.51394491340713 39.155937330234934,-86.51382233593127 39.155858087339624),LINESTRING(-86.5138018978391 39.155858087339624,-86.51380699377428 39.155850183991134),LINESTRING(-86.5137916516173 39.155873935925825,-86.5138018978391 39.155858087339624))
W 9th Street W 9th St just west of N Walnut St August 12, 2019 to August 14, 2019
There will be a lane shift on W 9th St just west of N Walnut St. It is one way westbound and that will be maintained for the duration of the utility connection.
Planning & Transportation
LINESTRING(-86.53363559981264 39.17044217686541,-86.53418813486971 39.170446335740024)
Green Road Cuffers Drive to Rogers Street August 12, 2019 to August 13, 2019
The crews will be ditching along this route under flagging conditions. Please use caution while traveling in this area.
Monroe County Highway Department
LINESTRING(-86.54449280902838 39.13133888576414,-86.53855976268744 39.13112250374866)
Monroe Dam Road Ramps At the SR 37 Interchange August 12, 2019 to August 23, 2019
INDOT will be having a project on this segment of roadway. The road will only be open for emergency personnel.
Monroe County Highway Department
LINESTRING(-86.53948820901489 39.0187123873535,-86.53998173547362 39.01874573000984,-86.54034651589966 39.018912443055825,-86.5406040079651 39.019212525548,-86.54062546563722 39.01994605516737,-86.54049671960449 39.020229462300364,-86.54002465081787 39.02046285555693,-86.53942383599853 39.020512868297374,-86.53852261376953 39.02046285555693,-86.53768576455688 39.02034615902494,-86.53712786508179 39.02024613327282,-86.53633393121338 39.02001273930085,-86.53594769311523 39.01989604202598,-86.53549708200072 39.01969598910665,-86.53526104760743 39.0193959086663,-86.53487480950928 39.01886242918329)
East Short Street East Short Street between South Highland Ave and South Maxwell St from 6:00 am to 4:00 pm August 13, 2019 to August 16, 2019
Construct new roadway with base and surface.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.51734534070708 39.14400320330333,-86.51648703414973 39.14401110810934),LINESTRING(-86.51614473032092 39.143987352043695,-86.51505146166451 39.14404676307876),LINESTRING(-86.51505655825454 39.14402695936363,-86.51505655825454 39.14403091182888))
W.Leonard Springs Road 2,100' east of Ison Road at 4847 address August 13, 2019
This segment of roadway will be closed for a culvert replacement.
Monroe County Highway Department
POINT(-86.59845389199837 39.12230812367048)
S Sare Rd S Sare Rd at the S McCartney Ln intersection August 13, 2019 08:00 am to 15:00 pm
Road repair on S Sare Rd at the S McCartney Ln intersection. Lane restrictions with flaggers in place.
Utilities
LINESTRING(-86.49752342271627 39.14587295317102,-86.49720155763447 39.14557340896863,-86.49701916742147 39.145182335452546,-86.49698161649526 39.14482870327478,-86.49694406556905 39.14440434231628,-86.49692797231495 39.144275369361196)
Old Meyers Road Approximately 1.25 miles east of Old SR 37 North @ 3626 address August 14, 2019 to August 15, 2019
The crews will be ditching and a culvert replacement in this area. This will be performed under flagging conditions, please use caution while traveling in the area.
Monroe County Highway Department
POINT(-86.49114407373034 39.22662431242463)
Alley Closure at 325 S Walnut east-west Alley Closure at 325 S Walnut between Walnut and Washington August 15, 2019 00:00 am to 12:00 pm
east-west Alley Closure at 325 S Walnut between Walnut and Washington.
Traffic control personnel will be located at the east end of the alley.
Planning & Transportation
LINESTRING(-86.53238167239027 39.163888028903756,-86.53362085295515 39.163892188165875)
East 13th Street East 13th Street from North Woodlawn Avenue to North Fess Lane August 19, 2019 to August 29, 2019
City of Bloomington Street Department will have lane restrictions for a Resurface Project. Flaggers and signage will be in place. Questions, please call City Street 812-349-3448.
