Choose types
Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
E Gilbert Dr E Gilbert Dr from N Walnut St to N Lavern Dr May 1, 2021 to September 1, 2021 daily until September 1, 2021
E Gilbert Dr will be closed for sanitary sewer replacement.
Planning & Transportation
LINESTRING(-86.53331652707108 39.189363110139965,-86.53298272283654 39.18936728302555,-86.53242279315278 39.18920871319881)
Sidewalk Closure and Pedestrian Detour on N Park Avenue between E 9th and E 10th Streets N Park Avenue between E 9th and E 10th Streets June 1, 2021 to June 30, 2022
Sidewalk Closure and Pedestrian Detour on N Park Avenue between E 9th and E 10th Streets to allow for renovations at the IU Collins Living Learning Center dorm. The sidewalk on the east side of N Park Avenue will be closed and pedestrians will be detoured to the sidewalk on the west side of N Park Avenue with signage and Type 3 barricades.
Planning & Transportation
LINESTRING(-86.52463115568446 39.17159203622134,-86.52462542726067 39.170455112430574)
7-Line, 7th Street Protected Bike Lane 7th Street from the B-Line Trail to North Indiana Avenue. June 1, 2021 to October 30, 2021
Eastbound lane closed to through traffic.
Planning & Transportation
LINESTRING(-86.53697688912268 39.168565471661935,-86.52705066426013 39.16851254375996)
Discovery Parkway East Discovery Parkway from IU Hospital to Old Range Road. June 28, 2021 to October 30, 2021
Multi-use trail construction. Westbound lane closed to through traffic.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.50080631205216 39.175586339267625,-86.50016470468856 39.17550344207967),LINESTRING(-86.50016470468856 39.17550344207967,-86.50002212527441 39.1755089685619,-86.49965141879764 39.17544265074639,-86.49929497026231 39.17542607128274,-86.4989599086391 39.17543159777108,-86.4988601030492 39.17537633286835,-86.49836820407042 39.175475809661975,-86.49819710877345 39.17553660096658,-86.49665012213008 39.175851609612295,-86.49627228668263 39.17584608315701,-86.49600851476647 39.17576318627525,-86.49586593535233 39.175669236357834))
Blue Ridge Neighborhood Association Block Party E Rusgan Drive September 7, 2021 16:00 pm to 21:00 pm monthly on the 30th until October 5, 2021
Blue Ridge Neighborhood Block Party
External Project
LINESTRING(-86.53136535121428 39.20144046719446,-86.53136535121428 39.20144046719446,-86.53204828029861 39.2011275214071)
N Walnut St N Walnut St at E 14th St September 20, 2021 to October 1, 2021
N Walnut St will be one lane at E 14th St to complete utility work in the area.
Planning & Transportation
LINESTRING(-86.53354443383776 39.17524006058568,-86.53352297616563 39.176487626807216)
E 14th St E 14th St just east of N Walnut St September 20, 2021 to October 1, 2021
E 14th St will be be one lane just east of N Walnut St for utility work in the area.
