Choose types
Hunters Creek Road, Phase I 2.85 miles east of SR 446 April 2, 2018 to October 1, 2018
This project is phase one of three phases. The road is being reconstructed. The improvements will include 2-10' paved lanes and a 2' aggregate shoulder with improved drainage facilities. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.33120759367742 39.00781679185715,-86.32992013335027 39.00921738565552,-86.32946662365637 39.01039894697425,-86.32989577709874 39.01126595284833,-86.32938079296788 39.01279986028186,-86.32775000988684 39.01573419919441)
Rhorer Road Old SR 37 South to Walnut St Pike May 1, 2018 to October 1, 2018
This project is part of the Fullerton Pike Corridor, Phase I. Rhorer Road will be closed for approximately 150 days for the road reconstruction. The intersection of Walnut Street Pike and Rhorer will have restricted lane movements through out the project. The detour route is Old SR 37 South to Fairfax Road. Gordon Pike will remain open during this duration but with construction along the corridor. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.53135322099078 39.121437233312264,-86.52666471963273 39.12144971862483)
Fullerton Pike, Phase I Rhorer Road May 7, 2018 to November 29, 2018
This segment of Rhorer Road is to be closed for the road reconstruction project and signal installation. Detour routes are posted for this closure.
Monroe County Highway Department
LINESTRING(-86.53135528781597 39.12145920805793,-86.52659168460553 39.12142591389073)
Trades District W 10th St May 14, 2018 to October 31, 2018
W 10th St between N Morton st and N Rogers st will be closed for construction.
Planning & Transportation
LINESTRING(-86.53612471891017 39.17168307578683,-86.5366879828033 39.17168307578683,-86.53681136441797 39.17163732895733,-86.53726197553249 39.171258876771816,-86.53737616100199 39.17123808263665,-86.5380091623295 39.17125471794526,-86.53837394275553 39.171387800272555,-86.5385670618046 39.171404435545725)
Tapp Road & Rockport Road Intersection Improvement Tapp Road & Rockport Road June 10, 2018 to November 23, 2018
Installation of a traffic signal and other improvements at the intersection of Tapp Road and Rockport Road.
Planning & Transportation
LINESTRING(-86.54948049435549 39.136365399922454,-86.54765659222537 39.13631546923446,-86.54875093350344 39.13633211280106,-86.5491586292737 39.135899378790896,-86.5481501186841 39.13688134829175)
Tapp Road and Pinehurst Drive Intersection of Tapp Road and Pinehurst Drive June 11, 2018 to November 23, 2018
The intersection of Tapp Road and Pinehurst Drive will be closed to traffic during the re-construction of the Tapp Road and Rockport Road Intersection Improvement Project.
Planning & Transportation
LINESTRING(-86.55000246835337 39.13667389442412,-86.55000246835337 39.136357667521)
East 15th Street East 15th Street from North Lincoln Street to North Dunn Street August 20, 2018 to September 28, 2018
There will be single lane restrictions, both directions for sidewalk and ADA ramp installation/repairs. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.53097487760122 39.176854563117104,-86.52843750787315 39.176879514085556,-86.52835167718466 39.17694604995805)
East Pepperridge Drive Water Project East Pepperridge Drive, between East Heather Drive and East Heather Drive August 27, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a water line project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52501917779351 39.12419560255995,-86.52441836297417 39.12383770334023,-86.52379609048272 39.12387515799492,-86.52271784245873 39.124595115820114,-86.52254081666374 39.1248364873168,-86.52250863015557 39.1253774893911,-86.52266419827843 39.1256854425622,-86.52295924127006 39.12598090987973)
Walnut Street Pike Walnut Street Pike at Rhorer Road, extending south for approximately 400 feet. August 30, 2018 to September 28, 2018
This segment of roadway will close for the reconstruction of the roadway and water line installation. This is scheduled for a 30 day closure, weather permitting.
