Choose types
Hunters Creek Road, Phase I 2.85 miles east of SR 446 April 2, 2018 to October 1, 2018
This project is phase one of three phases. The road is being reconstructed. The improvements will include 2-10' paved lanes and a 2' aggregate shoulder with improved drainage facilities. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.33120759367742 39.00781679185715,-86.32992013335027 39.00921738565552,-86.32946662365637 39.01039894697425,-86.32989577709874 39.01126595284833,-86.32938079296788 39.01279986028186,-86.32775000988684 39.01573419919441)
Rhorer Road Old SR 37 South to Walnut St Pike May 1, 2018 to October 1, 2018
This project is part of the Fullerton Pike Corridor, Phase I. Rhorer Road will be closed for approximately 150 days for the road reconstruction. The intersection of Walnut Street Pike and Rhorer will have restricted lane movements through out the project. The detour route is Old SR 37 South to Fairfax Road. Gordon Pike will remain open during this duration but with construction along the corridor. For further information or questions please contact the department at 812.349.2555.
Monroe County Highway Department
LINESTRING(-86.53135322099078 39.121437233312264,-86.52666471963273 39.12144971862483)
Fullerton Pike, Phase I Rhorer Road May 7, 2018 to November 29, 2018
This segment of Rhorer Road is to be closed for the road reconstruction project and signal installation. Detour routes are posted for this closure.
Monroe County Highway Department
LINESTRING(-86.53135528781597 39.12145920805793,-86.52659168460553 39.12142591389073)
Trades District W 10th St May 14, 2018 to October 31, 2018
W 10th St between N Morton st and N Rogers st will be closed for construction.
Planning & Transportation
LINESTRING(-86.53612471891017 39.17168307578683,-86.5366879828033 39.17168307578683,-86.53681136441797 39.17163732895733,-86.53726197553249 39.171258876771816,-86.53737616100199 39.17123808263665,-86.5380091623295 39.17125471794526,-86.53837394275553 39.171387800272555,-86.5385670618046 39.171404435545725)
Tapp Road & Rockport Road Intersection Improvement Tapp Road & Rockport Road June 10, 2018 to November 23, 2018
Installation of a traffic signal and other improvements at the intersection of Tapp Road and Rockport Road.
Planning & Transportation
LINESTRING(-86.54948049435549 39.136365399922454,-86.54765659222537 39.13631546923446,-86.54875093350344 39.13633211280106,-86.5491586292737 39.135899378790896,-86.5481501186841 39.13688134829175)
Tapp Road and Pinehurst Drive Intersection of Tapp Road and Pinehurst Drive June 11, 2018 to November 23, 2018
The intersection of Tapp Road and Pinehurst Drive will be closed to traffic during the re-construction of the Tapp Road and Rockport Road Intersection Improvement Project.
Planning & Transportation
LINESTRING(-86.55000246835337 39.13667389442412,-86.55000246835337 39.136357667521)
East 15th Street East 15th Street from North Lincoln Street to North Dunn Street August 20, 2018 to September 28, 2018
There will be single lane restrictions, both directions for sidewalk and ADA ramp installation/repairs. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.53097487760122 39.176854563117104,-86.52843750787315 39.176879514085556,-86.52835167718466 39.17694604995805)
East Pepperridge Drive Water Project East Pepperridge Drive, between East Heather Drive and East Heather Drive August 27, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a water line project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52501917779351 39.12419560255995,-86.52441836297417 39.12383770334023,-86.52379609048272 39.12387515799492,-86.52271784245873 39.124595115820114,-86.52254081666374 39.1248364873168,-86.52250863015557 39.1253774893911,-86.52266419827843 39.1256854425622,-86.52295924127006 39.12598090987973)
Walnut Street Pike Walnut Street Pike at Rhorer Road, extending south for approximately 400 feet. August 30, 2018 to September 28, 2018
This segment of roadway will close for the reconstruction of the roadway and water line installation. This is scheduled for a 30 day closure, weather permitting.