Planning & Transportation
LINESTRING(-86.53349245099639 39.17595519579555,-86.53276088822938 39.17595519579555)
PRITCHETT BROTHERS 100 W 5TH ST September 27, 2021 to October 1, 2021
METERS 101A & B, 103A&B, 105A&B, 107A
Controller
GEOMETRYCOLLECTION(POINT(-86.53544987486015 39.166608114977095),LINESTRING(-86.53514088385775 39.16662142389737,-86.53514088385775 39.16662142389737),LINESTRING(-86.53538121004742 39.16658149712899,-86.53538121004742 39.16658149712899))
South Olcott Blvd South Olcott Blvd from East Winston to South Daniel St September 27, 2021 to October 7, 2021
ADA replacement
Street
LINESTRING(-86.48570442840597 39.145753987546925,-86.48570092752215 39.1443149781193,-86.48562390807571 39.14337553345172,-86.48561690630785 39.142892230443806,-86.48566591868286 39.14271845776477,-86.48594598939704 39.14226773287939,-86.48598099823633 39.14218627626687,-86.48599500177203 39.14204779980929,-86.48592148320955 39.14183058128788,-86.48591098055776 39.141640514531815,-86.48598800000411 39.14145587776315,-86.48608952563804 39.14131739986885,-86.48683521391476 39.140825936907845,-86.48710128109326 39.14058427706652,-86.48735334473609 39.1403263246352,-86.48759490572714 39.14010638549988,-86.48788897997711 39.139970620258566,-86.48812704008422 39.139938036561716)
South Pickwick Place/ East Pickwick Place South Pickwick Place/ East Pickwick Place from Winfield Rd to E Covenanter Dr September 27, 2021 to October 7, 2021
Milling/ Resurfacing, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.50460640013095 39.155005399838075,-86.50498498001181 39.15348293537849,-86.50519628041044 39.152711449781435,-86.50510823857768 39.15210381357815,-86.50501139256164 39.15198774763914,-86.50297762622486 39.151898991203694,-86.50103190172085 39.15189216378093)
PRITCHETT BROTHERS 100 S WALNUT ST September 27, 2021 to October 1, 2021
100A, 102A&B, 104A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53357876558943 39.16607574797794),POINT(-86.53357876558943 39.16607574797794),LINESTRING(-86.53356159971366 39.165729707470746,-86.53356159971366 39.16571639838176,-86.53357876558943 39.1659958927836,-86.53352726665247 39.165796253893404),LINESTRING(-86.53352726665247 39.1658095629673,-86.53352726665247 39.1658095629673))
PROJECT CORPORATE 100 W 6TH ST September 27, 2021 to October 11, 2021
104A & B
Controller
GEOMETRYCOLLECTION(POINT(-86.53407658384452 39.167539747529815),POINT(-86.53407658384452 39.167539747529815),LINESTRING(-86.53383625765484 39.167539747529815,-86.53407658384452 39.167539747529815),LINESTRING(-86.53407658384452 39.167539747529815,-86.53405941796876 39.16755305627379))
RBI SOLAR 100 W 4TH ST September 27, 2021 06:00 am to 23:00 pm September 29, 2021
METERS
Controller
GEOMETRYCOLLECTION(POINT(-86.53409374972028 39.16560493339321),POINT(-86.53409374972028 39.16560493339321),LINESTRING(-86.53464306560267 39.16557831313466,-86.53402508621724 39.16557831313466))
RBI SOLAR 100 S WALNUT September 27, 2021 06:00 am to 23:00 pm September 29, 2021
PARK MOBILE SPACES
Controller
GEOMETRYCOLLECTION(POINT(-86.53351010208638 39.16541860152583),POINT(-86.53351010208638 39.16541860152583),LINESTRING(-86.5335444338379 39.16544521981399,-86.53347576771552 39.16491284401303),LINESTRING(-86.53347576771552 39.16491284401303,-86.53340710421249 39.16496608299295))
BUSKIRK CHUMLEY 100 S WASHINGTON ST September 29, 2021 18:00 pm to 10:00 am October 1, 2021
METERS 105A&B
Controller
GEOMETRYCOLLECTION(LINESTRING(-86.53232563701378 39.16627538607483,-86.53232563701378 39.16627538607483),LINESTRING(-86.53230847244771 39.16630200505418,-86.53230847244771 39.16630200505418),LINESTRING(-86.53230847244771 39.166248768100786,-86.53230847244771 39.166248768100786),LINESTRING(-86.53230847244771 39.166248768100786,-86.53230847244771 39.166248768100786),POINT(-86.53227413807683 39.16618222210627),POINT(-86.53227413807683 39.16618222210627),LINESTRING(-86.53227413807683 39.16618222210627,-86.53230847244771 39.16630200505418),LINESTRING(-86.53227413807683 39.16618222210627,-86.53227413807683 39.16626207708907))
Elm Street Closed between W 7th and W 8th Elm Street between W 7th and W 8th September 30, 2021 09:00 am to 20:00 pm
Elm Street between W 7th and W 8th closed for mural touch up. Sidewalks will remain open. Signage to be in place.
