[
    {
        "id": "3798",
        "type": "Road Closed",
        "department": {},
        "start": "2020-01-07",
        "end": "2027-01-07",
        "title": "Allen St. Bridge",
        "geography_description": "Bridge between S Morton and S Walnut (150-156 W Allen St)",
        "description": "County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.",
        "geography": "LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)"
    },
    {
        "id": "6947",
        "type": "Road Closed",
        "department": {},
        "start": "2025-11-22",
        "end": "2026-06-18",
        "title": "Poplars Redevelopment",
        "geography_description": "400 E 7th St",
        "description": "Phase 3 of 4 of the Poplars redevelopment. Closures to be used for construction deliveries and material movement. \r\n\r\nThis phase includes:\r\nSingle day closure on the east side of Grant for scaffolding installation (11\/13\/25) and single day (TBD) for removal. \r\nBike lane closure from 11\/22\/25 to 3\/2\/26.\r\nClosures of the southern sidewalk along E 7th and the east\/west alley on the southern side of the property from 11\/22\/25 to June 18th, 2026.",
        "geography": "LINESTRING(-86.52972234187298 39.16804160976628,-86.52835108743676 39.168028076294235)"
    },
    {
        "id": "7083",
        "type": "Road Closed",
        "department": {},
        "start": "2026-01-28",
        "end": "2027-07-28",
        "title": "Construction for 115 E Kirkwood Lofts",
        "geography_description": "115 E Kirkwood Ave",
        "description": "Genesis Construction is requesting a pedestrian diversion and intermittent closures, traffic lane shifts and intermittent lane closures, alley closures, and metered parking reservations associated with the project at 115 E Kirkwood Avenue. The request impacts the northern sidewalk on E Kirkwood, the north\u2013south and east\u2013west alleys surrounding 115 E Kirkwood, the east\u2013west travel lanes on E Kirkwood, and the metered parking spaces along the north and south side of E Kirkwood.",
        "geography": "LINESTRING(-86.53245771844563 39.16705931743067,-86.53296069631311 39.16706282003534,-86.53295467260338 39.16667869420775)"
    },
    {
        "id": "7115",
        "type": "Road Closed",
        "department": {},
        "start": "2026-02-23",
        "end": "2026-07-27",
        "title": "Poplar Redevelopment",
        "geography_description": "400 E 7th St",
        "description": "Sidewalk closures, metered parking reservations, and alley closures surrounding the former Poplars Building located at 400 E 7th Street. The request includes the eastern sidewalk and adjacent parking lanes on N Dunn Street, the southern sidewalk on E 7th Street, and the east\/west alley between E 6th Street and E 7th Street.\r\nThe requested closures are to accommodate completion of exterior fa\u00e7ade work, including masonry cleaning and sealing, followed by sidewalk reconstruction and perimeter landscaping along the east side of the Poplars Building on Dunn Street.\r\nTraffic control on N Dunn Street is proposed to be in place from February 23, 2026, through July 17, 2026. Traffic control on E 7th Street and within the east\/west alley between E 6th Street and E 7th Street will remain in place through July 27, 2026, to support final site concrete work and landscaping associated with project completion. F.A. Wilhelm has supplied maintenance of traffic plans for all prop",
        "geography": "LINESTRING(-86.52934633192137 39.168023490778666,-86.52876028302248 39.16801791578442)"
    },
    {
        "id": "7172",
        "type": "Road Closed",
        "department": {},
        "start": "2026-03-16",
        "end": "2026-04-30",
        "title": "Centerpoint Relocation Work",
        "geography_description": "1101 W 2nd st",
        "description": "Miller Pipeline, on behalf of CenterPoint Energy, is requesting sidewalk closures, lane closures, and alley closures associated with utility relocation work along West 2nd Street from South Walker Street to South Maple Street. This work is required to relocate utilities in advance of the 2nd Street Modernization Project.",
        "geography": "GEOMETRYCOLLECTION(LINESTRING(-86.54560109841951 39.16234877508592,-86.54559226336345 39.1615370044002),LINESTRING(-86.54399753574025 39.16153015397478,-86.54397986562806 39.16233849956615),LINESTRING(-86.54487662382061 39.16198570581051,-86.54340116945455 39.16197543023773),LINESTRING(-86.54328631372546 39.16198228061978,-86.54230120497208 39.161968579855056),LINESTRING(-86.54288431867363 39.1623316492188,-86.54291524136993 39.161540429612614))"
    },
    {
        "id": "7217",
        "type": "Road Closed",
        "department": {},
        "start": "2026-04-09T19:00:00-04:00",
        "end": "2026-04-10T09:00:00-04:00",
        "title": "CBU Stormwater Maintenance",
        "geography_description": "North Gates Drive between 301 West Jonathan Drive and 401 North Gates Drive.",
        "description": "Beginning Thursday, April 9, 2026, at 7:00 p.m., CBU crews will conduct repairs on stormwater infrastructure located on North Gates Drive between 301 West Jonathan Drive and 401 North Gates Drive. Work will continue overnight until 9:00 a.m. on Friday, April 10.",
        "geography": "LINESTRING(-86.5764391420269 39.16972505157355,-86.57643049983103 39.16881718117682)"
    }
]