Monroe County Highway Department
GEOMETRYCOLLECTION(POINT(-86.52665304301135 39.12131085813098),LINESTRING(-86.52666377184741 39.12131085813098,-86.52665304301135 39.121452358464154))
W Tapp Rd W Tapp Rd between S Kegg Rd and Adams St September 1, 2018 to October 27, 2018
There will be lane shifts on W Tapp Rd between S Kegg and S Adams beginning 9/1 and ending 10/27. Signage and barricades will be in place to direct vehicular traffic. Expect lanes to shift and signage to change as listed: • Phase 1 9/1/18-9/22/18 • Phase 2 9/22/18-10/13/18 • Phase 3 10/14/18-10/27/18
Planning & Transportation
LINESTRING(-86.56017958145783 39.13653360166177,-86.55524431687041 39.13650863638185)
Eastern Heights Eastern Heights Neighborhood Project September 17, 2018 to October 1, 2018
There will be single lane restrictions, both directions for pavement resurface project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
GEOMETRYCOLLECTION(LINESTRING(-86.47925575316815 39.176180407356895,-86.47867639602093 39.17553167284967,-86.47821505607037 39.17578950394744,-86.47808631003767 39.176313480362126,-86.47682030738262 39.176288529192846,-86.47678812087443 39.175415232689176,-86.47675593436627 39.174899566803305,-86.47710469926777 39.17447578336768,-86.47866566718487 39.1725790235177),LINESTRING(-86.47880514205364 39.175440184168394,-86.4767988497105 39.17539859836478),LINESTRING(-86.47866566718487 39.17553167284967,-86.4798780256596 39.17481639453209,-86.48025353492169 39.17450865627302,-86.4808650785771 39.17385990634159,-86.4813371473637 39.17356879865767,-86.48172338546185 39.17350225958927,-86.48208816588787 39.173593750792094),LINESTRING(-86.48082216323284 39.17383495430161,-86.48065050185589 39.173152928447166,-86.48045738280683 39.17300321456929,-86.47992094100384 39.17300321456929,-86.47954543174176 39.173186198154525,-86.47842963279156 39.174442118093964),LINESTRING(-86.4802213484135 39.17449202173418,-86.47712071479228 39.174483704463285))
Arlington Rd Arlington Rd north of 17th St to Prow Road September 24, 2018 to January 1, 2019
E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic at this location to one lane of two-way traffic during the hours work is underway, . Signage and traffic control personnel will be in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.54727734399412 39.179301587087565,-86.54809273553467 39.179700787625336,-86.54873646569823 39.180332850507654,-86.5498093493042 39.18199614672781,-86.55010975671387 39.182727984597165,-86.5501526720581 39.18402531482246,-86.55023850274658 39.184723867333986,-86.551397217041 39.18698579925939,-86.5518263704834 39.18831631344736),LINESTRING(-86.55178345513914 39.18834957597937,-86.55178345513914 39.18834957597937))
South Baytree Lane Water Services Project South Baytree Lane, between East Pepperridge Drive and East Pepperridge Drive September 24, 2018 to September 28, 2018
The City of Bloomington Utilities has scheduled a water services project, weather permitting. Signage will be in place.
Utilities
LINESTRING(-86.52269758058156 39.124596971157445,-86.52248300386039 39.12423907397701,-86.52251519036855 39.123772972597294,-86.52247227502431 39.12365644677047,-86.52260102105704 39.12361483035707,-86.5227404959258 39.12361483035707,-86.52325548005668 39.12361483035707,-86.5235129721221 39.123648123489744,-86.52373827767934 39.123831235438416)
East University Street East University Street between Ballantine Road and South Hawthorne Drive September 25, 2018
For tree and stump removal
Street
LINESTRING(-86.51912353706918 39.16018740252349,-86.52021787834725 39.16018012343119)
South Weimer Road South Weimer Road from West Bloomfield Road to West Tapp Road September 27, 2018 to September 28, 2018
There will be single lane restrictions, both directions for pavement resurface project. The work will be performed from 7:00am to 3:00pm, weather permitting.
