Hunters Creek Road, Phase I 2.85 miles east of SR 446 April 2, 2018 to October 1, 2018
This project is phase one of three phases. The road is being reconstructed. The improvements will include 2-10' paved lanes and a 2' aggregate shoulder with improved drainage facilities. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.33120759367742 39.00781679185715,-86.32992013335027 39.00921738565552,-86.32946662365637 39.01039894697425,-86.32989577709874 39.01126595284833,-86.32938079296788 39.01279986028186,-86.32775000988684 39.01573419919441)
Rhorer Road Old SR 37 South to Walnut St Pike May 1, 2018 to October 1, 2018
This project is part of the Fullerton Pike Corridor, Phase I. Rhorer Road will be closed for approximately 150 days for the road reconstruction. The intersection of Walnut Street Pike and Rhorer will have restricted lane movements through out the project. The detour route is Old SR 37 South to Fairfax Road. Gordon Pike will remain open during this duration but with construction along the corridor. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.53135322099078 39.121437233312264,-86.52666471963273 39.12144971862483)
Fullerton Pike, Phase I Rhorer Road May 7, 2018 to November 29, 2018
This segment of Rhorer Road is to be closed for the road reconstruction project and signal installation. Detour routes are posted for this closure.
Monroe County Highway Department
LINESTRING(-86.53135528781597 39.12145920805793,-86.52659168460553 39.12142591389073)
Vectren-Miller Gas main replacement Downtown-various locations May 7, 2018 to September 1, 2018
Miller Pipeline will have one day one lane closures in 7 locations (as shown on the map and listed below) over the course of this project. Flaggers and signage will be in place. Each segment will be updated with a specific date and time when that is determined over the course of the project. Washington St (between 4th and Kirkwood) Lincoln St (between 4th and Kirkwood) Grant St (between 4th and Kirkwood) Lincoln St (between 6th and 7th) Sixth St (between Walnut and Washington) E Kirkwood Ave (between Walnut and S Washington St) E Fourth St (between Walnut and S Washington St)
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.53334595037083 39.16559640665622,-86.53295703006368 39.16559224749483),LINESTRING(-86.53233475757219 39.16634089258267,-86.53234012199023 39.165937457053104),LINESTRING(-86.53107948375322 39.166365847281696,-86.53108484817125 39.16593329791186),LINESTRING(-86.52979738784411 39.166361688165836,-86.52980811668016 39.16589170648615),LINESTRING(-86.53332181048968 39.16756990099017,-86.53276927543264 39.16756574194545),LINESTRING(-86.53233475757219 39.16844329492639,-86.53232939315416 39.167782011943274),LINESTRING(-86.53105266166308 39.16843913593334,-86.53105266166308 39.16764892279255),LINESTRING(-86.53351492953877 39.166586280071925,-86.53236157966235 39.16658004141755))
Woodlawn Reconstruction Project North Woodlawn Avenue May 7, 2018 to August 27, 2018
North Woodlawn Avenue from East 7th Street to East 9th Street may have temporary lane restrictions as construction activities are completed.
Indiana University
LINESTRING(-86.52349151445007 39.17040812819309,-86.52349687886812 39.16849085988761,-86.52457512689209 39.16849085988761)
Trades District W 10th St May 14, 2018 to October 31, 2018
W 10th St between N Morton st and N Rogers st will be closed for construction.
Planning & Transportation
LINESTRING(-86.53612471891017 39.17168307578683,-86.5366879828033 39.17168307578683,-86.53681136441797 39.17163732895733,-86.53726197553249 39.171258876771816,-86.53737616100199 39.17123808263665,-86.5380091623295 39.17125471794526,-86.53837394275553 39.171387800272555,-86.5385670618046 39.171404435545725)
Tapp Road & Rockport Road Intersection Improvement Tapp Road & Rockport Road June 10, 2018 to November 23, 2018
Installation of a traffic signal and other improvements at the intersection of Tapp Road and Rockport Road.
Planning & Transportation
LINESTRING(-86.54948049435549 39.136365399922454,-86.54765659222537 39.13631546923446,-86.54875093350344 39.13633211280106,-86.5491586292737 39.135899378790896,-86.5481501186841 39.13688134829175)
Tapp Road and Pinehurst Drive Intersection of Tapp Road and Pinehurst Drive June 11, 2018 to November 23, 2018
The intersection of Tapp Road and Pinehurst Drive will be closed to traffic during the re-construction of the Tapp Road and Rockport Road Intersection Improvement Project.
Planning & Transportation
LINESTRING(-86.55000246835337 39.13667389442412,-86.55000246835337 39.136357667521)
South Sage Court Water Line Installation Project South Sage Court at East Pepperridge Drive July 31, 2018 07:00 am to 15:00 pm August 24, 2018
The City of Bloomington Utilities has scheduled a water line installation project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52443565202314 39.12384788195561,-86.52451075387556 39.123602345428196,-86.52484334779342 39.12351078921586)
Intersection improvements with water and sewer line replacements. Walnut Street Pike, from Rhorer Road to approximately 400' south August 3, 2018 to September 7, 2018
Walnut Street Pike will be closed south of the Rhorer Road intersection. Traffic will be able to travel between Rhorer Road to the east of the intersection and Walnut St Pike to the north of the intersection. Detour will use Winslow Road, Walnut Street/Old SR 37 South and Fairfax Road.