Parks & Recreation
LINESTRING(-86.54524157085345 39.169534446913275,-86.54526897997864 39.1686844514266)
Fall Pop Market Madison Street Between 6th and 7th Streets October 2, 2021 13:00 pm to 21:00 pm
Fall Pop Market hosted by local businesses.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53735886661978 39.16854776622583,-86.53735886661978 39.16854776622583,-86.53738854844408 39.16854881222861,-86.53741810812096 39.168549853926805),LINESTRING(-86.53739925855241 39.16776174241187,-86.53740060495018 39.16760477008788),LINESTRING(-86.53740274222338 39.167608084151,-86.53740274222338 39.167608084151,-86.53737709494486 39.16760477008788,-86.53739852086701 39.16760556111427,-86.53742197768227 39.16760642711944),LINESTRING(-86.53742197768227 39.16760642711944,-86.53740701676979 39.16760642711944),LINESTRING(-86.53740274222338 39.16760642711944,-86.53740274222338 39.16760642711944),LINESTRING(-86.53739846767695 39.16760642711944,-86.53738778131091 39.168550928760766))
South Olcott Blvd South Olcott Blvd from East Moores Pike to East Winston Place October 4, 2021 to October 28, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.48495560430314 39.15016706280082,-86.48490726159935 39.14997336692886,-86.48483071898501 39.149767173963255,-86.48483474754367 39.14962346335727,-86.48490726159935 39.149298551340195,-86.48489114736473 39.149061114686816,-86.4847420906947 39.1488049321361,-86.48446814870654 39.148598735747214,-86.48429492068462 39.14843627756082,-86.48418212104244 39.148276943206014,-86.4841378068973 39.148017633582924,-86.4841458640146 39.14789578897228,-86.48418212104244 39.14770521108133,-86.48443994879601 39.14740528417505,-86.48543097422395 39.146880409013704,-86.48560017368722 39.146736692513116,-86.48569283053617 39.146586727156176,-86.4857049162121 39.145786906522716)
HILTON GARDEN INN 200 N COLLEGE October 5, 2021 17:00 pm to 12:00 pm October 6, 2021
METERS 207A&B, 211A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53483189416505 39.16887063027755),POINT(-86.53483189416505 39.16887063027755),LINESTRING(-86.5347803952281 39.16887063027755,-86.53483189416505 39.16919003796312),LINESTRING(-86.53483189416505 39.16899040813928,-86.53481472828929 39.1690037171164))
GRADUATE HOTEL 100 S LINCOLN ST October 5, 2021 to October 7, 2021
METERS 107A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53105534387208 39.16698076988516),POINT(-86.53105534387208 39.16698076988516),LINESTRING(-86.53107250843817 39.166994078734945,-86.53107250843817 39.16718040541329))
Tamarron HOA Block Party Tamarron Neighborhood October 9, 2021 16:00 pm to 22:30 pm
Tamarron HOA Block Party
External Project
GEOMETRYCOLLECTION(LINESTRING(-86.4854991970757 39.17459741827517,-86.48550053818019 39.17459741827517,-86.4853999553422 39.174830301111996,-86.48520683629302 39.17506942107937,-86.4853999553422 39.174830301111996,-86.48550322038928 39.174598457932404),LINESTRING(-86.4853999553422 39.174830301111996,-86.4853999553422 39.174830301111996))
HarvestHootenanny W. 9th Between N. College and N. Walnut. October 9, 2021 16:00 pm to 01:00 am October 10, 2021
Special Event: Switchyard Park Harvest Hootenanny
Public Works
GEOMETRYCOLLECTION(POINT(-86.53421882690508 39.17048266724356),LINESTRING(-86.5341901022465 39.17048266724356,-86.5341901022465 39.17048266724356,-86.53421882690508 39.17048266724356,-86.5341765847601 39.17048135728086),LINESTRING(-86.53421768001391 39.16992241574329,-86.53424181989503 39.16992241574329),LINESTRING(-86.53361686519459 39.1704651508104,-86.53481581262423 39.170471389120166))
PRITCHETT BROTHERS 200 N COLLEGE AVE October 11, 2021 to October 15, 2021