Street
LINESTRING(-86.52582850644922 39.17523950193316,-86.52359331480785 39.17520253198856)
Downtown Curb Ramp PH II Project Northwest corner of West 7th Street and North Rogers Street August 19, 2019 to August 22, 2019
Replace the northwest curb ramp. Possible temporary lane restrictions and sidewalk closure.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53863879509657 39.16867999573978,-86.53863611288756 39.168605134079314,-86.53872462578506 39.16860721357099),LINESTRING(-86.53872596688956 39.16860929306259,-86.53872462578506 39.16860825331676))
S College Mall Rd S College Mall Rd just south of E 2nd St. August 19, 2019 to August 20, 2019
The westernmost lane of southbound S College Mall Rd will be closed for utility work.
Planning & Transportation
LINESTRING(-86.49777612071095 39.160784422584896,-86.497786849547 39.160364317305806)
E Kirkwood Ave E Kirkwood Ave between Walnut and Washington August 19, 2019 06:00 am to 09:00 am
One lane closure, eastbound, on E Kirkwood Ave between Walnut and Washington
Planning & Transportation
LINESTRING(-86.53359003139118 39.16657796186598,-86.53234280419927 39.16657380276263)
Alley Closure at 325 S Walnut St Alley Closure at 325 S Walnut between Walnut and Washington August 20, 2019 00:00 am to 12:00 pm
east-west Alley Closure at 325 S Walnut between Walnut and Washington. Traffic control personnel will be located at the east end of the alley.
Planning & Transportation
LINESTRING(-86.53237499070745 39.16387865207915,-86.5336249001084 39.163891129866585)
Sterling Avenue South of Moores Creek Road August 20, 2019
A Storm inlet repair is necessary at this location. It will be completed under flagging conditions.
Monroe County Highway Department
POINT(-86.48852518497368 39.1174139337235)
Winslow-Henderson Path Project South Walnut Street Pike from Winslow Road to a point 150 feet south of Winslow Road. August 20, 2019 to December 18, 2019
As part of the Winslow-Henderson Path Project, Walnut Street Pike will be closed to traffic from Winslow Road to a point 150 feet south of Winslow Road.
Planning & Transportation
LINESTRING(-86.52874327970129 39.13590412908874,-86.52849115205386 39.13559205966354)
Union Board Block Party E. 13th Street August 23, 2019 08:00 am to 01:30 am August 25, 2019
The IU Union Board is requesting the closure of E. 13th Street between N. Fee Lane and
N. Walnut Grove from 8:00 a.m. Friday, August 23rd, 2019 thru Sunday, August 25,
2019 at 1:30 a.m. for a concert and block party to welcome students back to school.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.52101315331983 39.17511878567353,-86.5191356070094 39.17510215127899),LINESTRING(-86.5191356070094 39.17510215127899,-86.52094878030347 39.17511878567353))
Alley Closure at 325 S Walnut Alley Closure at 325 S Walnut between Walnut and Washington August 26, 2019 00:00 am to 12:00 pm
east-west Alley Closure at 325 S Walnut between Walnut and Washington. Traffic control personnel will be located at the east end of the alley.
Planning & Transportation
LINESTRING(-86.53237862209767 39.16388248930875,-86.53362048487156 39.16388872820235)
Rockport Road Between McHaffey Woods and Bolin Lane August 26, 2019 07:00 am to 17:00 pm August 29, 2019
This segment of roadway will be closed for paving operations. The hours will be from 7:00 am to 5:00 pm for the closure. The road will open in the evenings.
Monroe County Highway Department
LINESTRING(-86.58169545007328 39.09821695118555,-86.57706059289558 39.10161399372498,-86.57534397912602 39.1022467580743,-86.57508648706059 39.10327915087237)
Winslow-Henderson Path Project Winslow Road August 26, 2019 to December 18, 2019
Sidepath construction on Winslow Road between Walnut Street and Henderson Street. Construction also on Henderson Street from Winslow Road to Brandon Court. Lane restrictions will be in place.
Planning & Transportation
LINESTRING(-86.53110684049233 39.135938548221276,-86.5268904079209 39.13598847917655,-86.5269225944291 39.13800233152534)
North Jackson Street North Jackson Street from West 13th Street to West 17th Street August 26, 2019 to September 6, 2019
City of Bloomington Street Department will have lane restrictions for a Resurface Project. Flaggers and signage will be in place. Questions, please call City Street 812-349-3448.
Street
LINESTRING(-86.53966205027479 39.17902803906776,-86.53972910550016 39.17504628999254)
Snoddy Road Between Rogers Road and Robin Drive August 27, 2019
This segment of roadway will be having ditching work completed. Please use caution when traveling in this area.
