3798,"Road Closed","Planning & Transportation",2020-01-07,2027-01-07,"Allen St. Bridge","Bridge between S Morton and S Walnut (150-156 W Allen St)","County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.","LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)" 5330,"Road Closed",Engineering,2023-08-07,2024-08-31,"Hopewell Project","South Morton Street from West 1st Street to West 2nd Street.","South Morton Street from West 1st Street to West 2nd Street will be closed to through traffic. Detour in place.","LINESTRING(-86.53630036983884 39.159437140754676,-86.53628425635348 39.16133312709155)" 5521,"Lane Restriction",Engineering,2023-12-14T08:00:00-05:00,2024-04-30T16:00:00-04:00,"W Belle Ave Temporary Lane Closures for Electrical Updates","W Belle Ave between S Park Square Dr and S Harvey Dr with work near W 3rd St and along S Park Square Dr and neighboring streets","Duke Energy will have intermittent lane closures along W Belle Ave and along neighboring streets while they update electrical equipment and poles in the area.","GEOMETRYCOLLECTION(LINESTRING(-86.59186043630535 39.16328451821826,-86.58792080112035 39.16329595864255),LINESTRING(-86.59191945705719 39.16320443519618,-86.59178666036556 39.16129385606524))" 5557,"Lane Restriction",Utilities,2024-02-05,2024-05-31,"Clear Creek Culvert Reconstruction","East-west alley behind Von Lee","Milestone contractors will be performing work to reconstruct the Clear Creek culvert that spans from the east-west alley behind the Von Lee across Indiana Ave. The project will include alleyway, sidewalk, and lane restrictions in the surrounding area and a road closure on Indiana during the final phase of the project.","LINESTRING(-86.5282202051962 39.166693654783074,-86.528218241545 39.16704533797687,-86.52697525032963 39.16704533797687,-86.52696346842237 39.16667081815129)" 5609,"Road Closed",Engineering,2024-03-11,2024-05-24,"Liberty Drive Sidewalk Project","Liberty Drive between W 3rd and White Hall Plaza complex","tA new sidewalk will be constructed from 3rd Street to White Hall Plaza, with traffic restrictions in the area during construction.","GEOMETRYCOLLECTION(LINESTRING(-86.57913190070683 39.164574104179394,-86.57916514024085 39.16364631404491),LINESTRING(-86.57916514024085 39.163649995775984,-86.57916276598843 39.16364631404491))" 5606,"Road Closed","Indiana Department of Transportation",2024-03-12,2024-06-13,"Smith and SR 46 Intersection Improvement","Smith Rd","Smith rd and SR 46 intersection improvements. This includes new storm pipe, sidewalk, curbs, and widening of the intersection. This is part of INDOT's project R-41465. Closures include road and sidewalk closures that will be completed in two phases: north of SR 46 and south of SR 46. The south side will be completed first starting on 3/12/24 and completing 4/26/34 followed by the north side on 4/29/24 and completing 6/13/24. Road closures will be in place on Smith at the intersection for both with planned detours to be used. Private access to homes and business to be maintained as soft closures. 11,797 sq ft of pavement excavations, 80 sq ft of non pavement excavations, 87 sq ft of new sidewalk construction, and 2 residential driveway installations are included in the work","GEOMETRYCOLLECTION(LINESTRING(-86.48123356593747 39.16433000073769,-86.48124655836733 39.16541793271682),LINESTRING(-86.48119458864797 39.16413860355638,-86.48079182332279 39.16310102029897))" 5585,"Road Closed",Engineering,2024-03-18,2024-04-30,"1st Street Reconstruction Project","1st Street between South College Ave to South Rogers Street","Closure of 1st Street between South College Ave to South Rogers Street. A detour route is set in place.","LINESTRING(-86.53860272873037 39.15942790212222,-86.53504216360619 39.15940182915014)" 5610,"Lane Restriction",Engineering,2024-03-18,2024-04-26,"Morningside Drive Greenway Project","Morningside Rd from S Smith Rd to E 3rd Street","Lane restrictions on Mornigside Rd to install traffic calming devices.","GEOMETRYCOLLECTION(LINESTRING(-86.48118010366126 39.16623735892415,-86.48082423824137 39.166275228699135,-86.48034975101484 39.16642670759518,-86.47965197568173 39.16694606133345,-86.47923331048186 39.16721655655331,-86.47896815585528 39.167313934577805,-86.47872393448868 39.1673626235395,-86.47844482435545 39.16737885318591,-86.47690274086924 39.16737344330417,-86.47529087984974 39.16722196644713,-86.47454493873731 39.16713247778105,-86.47434273611636 39.167071133327084,-86.47403503647574 39.1669211799921,-86.47371854541683 39.16673032983067,-86.47368337974363 39.166621272363074,-86.47365700548872 39.16434465911837),LINESTRING(-86.47365700548872 39.16434465911837,-86.47366579690703 39.164351475435666),LINESTRING(-86.47365700548872 39.16434465911837,-86.47365700548872 39.16435829175228))" 5616,"Lane Restriction",Engineering,2024-03-18,2024-06-24,"Adams St Sidewalk Project","Along the westside of Adams St and at the intersection of 8th St and Fountain Dr, new sidewalk being installed.","Along the westside of Adams St between Kirkwood Ave and Fountain Dr there will be new sidewalk added. Also, at the S/W corner of 8th St and Fountain Dr, new sidewalk will be added here as well. There is a 60 total day lane closure of the southbound lane of Adams St between Kirkwood Ave and Fountain Dr. The detour will be along 11th St, Rogers St and Kirkwood Ave. The project is scehedule for a total of 90 days.",FREQ=DAILY;UNTIL=20240624T105124;INTERVAL=1,"GEOMETRYCOLLECTION(LINESTRING(-86.54963774306117 39.16673030870902,-86.54966231493518 39.169733898511765),LINESTRING(-86.5498670784689 39.16977199815628,-86.54995717429878 39.16982279771074),LINESTRING(-86.55031755824314 39.16984184754179,-86.55022746241326 39.16996884620275,-86.55034213011714 39.170032345447254))"