METERS 203A & 205A
Controller
GEOMETRYCOLLECTION(POINT(-86.53483189416505 39.167925706175225),LINESTRING(-86.53483189416505 39.167925706175225,-86.53481472828929 39.16773938147131),LINESTRING(-86.5347803952281 39.167726072762605,-86.53479756110384 39.16769945533758),LINESTRING(-86.53479756110384 39.16769945533758,-86.5347803952281 39.16777930859777),LINESTRING(-86.53476322935234 39.16779261729644,-86.5347803952281 39.16775269017751),LINESTRING(-86.5347803952281 39.16776599989663,-86.53479756110384 39.167885779131865))
North Martha Street North Martha Street October 12, 2021 to October 13, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.53161440756543 39.18645534465071,-86.53159897139025 39.18727291302906,-86.5316710068744 39.187444401775,-86.53195914881103 39.18773553287386,-86.53209807438763 39.187787378011535,-86.53291104628025 39.187783389925386)
South Olcott Blvd South Olcott Blvd/ South Kings Ct & South Olcott Blvd/ South Daniel St October 12, 2021 to October 20, 2021
ADA Ramp and sidewalk replacement
Street
GEOMETRYCOLLECTION(LINESTRING(-86.48703187660223 39.14066249199172,-86.48702868292777 39.140679831056275),LINESTRING(-86.48704145762566 39.140721940195334,-86.4869999398575 39.14068973909127,-86.48696480943826 39.14071946318785,-86.4870254892533 39.14066744601058),LINESTRING(-86.48818798676218 39.13993672445835,-86.48808259550451 39.13994167852832,-86.4881336942961 39.13993424742327,-86.48813050062162 39.13985993632946))
East 3rd Street East 3rd between South Mitchell Street and South Swain Ave October 12, 2021 to October 14, 2021
Installation of delineators, weather permitting, 6:00 am to 4:00 pm. Signage will be in place.
Street
LINESTRING(-86.51418635714666 39.16426459836424,-86.51526121532487 39.16426459836424)
PAMELA CROWE 100 E 6TH ST October 14, 2021 07:00 am to 20:00 pm
112A&B, 110A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53311528039552 39.1675796747696),POINT(-86.53311528039552 39.1675796747696),LINESTRING(-86.53311528039552 39.1675796747696,-86.53270329151921 39.1675796747696))
PAMELA CROWE 100 E 6TH ST October 14, 2021 07:00 am to 20:00 pm October 15, 2021
118A, 116A&B, 114A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53313244758094 39.16753974854518),LINESTRING(-86.53311528039549 39.16761960198673,-86.53330410895788 39.167592984521406))
PAMELA CROWE 100 N WASHINGTON October 14, 2021 07:00 am to 20:00 pm October 15, 2021
107A&B, 105A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53309811321009 39.16759298350604),POINT(-86.533080948644 39.16952275307702),POINT(-86.53227413807683 39.16800555917854),POINT(-86.53227413807683 39.16800555917854),LINESTRING(-86.53227413807683 39.16800555917854,-86.53223980632532 39.16820519179788),LINESTRING(-86.53225697351075 39.16820519179788,-86.53223980632532 39.16824511865991),LINESTRING(-86.53223980632532 39.16824511865991,-86.53222264175922 39.16827173587845))
IU Homecoming Parade Woodlawn to 17th, E. 13th to Fee, N. Fee to 17th, finish at Assemly Hall October 15, 2021 16:30 pm to 20:30 pm
IU Homecoming Parade
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.51901745551235 39.175122563245765,-86.51879839113559 39.177139180452826,-86.51885315722978 39.178030719095744,-86.51895665866212 39.179073739598465),LINESTRING(-86.51883946570624 39.178030719095744,-86.51895665866212 39.1790603676387),LINESTRING(-86.51885315722978 39.178030719095744,-86.51885315722978 39.17814746736656),LINESTRING(-86.51883946570624 39.17809439999476,-86.51883946570624 39.17809439999476),POINT(-86.51637499146757 39.178922246433416),LINESTRING(-86.51895665866212 39.1790603676387,-86.51895665866212 