Monroe County Highway Department
GEOMETRYCOLLECTION(POINT(-86.52665304301135 39.12131085813098),LINESTRING(-86.52666377184741 39.12131085813098,-86.52665304301135 39.121452358464154))
W Tapp Rd W Tapp Rd between S Kegg Rd and Adams St September 1, 2018 to October 27, 2018
There will be lane shifts on W Tapp Rd between S Kegg and S Adams beginning 9/1 and ending 10/27. Signage and barricades will be in place to direct vehicular traffic. Expect lanes to shift and signage to change as listed: • Phase 1 9/1/18-9/22/18 • Phase 2 9/22/18-10/13/18 • Phase 3 10/14/18-10/27/18
Planning & Transportation
LINESTRING(-86.56017958145783 39.13653360166177,-86.55524431687041 39.13650863638185)
Rockport Road Between Bolin Lane and Stansifer Lane September 17, 2018 to September 20, 2018
This segment of roadway will be closed for a culvert replacement. This project is weather permitting and the detour route will be posted. Please use caution in this area.
Monroe County Highway Department
POINT(-86.57495774102793 39.10411171469647)
West 8th Street West 8th Street from North Morton Street to North College Avenue September 17, 2018 to September 21, 2018
There will be single lane restrictions, both directions for crack sealing project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
LINESTRING(-86.53610862565577 39.169512771925724,-86.53477824998438 39.16949613620503)
East Daniel Street East Daniel Street from South Forrester Street to South Forrester Street September 17, 2018 to September 21, 2018
There will be single lane restrictions, both directions for crack sealing project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
LINESTRING(-86.49470258657578 39.137610449291344,-86.49335075323229 39.13756051948627)
East 8th Street East 8th Street from North Walnut Street to North Washington Street September 17, 2018 to September 21, 2018
There will be single lane restrictions, both directions for crack sealing project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
LINESTRING(-86.53359066371806 39.16952222243913,-86.53231393222698 39.16949726885997)
East Blue Ridge Drive East Blue Ridge Drive from North Walnut Street to North Blue Ridge Drive September 17, 2018 to September 21, 2018
There will be single lane restrictions, both directions for crack sealing project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
LINESTRING(-86.53450476866355 39.196849647046065,-86.53397369127862 39.19709492806149,-86.53354453783625 39.19742751112142)
Landscape maintenance West 3rd Street September 17, 2018 08:00 am to 15:00 pm September 21, 2018 every 5 days until September 21, 2018
One eastbound and one westbound lane closed from 8 am to 3 pm for landscape maintenance on West 3rd Street from Landmark Ave. to S. Franklin Road.
Parks & Recreation
LINESTRING(-86.55637458017226 39.16441449058533,-86.55637458017226 39.16441449058533,-86.57027915170546 39.1645808596347)
Rockport Road Between Bolin Lane and Shaw Road, approximately 100' north of Bolin Lane September 17, 2018 to September 20, 2018
This segment of road will be closed for a culvert replacement. Detour route will be posted. This project is dependent on the weather. Please use caution in this area.
Monroe County Highway Department
POINT(-86.57502211404416 39.104211621694645)
Eastern Heights Eastern Heights Neighborhood Project September 17, 2018 to October 1, 2018
There will be single lane restrictions, both directions for pavement resurface project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.47925575316815 39.176180407356895,-86.47867639602093 39.17553167284967,-86.47821505607037 39.17578950394744,-86.47808631003767 39.176313480362126,-86.47682030738262 39.176288529192846,-86.47678812087443 39.175415232689176,-86.47675593436627 39.174899566803305,-86.47710469926777 39.17447578336768,-86.47866566718487 39.1725790235177),LINESTRING(-86.47880514205364 39.175440184168394,-86.4767988497105 39.17539859836478),LINESTRING(-86.47866566718487 39.17553167284967,-86.4798780256596 39.17481639453209,-86.48025353492169 39.17450865627302,-86.4808650785771 39.17385990634159,-86.4813371473637 39.17356879865767,-86.48172338546185 39.17350225958927,-86.48208816588787 39.173593750792094),LINESTRING(-86.48082216323284 39.17383495430161,-86.48065050185589 39.173152928447166,-86.48045738280683 39.17300321456929,-86.47992094100384 39.17300321456929,-86.47954543174176 39.173186198154525,-86.47842963279156 39.174442118093964),LINESTRING(-86.4802213484135 39.17449202173418,-86.47712071479228 39.174483704463285))
N. Maple Grove Road N. Maple Grove and Delap Road Intersection September 18, 2018
This intersection will be closed from approximately 9:00 am to 2:00 pm for a culvert installation.