Monroe County Highway Department
POINT(-86.52669943643191 39.12142681279482)
Dillman Road Between Victor Pike and Dillman Lane August 13, 2018 to August 15, 2018
This segment of roadway will be closed for bridge maintenance. Weather permitting.
Monroe County Highway Department
POINT(-86.5539607845174 39.09300987883256)
South Walnut Street Road Repair Project South Walnut Street, between East Davis Street and East/West Hillside Drive August 14, 2018 05:30 am to 08:30 am
The City of Bloomington Utilities has scheduled a road repair project, weather permitting. South Walnut Street, between East/West Hillside Drive and East Davis Street, will be reduced to two lanes with traffic traveling in either direction during the duration of the project. Additionally, southbound traffic on South Walnut will be unable to turn left onto East Grimes Lane during the hours this road repair project is underway. Signage will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.53369274421863 39.15424275400295,-86.5337249307268 39.15336918374712),LINESTRING(-86.53369810863668 39.154215715086224,-86.53369810863668 39.15056328592729))
South Fess Avenue South Fess Avenue between East Grimes Lane to E Brenda Lane August 14, 2018 to August 16, 2018
Tree Removal from 6:00 a.m. to 3:00 p.m.
Street
LINESTRING(-86.52596172417921 39.153305906747136,-86.5259693952577 39.151834081498805)
South Yancy Lane South Yancy Lane from West 3rd Street to End of City Maintenance. August 14, 2018
There will be single lane restrictions, both directions for pavement project. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.56949268452061 39.16691992373097,-86.56948732010257 39.16465318696956)
North Fee Lane North Fee Lane from East Law Lane to East 11th Stret August 15, 2018 to August 16, 2018
There will be single lane restrictions, both directions for pavement project. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.51887811494365 39.17399595521127,-86.51889957261577 39.17330561350812)
South Sare Road South Sare Road from East Rogers Road to East Canada Drive August 15, 2018 to August 30, 2018
There will be single lane restrictions, both directions for pavement milling/resurface project. The work will be performed from 6:00 am to 4:00 pm, weather permitting.
Street
LINESTRING(-86.49648703408798 39.135492821398,-86.49652994943223 39.13502679449127,-86.49764574838242 39.13387835787714,-86.49901903939805 39.13274654694692,-86.50039233041367 39.131881032196674,-86.50118626428208 39.131381691924986,-86.5018729097899 39.130699254494345,-86.50240935159287 39.13010003568817,-86.50337494683824 39.128219121317244,-86.50427616906724 39.12657119930259)
Union Board Block Party and Concert E. 13th Street between N. Fee Lane and N. Walnut Grove August 17, 2018 08:00 am to 01:30 am August 19, 2018
The IU Union Board is requesting the closure of E. 13th Street between N. Fee Lane and N. Walnut Grove from 8:00 a.m. Friday, August 17 thru Sunday, August 19th at 1:30 a.m. for a concert and block party to welcome students back to school.
Public Works
LINESTRING(-86.5210536863705 39.17513976344247,-86.519086733966 39.175102798521834)
Second Baptist Church Picnic West 8th Street August 18, 2018 to August 19, 2018
West 8th Street will be closed between North Jackson Street to North Rogers Street on 8-18-2018 from 7:00 a.m. to 6:00 p.m. for the Second Baptist Church Picnic.
Public Works
LINESTRING(-86.53869244789682 39.169537884134684,-86.53981897568308 39.1695628376994)
Ketcham Road 7698 Block, approximately 4,850' south of Fluckmill Road August 20, 2018 to August 22, 2018
This segment of roadway will be closed for a pipe replacement. Weather permitting.
Monroe County Highway Department
POINT(-86.57897032571407 39.06461617297796)
East 15th Street East 15th Street from North Lincoln Street to North Dunn Street August 20, 2018 to September 28, 2018
There will be single lane restrictions, both directions for sidewalk and ADA ramp installation/repairs. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.53097487760122 39.176854563117104,-86.52843750787315 39.176879514085556,-86.52835167718466 39.17694604995805)
IU UNION BOARD STUDENT INVOLVEMENT FAIR close 7th Street between Woodlawn and Indiana August 20, 2018 08:00 am to 21:00 pm
IU Union Board would like to close 7th Street between Woodlawn and Indiana on August 20, 2018 from 8:00 a.m. until 9:00 p.m. for the Student Involvement Fair as they have done in the past. The Student Involvement Fairs is an annual event that provides students the opportunity to meet with and learn about ways to get involved on campus. This year, the event will be on the first day of classes from 3 – 7 p.m. (shifting the time to accommodate class schedules and move it out of the hottest time of the day).
Public Works
LINESTRING(-86.52692474329878 39.16848384560333,-86.5234795951218 39.16849308757824)
Friendship Road Approximately 2,500' south of SR 46 at the bridge. August 21, 2018 to August 23, 2018
This segment of roadway will be closed to conduct bridge maintenance. Weather permitting.
Monroe County Highway Department
POINT(-86.40739477944938 39.14769101864309)
North Madison North Madison between West 6th Street and West 7th Street. August 21, 2018 to August 22, 2018
North Madison between West 6th Street and West 7th Street will have lane restrictions between 7:00 a.m. to 3:00 p.m. for tree and stump removal.
Street
LINESTRING(-86.53739697320452 39.168565815414865,-86.53738033005169 39.16758646104313)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.