Street
LINESTRING(-86.56425036264054 39.15418128643435,-86.5639928705751 39.144130404543205,-86.56356371713272 39.143531300032606,-86.56279124093643 39.143298313568124,-86.56201876474013 39.142632633706256,-86.56214751077286 39.13670780561583)
Lotus World Music and Arts Festival 2018 West 6th St & West 4th St Between College & Walnut St September 27, 2018 to September 30, 2018
West 6th Street from North College and North Walnut and West 4th Street between South College and South Walnut will be closed from 7:00 a.m. Thursday, September 27 until Sunday, September 30th at 4:00 pm. (NOTE: 4th St Parking Garage remains OPEN and accessible throughout the weekend!!)
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.53486642494033 39.16757539247098,-86.53360578670335 39.16756499485962),LINESTRING(-86.53361115112138 39.167573312948804,-86.53361115112138 39.16756707438199),LINESTRING(-86.53489056482131 39.16560605745187,-86.53363529100231 39.16559773912999))
Lotus World Music and Arts Festival 2018 North Washington Street from E 7th to E 4th E 6th St from N Washington to North Lincoln September 28, 2018 to September 30, 2018
Washington St closed from 4th to 7th st and all connecting alleys (NOTE: Washington St between 6th & 7th will be ONLY accessible to residents of the block) ** 6th St from Washington St to Lincoln St and all connecting alleys will be closed
Street
GEOMETRYCOLLECTION(LINESTRING(-86.53234075164487 39.168549998481524,-86.53232465839076 39.16854583949478,-86.5323300228088 39.16756015270275,-86.53234075164487 39.16558873767619),LINESTRING(-86.53234075164487 39.16558873767619,-86.53234075164487 39.16559289683778),LINESTRING(-86.53234075164487 39.16558873767619,-86.53234075164487 39.16558873767619),LINESTRING(-86.5323300228088 39.16756015270275,-86.5310693845718 39.1675435165202),LINESTRING(-86.53105865573573 39.1675435165202,-86.5310693845718 39.1675435165202),LINESTRING(-86.53109084224391 39.16756015270275,-86.53107474898982 39.16753935747397))
E Kirkwood Ave E Kirkwood Ave Between S Washington St & S Lincoln St September 28, 2018 09:00 am to 12:30 pm September 30, 2018
E Kirkwood Ave Between S Washington St and S Lincoln St including all connecting alleys will be closed on Friday September 28th from 9:00 a.m. to 12:30 a.m. and again 4:00 pm to 12:30 a.m on Saturday September 29th.
Public Works
LINESTRING(-86.53232939315401 39.166580665384544,-86.53109021258913 39.1665640289703)
Lotus World Music and Arts Festival 2018 E 6th St September 28, 2018 07:00 am to 15:00 pm September 30, 2018
E 6th St will be closed between North Walnut St & North Washington St, and alley running North to midpoint of block.
Public Works
LINESTRING(-86.53361417127263 39.167568445425985,-86.53232671094547 39.16756220685872)
Lotus World Music and Arts Festival 2018 Kirkwood between Walnut St & Washington St September 28, 2018 07:00 am to 09:00 am September 30, 2018
E Kirkwood from N Walnut St to N Washington St from 7:00 am Friday, September 28, 2018 until 9:00 am Sunday, September 30, 2018 and all connecting alleys will be closed.
Public Works
LINESTRING(-86.53360954957935 39.16658747464413,-86.53233550029728 39.16658227576562)
Tamarron HOA Block Party North Callery Drive between addresses 808 and 806 September 29, 2018 16:00 pm to 22:00 pm
Tamarron HOA requests the Board’s permission to close a public street to hold a neighborhood block party on Saturday, September 29, 2018 from 4:00 p.m. until 10:00 p.m. so their neighborhood can get together for a neighborhood block party. Pending Board approval the Petitioner will be closing down a portion of the North Callery Drive between addresses 808 and 806.
Public Works
LINESTRING(-86.48496896393164 39.17525712425589,-86.48546964251118 39.174785816153076)
Hoosiers Outrun Cancer E 17th, N Indiana, E 13th, E Cottage Grove, E 11th, N Walnut Grove, N Fee, E Law, N Jordan, N Dunn, and N Woodlawn September 29, 2018 09:00 am to 11:30 am
The City of Bloomington Board of Public Works agrees that all or a portion of the following City streets may be utilized to conduct the Bloomington Hospital Foundation Hoosiers Outrun Cancer between the hours of 9:00 am and 11:30 am, on Saturday, September 29, 2018: E. 17th Street, N. Indiana Avenue, E. 13th Street, E. Cottage Grove, E. 11th Street, N. Walnut Grove, N. Fee Lane, E. Law, N. Jordan, N. Dunn Street and N. Woodlawn Avenue.