Monroe County Highway Department
POINT(-86.56935728860475 39.26527690162732)
South Walnut Street (Northbound Lane) South Walnut Street from East Grimes Lane to East Hillside Drive September 18, 2018
There will be single lane restrictions, northbound lane for pavement milling/resurface project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
LINESTRING(-86.53371609521466 39.15336595382132,-86.53371609521466 39.150487254955806)
S Walnut St S Walnut between Hillside and Southern Dr September 21, 2018 to September 23, 2018
Walnut St southbound lane closure between Hillside and Southern Dr. Friday 9a-3:30p, Saturday and Sunday closed during day, open at night.
Planning & Transportation
LINESTRING(-86.53372481231759 39.150723765354286,-86.53369262580941 39.150490802697135,-86.5334941423423 39.14980855047929)
BLOOMINGFOODS CO-OP VENDORS FAIR 10:00AM-1:00PM MADISON STREET BETWEEN 6TH & 7TH September 22, 2018 06:00 am to 15:00 pm
The Vendor Fair is to show appreciation for the members of their co-op community. There will be local vendors, grilling, beer sampling and live music. The event will take place alongside the Saturday Farmer’s Market. This is a family friendly event, and the general public is welcome and encouraged to attend. There is no rain date this year.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53739754758142 39.16856628537025,-86.53738145432735 39.16759515551698),LINESTRING(-86.53738145432735 39.16759515551698,-86.5373921831634 39.16759307599543))
Arlington Rd Arlington Rd north of 17th St to Prow Road September 24, 2018 to January 1, 2019
E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic at this location to one lane of two-way traffic during the hours work is underway, . Signage and traffic control personnel will be in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.54727734399412 39.179301587087565,-86.54809273553467 39.179700787625336,-86.54873646569823 39.180332850507654,-86.5498093493042 39.18199614672781,-86.55010975671387 39.182727984597165,-86.5501526720581 39.18402531482246,-86.55023850274658 39.184723867333986,-86.551397217041 39.18698579925939,-86.5518263704834 39.18831631344736),LINESTRING(-86.55178345513914 39.18834957597937,-86.55178345513914 39.18834957597937))
South Pete Ellis Drive South Pete Ellis Drive - South of East Longview Avenue September 24, 2018
Tree and Stump removal
Street
LINESTRING(-86.49493224507789 39.16690791374418,-86.49491883403282 39.165635222613616)
South Baytree Lane Water Services Project South Baytree Lane, between East Pepperridge Drive and East Pepperridge Drive September 24, 2018 to September 28, 2018
The City of Bloomington Utilities has scheduled a water services project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52269758058156 39.124596971157445,-86.52248300386039 39.12423907397701,-86.52251519036855 39.123772972597294,-86.52247227502431 39.12365644677047,-86.52260102105704 39.12361483035707,-86.5227404959258 39.12361483035707,-86.52325548005668 39.12361483035707,-86.5235129721221 39.123648123489744,-86.52373827767934 39.123831235438416)
East University Street East University Street between Ballantine Road and South Hawthorne Drive September 25, 2018
For tree and stump removal
Street
LINESTRING(-86.51912353706918 39.16018740252349,-86.52021787834725 39.16018012343119)
South Weimer Road South Weimer Road from West Bloomfield Road to West Tapp Road September 27, 2018 to September 28, 2018
There will be single lane restrictions, both directions for pavement resurface project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
LINESTRING(-86.56425036264054 39.15418128643435,-86.5639928705751 39.144130404543205,-86.56356371713272 39.143531300032606,-86.56279124093643 39.143298313568124,-86.56201876474013 39.142632633706256,-86.56214751077286 39.13670780561583)
Lotus World Music and Arts Festival 2018 West 6th St & West 4th St Between College & Walnut St September 27, 2018 to September 30, 2018
West 6th Street from North College and North Walnut and West 4th Street between South College and South Walnut will be closed from 7:00 a.m. Thursday, September 27 until Sunday, September 30th at 4:00 pm. (NOTE: 4th St Parking Garage remains OPEN and accessible throughout the weekend!!)