39.179073739598465),POINT(-86.51890792332397 39.17340308605105),POINT(-86.5235630413303 39.1743159001681),POINT(-86.52105749252101 39.175048265717635),LINESTRING(-86.52363149894805 39.17518624677885,-86.52363149894805 39.17518624677885,-86.5190037639888 39.175111949317994),POINT(-86.52591798338055 39.17899653986791),POINT(-86.52590429185702 39.175228702435504),POINT(-86.52590429185702 39.1760671964017),POINT(-86.52368626504223 39.17903899322383),LINESTRING(-86.52354934980676 39.17901776654904,-86.52354934980676 39.17901776654904,-86.52363149894805 39.17758495118744,-86.52360411590095 39.17518624677885),LINESTRING(-86.52360411590095 39.17518624677885,-86.52365888199513 39.177531883391026),LINESTRING(-86.5236178074245 39.175239316345625,-86.52360411590095 39.17518624677885),LINESTRING(-86.52357972263998 39.1790603676387,-86.52358180711549 39.17752098319269,-86.52360411590095 39.17518624677885),LINESTRING(-86.51902565961701 39.1790603676387,-86.52357972263998 39.179046995676345))
N Elm Street Closed between W 7th and W 8th Streets N Elm Street Closed between W 7th and W 8th Streets October 16, 2021
N Elm Street Closed between W 7th and W 8th Streets for painting
Parks & Recreation
LINESTRING(-86.54527424327324 39.16867702533156,-86.54525023823031 39.169572034461254)
Eastgate Lane Eastgate Lane from bypass to dead end October 18, 2021 to October 20, 2021
Road Repair
Street
LINESTRING(-86.50132769944508 39.170160978078144,-86.50126191555096 39.17014154930888,-86.5010958895325 39.16986711736948,-86.50064479997286 39.16911910275209,-86.50035347129892 39.169036529222325)
GRADUATE HOTEL 100 S LINCOLN ST October 18, 2021 to October 19, 2021
107A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.5310896756236 39.16718040541329),POINT(-86.5310896756236 39.16718040541329),LINESTRING(-86.5310896756236 39.16718040541329,-86.53110684280904 39.166994078734945))
N Walnut St N Walnut St from E Kirkwood Ave to E 6th St October 18, 2021 07:00 am to 11:00 am daily until October 22, 2021
The right lane of N Walnut St will have temporary, intermittent lane closures for materials unloading. The adjacent sidewalk will also be closed for short periods of time.
Planning & Transportation
LINESTRING(-86.53360599082411 39.1675285967892,-86.53359880450571 39.167035511026285)
GRADUATE HOTEL 100 S LINCOLN ST October 19, 2021 19:00 pm to 18:00 pm October 20, 2021
METERS 107A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53105534387208 39.166248768100786),POINT(-86.53105534387208 39.166248768100786),LINESTRING(-86.53102101212056 39.16627538607483,-86.53105534387208 39.16656818820118))
East Daniel Street East Daniel Street From South Forrester St to E Brookstone Court October 20, 2021 to October 25, 2021
ADA ramp replacement
Street
LINESTRING(-86.48846502807864 39.138692358189985,-86.48890060402981 39.13837190480206,-86.48996071902862 39.13791482147681,-86.49052440555367 39.13768627870141,-86.49105286167088 39.13757945954109,-86.49147882932914 39.137562070360076,-86.49171903665514 39.13757449120408,-86.49226030382975 39.13759684871772,-86.49261901343661 39.13760926955561,-86.49324675524859 39.137567038697966,-86.49336525752942 39.137547165344415,-86.4934453266381 39.13755461785266)
CBU closed N Morton St North Morton Street between West 10th & West 11th Street October 20, 2021 08:00 am to 15:00 pm
Please be advised City Utility Crews have closed North Morton Street between West 10th & West 11th Street beginning immediately at 8:15 am and will remain closed all day until approximately 2:30 pm. If you have any questions please don't hesitate to call. Thank you.