Public Works
LINESTRING(-86.52682634135583 39.183141096933014,-86.52685018263168 39.183954236350075,-86.51912542066877 39.18378791313211,-86.51559682540704 39.18375095225076,-86.51419015608137 39.183473746036356,-86.51252122486352 39.18242035163959,-86.51147218515274 39.18155175142962,-86.51094766398768 39.1803319968362,-86.51089997881667 39.17885347881531,-86.51252122486352 39.17885347881531,-86.51252122486352 39.177393410296645,-86.51283116930738 39.17656171265645,-86.51385637036168 39.17539731943194,-86.51521535713567 39.17386324801521,-86.51550145768435 39.17338268923842,-86.51895852911859 39.17399262971759,-86.5190777381171 39.17523097596862,-86.52100892860784 39.17512008078464,-86.52108045243533 39.17255094415657,-86.52696939293986 39.17253246025672,-86.52704091807702 39.179038294887675,-86.52665944849598 39.17907525824688,-86.52687402521717 39.17972211236449,-86.5271124432142 39.18049832873879,-86.52730317865957 39.18094187703218,-86.52694555035434 39.179999332865634,-86.52663560591049 39.179056777077335,-86.5282330106815 39.17901981370838,-86.52832837840418 39.18406511810758,-86.52794690882313 39.184157519861515,-86.52792306754729 39.18474888643388,-86.5280184339603 39.18515544801872,-86.52816148554433 39.185543527280174,-86.52768464824061 39.185802245682,-86.52687402521717 39.18574680619531,-86.52687402521717 39.18382487399401)
East Elliston Drive East Elliston Drive from South Bainbridge Drive to Dead End October 1, 2018 to October 5, 2018
There will be single lane restrictions, both directions for sidewalk installation/repairs. The work will be performed from 7:00 am to 3:00 pm, weather permitting.
Street
LINESTRING(-86.51929416889323 39.12906014280247,-86.51870408290996 39.12920162756947,-86.5179745220579 39.12920995019394,-86.51758828395977 39.12930982161123,-86.51660123104229 39.12999227250566,-86.51636519664898 39.13005053020251,-86.51618280643596 39.13005053020251,-86.51592531437053 39.130017240095924,-86.51457348102703 39.12942633808575,-86.51438036197794 39.129418015486806,-86.51398339504377 39.129509564020935)
East Hector Dr 4100 Block of East Hector Drive October 1, 2018 to October 2, 2018
Lane restriction due to paving.
Street
LINESTRING(-86.48056753912645 39.17307202234281,-86.48058925152985 39.17305419183839)
South Baytree Lane Street Repair South Baytree Lane, between East Pepperridge Drive and East Pepperridge Drive October 1, 2018 07:30 am to 15:30 pm October 12, 2018
The City of Bloomington Utilities has scheduled a street repair project, weather permitting. Signage will be in place.
Utilities
GEOMETRYCOLLECTION(LINESTRING(-86.52378119302354 39.12384788195564,-86.52353979421218 39.12367725496799,-86.52317501378614 39.12361483035707,-86.52274586034379 39.1236314769254,-86.52252055478652 39.123739679523624,-86.52248300386033 39.12393527610635,-86.52250446153245 39.12417248825449,-86.52254737687669 39.12435976043878,-86.52263320756514 39.12450957782775,-86.52269221616349 39.12457616323164),LINESTRING(-86.52271367383563 39.124592809572846,-86.52269221616349 39.12458032481729),LINESTRING(-86.52268685174545 39.12458448640274,-86.5226761229094 39.12457200164579))
South Weimer Road South Weimer Road Between Wesst Wapehani Road and West Tapp Road October 2, 2018 to October 4, 2018
Lane restriction due to paving.
Street
LINESTRING(-86.5638838639241 39.14401607793894,-86.56235114256181 39.143049351702615,-86.56216725015453 39.142668915330574,-86.56196275922025 39.13658248167545)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.