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53486642494033 39.16757539247098,-86.53360578670335 39.16756499485962),LINESTRING(-86.53361115112138 39.167573312948804,-86.53361115112138 39.16756707438199),LINESTRING(-86.53489056482131 39.16560605745187,-86.53363529100231 39.16559773912999))
E Kirkwood Ave E Kirkwood Ave Between S Washington St & S Lincoln St September 28, 2018 09:00 am to 12:30 pm September 30, 2018
E Kirkwood Ave Between S Washington St and S Lincoln St including all connecting alleys will be closed on Friday September 28th from 9:00 a.m. to 12:30 a.m. and again 4:00 pm to 12:30 a.m on Saturday September 29th.
Public Works
LINESTRING(-86.53232939315401 39.166580665384544,-86.53109021258913 39.1665640289703)
Lotus World Music and Arts Festival 2018 North Washington Street from E 7th to E 4th E 6th St from N Washington to North Lincoln September 28, 2018 to September 30, 2018
Washington St closed from 4th to 7th st and all connecting alleys (NOTE: Washington St between 6th & 7th will be ONLY accessible to residents of the block) ** 6th St from Washington St to Lincoln St and all connecting alleys will be closed
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53234075164487 39.168549998481524,-86.53232465839076 39.16854583949478,-86.5323300228088 39.16756015270275,-86.53234075164487 39.16558873767619),LINESTRING(-86.53234075164487 39.16558873767619,-86.53234075164487 39.16559289683778),LINESTRING(-86.53234075164487 39.16558873767619,-86.53234075164487 39.16558873767619),LINESTRING(-86.5323300228088 39.16756015270275,-86.5310693845718 39.1675435165202),LINESTRING(-86.53105865573573 39.1675435165202,-86.5310693845718 39.1675435165202),LINESTRING(-86.53109084224391 39.16756015270275,-86.53107474898982 39.16753935747397))
Lotus World Music and Arts Festival 2018 Kirkwood between Walnut St & Washington St September 28, 2018 07:00 am to 09:00 am September 30, 2018
E Kirkwood from N Walnut St to N Washington St from 7:00 am Friday, September 28, 2018 until 9:00 am Sunday, September 30, 2018 and all connecting alleys will be closed.
Public Works
LINESTRING(-86.53360954957935 39.16658747464413,-86.53233550029728 39.16658227576562)
Lotus World Music and Arts Festival 2018 E 6th St September 28, 2018 07:00 am to 15:00 pm September 30, 2018
E 6th St will be closed between North Walnut St & North Washington St, and alley running North to midpoint of block.
Public Works
LINESTRING(-86.53361417127263 39.167568445425985,-86.53232671094547 39.16756220685872)
Tamarron HOA Block Party North Callery Drive between addresses 808 and 806 September 29, 2018 16:00 pm to 22:00 pm
Tamarron HOA requests the Board’s permission to close a public street to hold a neighborhood block party on Saturday, September 29, 2018 from 4:00 p.m. until 10:00 p.m. so their neighborhood can get together for a neighborhood block party. Pending Board approval the Petitioner will be closing down a portion of the North Callery Drive between addresses 808 and 806.