Utilities
LINESTRING(-86.53609530101679 39.173225908676386,-86.53609205330672 39.17171276846642)
HILTON GARDEN INN 200 N COLLEGE AVE October 21, 2021 17:00 pm to 10:00 am October 22, 2021
METERS 211A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53464306691232 39.168218500415946),LINESTRING(-86.53474606347658 39.168338280403674,-86.53466023278808 39.168231810046876),LINESTRING(-86.53466023278808 39.168231810046876,-86.53466023278808 39.168231810046876))
BLUEBIRD 200 N WALNUT ST October 22, 2021 12:00 pm to 21:00 pm
METERS 204A&B, 206A
Controller
GEOMETRYCOLLECTION(POINT(-86.53356159971366 39.16793901484618),POINT(-86.5335444338379 39.16793901484618),LINESTRING(-86.5335444338379 39.16793901484618,-86.53352726665247 39.16813864765439))
BUSKIRK CHUMLEY 100 S WASHINGTON October 22, 2021 06:00 am to 23:59 pm
METERS 105A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53237713595075 39.16615560308162),POINT(-86.53237713595075 39.16615560308162),LINESTRING(-86.53237713595075 39.16615560308162,-86.53237713595075 39.16634193198121))
E Hillside Closure E Hillside between the alley east of S Lincoln and S Grant October 23, 2021 06:00 am to 22:00 pm
Snedegar Construction will closing E Hillside between the alley east of S Lincoln St and S Grant St for a sewer repair on Saturday, 10/23 between the hours of 6am and 10pm. Traffic will be detoured down both Grimes and Miller
Planning & Transportation
LINESTRING(-86.53035319742573 39.150506685143796,-86.53081480518547 39.150506685143796)
E Hillside Drive Lane Restrictions E Hillside between the alley east of S Lincoln and S Grant October 25, 2021 09:00 am to 15:00 pm daily until October 26, 2021
Snedegar Construction will have alternating (both EB and WB) lane closures between the alley east of S Lincoln St and S Grant St for a sewer repair on Monday 10/25 and Tuesday 10/26 between the hours of 9am and 3pm. Flaggers will be present to control the flow of both EB and WB traffic.
Planning & Transportation
LINESTRING(-86.530818561453 39.1505196839168,-86.530357379057 39.1505196839168)
GRADUATE HOTEL 100 S LINCOLN ST October 25, 2021 07:00 am to 23:59 pm October 26, 2021
METERS 107A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53105534387207 39.16627538607483),POINT(-86.53105534387207 39.16627538607483),POINT(-86.53107251105752 39.166475023605074),LINESTRING(-86.53100384493511 39.16626207708907,-86.53107251105752 39.166475023605074))
800 block of W 6th Street 800 Block of W 6th Street between N Waldron St and N Maple St October 26, 2021 to October 27, 2021
Tree/stump removal
Street
LINESTRING(-86.54372697562314 39.16763083220775,-86.54217969611925 39.167627595855095)
HILTON GARDEN INN 200 N COLLEGE AVE October 26, 2021 15:00 pm to 17:00 pm October 27, 2021
METERS 211A&B
Controller
GEOMETRYCOLLECTION(POINT(-86.53490055897777 39.16829835359451),POINT(-86.53490055897777 39.16829835359451),LINESTRING(-86.53490055897777 39.16829835359451,-86.53481472828929 39.16840482435825))

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.