Monroe County Highway Department
LINESTRING(-86.48962660443294 39.13569986721711,-86.48958368908869 39.1339855437985)
Snow Road Between Rockeast Road and Lee Phillips Road August 27, 2019
This segment of roadway will be closed for a culvert replacement.
Monroe County Highway Department
LINESTRING(-86.65847093515647 39.02865057278018,-86.65641099863304 39.02685029908153,-86.65503770761742 39.02411646245483,-86.654780215552 39.0221160272084,-86.65400773935569 39.020849055608494)
Walnut Street Pike Between Holland Drive and Crestline Drive August 28, 2019
This segment of roadway will be having ditching work completed. Please use caution when traveling in this area.
Monroe County Highway Department
LINESTRING(-86.5266136057434 39.116216081769835,-86.52665652108766 39.11783095016534)
Stanford Road 1,350' south of Elwren Road August 28, 2019
This segment of roadway will be closed for a culvert replacement.
Monroe County Highway Department
POINT(-86.66608847451802 39.10637623855061)
W Winding Way & N Kingsley Dr W Winding Way & N Kingsley Dr August 28, 2019 to August 29, 2019
Contractor for City of Bloomington Utilities will be rehabilitating a sewer access point at the intersection of W Winding Way & N Kingsley Dr on 8/28/19 and 8/29/19. Traffic will be allowed in both directions, but may be slowed.
Utilities
POINT(-86.54326873377644 39.197980456277804)
43rd Annual 4th Street Festival E. 4th Street August 31, 2019 08:00 am to 21:00 pm September 1, 2019
The 4th Street Festival of the Arts and Crafts is the single largest arts event in the city with tens of thousands of attendees. This festival serves as the opening act to the fall arts and cultural season in Bloomington and brings many visitors downtown to patronize restaurants and retail.
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.53111971688841 39.165561677752606,-86.5269569284973 39.165561677752606),LINESTRING(-86.52978934121704 39.16655986986615,-86.52985371423338 39.1646799296023),LINESTRING(-86.52822293115234 39.166493324166,-86.52824438882446 39.16446365006604))
Farmer's Market 401 N Morton St August 31, 2019 09:00 am to 13:00 pm weekly on Saturday until January 1, 2020
Morton St, 8th St and 7th St closed during farmer's Market hours
Parks & Recreation
GEOMETRYCOLLECTION(LINESTRING(-86.53805987267772 39.16953447895571,-86.53757171063702 39.16953032002721),LINESTRING(-86.53734640507977 39.168561282978516,-86.53614477544109 39.16855712399246),LINESTRING(-86.53611795335095 39.17041616624803,-86.53610186009685 39.16858623688978))
Pride Fest Bloomington E. Kirkwood Ave. August 31, 2019 13:00 pm to 23:30 pm
Every August, Bloomington Pride holds their annual PrideFest event in order to support
the LGBTQ+ community. The festival will host numerous activities, including live shows and
music. In 2019, PrideFest festival footprint will slightly change on Kirkwood Avenue, starting at
the intersection of Walnut Street and Kirkwood Avenue to the intersection of Lincoln Street on
Saturday, August 31, 2019 from 3:00 to 11:00 p.m. In addition to Kirkwood Avenue, Washington
Street and Lincoln Street will also be closed between 4th and 6th Streets.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53350151849364 39.16662641550337,-86.5310124285278 39.16652659702393),LINESTRING(-86.53232134652707 39.1656282243342,-86.53229988885495 39.16745823065639),LINESTRING(-86.53107680154417 39.16759132016793,-86.53105534387205 39.1654618577621))
West 3rd Street West 3rd Street from S Wynnedale Dr to S Kimble Dr. September 3, 2019 09:00 am to 15:00 pm every 3 days until September 5, 2019
The northern eastbound travel lane will be closed for utility work to install a new waterline to the Harbor Freight Tools building. The closure will take place from 9 am to 3 pm and again after 6:30 pm until midnight.
Planning & Transportation
LINESTRING(-86.56964192618084 39.16449652731822,-86.568051376235 39.16447781079742)
221 E 6th St Alley closure Alley closure between 6th and 7th St September 4, 2019 08:00 am to 17:00 pm September 5, 2019
Alley closure at 221 E 6th St between 6th and 7th St
Planning & Transportation
LINESTRING(-86.53169639182667 39.16852647473553,-86.53169639182667 39.16757406003458)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.