Public Works
LINESTRING(-86.48496896393164 39.17525712425589,-86.48546964251118 39.174785816153076)
Hoosiers Outrun Cancer E 17th, N Indiana, E 13th, E Cottage Grove, E 11th, N Walnut Grove, N Fee, E Law, N Jordan, N Dunn, and N Woodlawn September 29, 2018 09:00 am to 11:30 am
The City of Bloomington Board of Public Works agrees that all or a portion of the following City streets may be utilized to conduct the Bloomington Hospital Foundation Hoosiers Outrun Cancer between the hours of 9:00 am and 11:30 am, on Saturday, September 29, 2018: E. 17th Street, N. Indiana Avenue, E. 13th Street, E. Cottage Grove, E. 11th Street, N. Walnut Grove, N. Fee Lane, E. Law, N. Jordan, N. Dunn Street and N. Woodlawn Avenue.
Public Works
LINESTRING(-86.52682634135583 39.183141096933014,-86.52685018263168 39.183954236350075,-86.51912542066877 39.18378791313211,-86.51559682540704 39.18375095225076,-86.51419015608137 39.183473746036356,-86.51252122486352 39.18242035163959,-86.51147218515274 39.18155175142962,-86.51094766398768 39.1803319968362,-86.51089997881667 39.17885347881531,-86.51252122486352 39.17885347881531,-86.51252122486352 39.177393410296645,-86.51283116930738 39.17656171265645,-86.51385637036168 39.17539731943194,-86.51521535713567 39.17386324801521,-86.51550145768435 39.17338268923842,-86.51895852911859 39.17399262971759,-86.5190777381171 39.17523097596862,-86.52100892860784 39.17512008078464,-86.52108045243533 39.17255094415657,-86.52696939293986 39.17253246025672,-86.52704091807702 39.179038294887675,-86.52665944849598 39.17907525824688,-86.52687402521717 39.17972211236449,-86.5271124432142 39.18049832873879,-86.52730317865957 39.18094187703218,-86.52694555035434 39.179999332865634,-86.52663560591049 39.179056777077335,-86.5282330106815 39.17901981370838,-86.52832837840418 39.18406511810758,-86.52794690882313 39.184157519861515,-86.52792306754729 39.18474888643388,-86.5280184339603 39.18515544801872,-86.52816148554433 39.185543527280174,-86.52768464824061 39.185802245682,-86.52687402521717 39.18574680619531,-86.52687402521717 39.18382487399401)
East Hector Dr 4100 Block of East Hector Drive October 1, 2018 to October 2, 2018
Lane restriction due to paving.
Street
LINESTRING(-86.48056753912645 39.17307202234281,-86.48058925152985 39.17305419183839)
South Baytree Lane Street Repair South Baytree Lane, between East Pepperridge Drive and East Pepperridge Drive October 1, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52378119302354 39.12384788195564,-86.52353979421218 39.12367725496799,-86.52317501378614 39.12361483035707,-86.52274586034379 39.1236314769254,-86.52252055478652 39.123739679523624,-86.52248300386033 39.12393527610635,-86.52250446153245 39.12417248825449,-86.52254737687669 39.12435976043878,-86.52263320756514 39.12450957782775,-86.52269221616349 39.12457616323164),LINESTRING(-86.52271367383563 39.124592809572846,-86.52269221616349 39.12458032481729),LINESTRING(-86.52268685174545 39.12458448640274,-86.5226761229094 39.12457200164579))
East Elliston Drive East Elliston Drive from South Bainbridge Drive to Dead End October 1, 2018 to October 5, 2018
There will be single lane restrictions, both directions for sidewalk installation/repairs. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.51929416889323 39.12906014280247,-86.51870408290996 39.12920162756947,-86.5179745220579 39.12920995019394,-86.51758828395977 39.12930982161123,-86.51660123104229 39.12999227250566,-86.51636519664898 39.13005053020251,-86.51618280643596 39.13005053020251,-86.51592531437053 39.130017240095924,-86.51457348102703 39.12942633808575,-86.51438036197794 39.129418015486806,-86.51398339504377 39.129509564020935)
South Weimer Road South Weimer Road Between Wesst Wapehani Road and West Tapp Road October 2, 2018 to October 4, 2018
Lane restriction due to paving.
Street
LINESTRING(-86.5638838639241 39.14401607793894,-86.56235114256181 39.143049351702615,-86.56216725015453 39.142668915330574,-86.56196275922025 39.13658248167545)
IU Fine Arts E. 13th Street from Fess Avenue to Woodlawn Avenue. October 3, 2018 to October 26, 2018
Weddle Brothers has been contracted by IU to perform a renovation on the building located at 802 E. 13th Street.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52475291516149 39.17521819290104,-86.52362638737522 39.17518492415513),LINESTRING(-86.52362638737522 39.175201558530034,-86.52362638737522 39.17518492415513),LINESTRING(-86.52362638737522 39.17519324134307,-86.52362638737522 39.175201558530034),LINESTRING(-86.52362638737522 39.175201558530034,-86.52371221806371 39.17519324134307))
East Pierson Court East Pierson Court off of South The Stands Drive October 4, 2018 to October 6, 2018
Closed for paving.
Street
LINESTRING(-86.51005533832164 39.12826386981493,-86.51005533832164 39.12826386981493,-86.51049725910514 39.12825197871274)
Arlington Rd Arlington Rd between 17th and 20th St October 8, 2018 to October 9, 2018
A lane closure on the north side of the roundabout will result in flaggers at each leg of the roundabout. This lane closure will be in place all day while MCCSC students are on Fall Break 10/8-10/9. More information below: E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic at this location to one lane of two-way traffic during the hours work is underway, . Signage and traffic control personnel will be in place
Planning & Transportation
LINESTRING(-86.54760993791197 39.17939307074437,-86.5480820066986 39.17966752100048,-86.5485326178131 39.18003761131598,-86.54880620313261 39.18036195852983)
North Fee Lane North Fee Lane from East 11th Street to East Lawn Lane October 8, 2018 to October 10, 2018
There will be single lane restrictions, both directions for pavement markings. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.51888406060034 39.1739774665152,-86.51888406060034 39.17326217238735)
Intersection of E 10th Street and North Forrest Avenue E 10th Street and North Forrest Avenue October 8, 2018
There will be single lane restrictions, both directions for street resurface. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.5223894972904 39.17176667860352,-86.52238413287238 39.17162943818889),LINESTRING(-86.52251287890509 39.171633596993274,-86.52227684451177 39.17162943818889))
East Thornton Drive East Thornton Drive between South Olive Street & South Huntington Drive October 9, 2018 to October 11, 2018
East Thornton Drive will be closed between 7 a.m. and 3:00 for tree and stump removal.
Street
LINESTRING(-86.51881407490642 39.149468377976234,-86.52081425173441 39.149299997135756)
East 1st Street 1200 block of East 1st Street between South Highland Avenue and South Ballantine Road October 10, 2018 to October 11, 2018
Road will be closed between 7:00 a.m. and 3:00 p.m. for tree and stump removal, weather permitting.
Street
LINESTRING(-86.51772845511547 39.159266578102574,-86.51910276571104 39.15927448119422)
iU Homecoming Parade Woodlawn Ave between 17th Street and 7th Street Closure of Woodlawn Ave both North and South lanes from 7th Street to 17th Street. October 12, 2018 17:00 pm to 21:00 pm
City of Bloomington will be closing both the North and South bound lanes of Woodlawn Ave from 7th Street to 17th Street on 10/12/2018 between 5pm-9pm for the IU Homecoming Parade.
Public Works
LINESTRING(-86.5235295651801 39.17897812491182,-86.5235295651801 39.168498251876485)
House Move - 17th St, Monroe St, 11th St, Adams St, Fountain Dr, 8th St From 17th and Fee to 1670 W 8th via 17th St, Monroe St, 11th St, Adams St, Fountain Dr, and 8th St October 14, 2018 06:30 am to 14:00 pm
House Move for Habitat For Humanity. Streets along the route will be closed to through traffic while the house is in the area. Officers will assist with directing traffic.
Planning & Transportation
LINESTRING(-86.5188673861084 39.17877659334627,-86.54710568261719 39.178976195389026,-86.54710568261719 39.1731209666458,-86.54985226464844 39.17318750607495,-86.54961623025515 39.169660829564776,-86.5502385027466 39.169927,-86.55064619851684 39.16961092249605,-86.556074989563 39.16961092249605)
Old SR 37 South Between Rogers Street and Fairfax Road October 15, 2018 to October 16, 2018
Traffic will be restricted to one lane during the hours of 8:00 am and 3:00 pm for bridge maintenance activities. Please use caution while traveling in this area. This is weather permitting.
Monroe County Highway Department
POINT(-86.53341313785148 39.10325135716727)
Cherry Lane Between Fairfax Road and Dutcherman October 15, 2018 to October 16, 2018
We will be performing ditching for drainage improvements along this segment of roadway. No lane closures, but the crews will be working along the roadway. Please use caution in this area.
Monroe County Highway Department
LINESTRING(-86.51704348397818 39.09720113706834,-86.51350296807853 39.09713452579527,-86.51289142442313 39.09660995982077)
Windsor Private Subdivision Thames Drive, Wexford Court and Duxbury Drive October 15, 2018 to October 19, 2018
We will be paving the roads in this subdivision. Weather Permitting. Please use caution while in this area, the work will be performed under flagging operations.
Monroe County Highway Department
LINESTRING(-86.51783601350647 39.27650366712908,-86.5179862172113 39.27710163831327,-86.51828662462097 39.27755011335205,-86.51897327012878 39.27783248505173,-86.52002469606262 39.27773282458179,-86.52090446061949 39.27778265483448,-86.52148381776672 39.27769960439366,-86.52184859819275 39.27779926491084,-86.5221275479303 39.27793214537991,-86.52223483629089 39.27814807560458,-86.52197734422545 39.27897857026605,-86.52197734422545 39.279327375087945,-86.52219192094665 39.27960973962419,-86.52232066697935 39.27997515086389,-86.52208463258604 39.28025751278906)
East Heather Drive Water Line Project East Heather Drive, between South Pepper Chase Court and South Grasstree Court October 15, 2018 07:30 am to 15:30 pm
The City of Bloomington Utilities has scheduled a water line project, weather permitting. Signage and traffic control personnel will be present.
Utilities
LINESTRING(-86.52243604611408 39.126292743138436,-86.5233050818349 39.125801686271956)
South Walnut Street Stormwater Culvert Replacement Project South Walnut Street, between East 1st Street and East Dodds Street October 15, 2018 07:30 am to 15:30 pm October 19, 2018
The City of Bloomington Utilities has scheduled a stormwater culvert replacement project, weather permitting. The west lane of South Walnut Street, between East 1st Street and East Dodds Street, will be closed to all traffic for the duration of the project. Signage is in place.
Utilities
LINESTRING(-86.53365172219848 39.159390821875036,-86.53366245103453 39.157410858598666)
1200 Blk of East 1st Street East 1st Street closed between South Ballantine Rd and South Highland Avenue from 7:00 a.m. to 3:00 pm October 17, 2018 to October 19, 2018
For tree and stump removal
Street
LINESTRING(-86.51772268061345 39.15927309141816,-86.5191148811699 39.15928101532708)
Dutcherman Drive Cherry Lane to the dead end October 17, 2018 to October 18, 2018
We will be performing ditching for drainage improvements along this segment of roadway. No lane closures, but the crews will be working along the roadway. Please use caution in this area.
Monroe County Highway Department
LINESTRING(-86.51294314206902 39.09669813532926,-86.5099283391363 39.096656502993994)
South Fess Street South Fess Street closed between East 1st Street and East Maxwell Lane from 7:00 a.m. to 3:00 p.m. October 18, 2018 to October 19, 2018
Tree and stump removal
Street
LINESTRING(-86.52593169589824 39.159325310133596,-86.52596490165892 39.15784371089441)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.