Choose types
Fullerton Pike, Phase I Rhorer Road May 7, 2018 to November 29, 2018
This segment of Rhorer Road is to be closed for the road reconstruction project and signal installation. Detour routes are posted for this closure.
Monroe County Highway Department
LINESTRING(-86.53135528781597 39.12145920805793,-86.52659168460553 39.12142591389073)
Trades District W 10th St May 14, 2018 to October 31, 2018
W 10th St between N Morton st and N Rogers st will be closed for construction.
Planning & Transportation
LINESTRING(-86.53612471891017 39.17168307578683,-86.5366879828033 39.17168307578683,-86.53681136441797 39.17163732895733,-86.53726197553249 39.171258876771816,-86.53737616100199 39.17123808263665,-86.5380091623295 39.17125471794526,-86.53837394275553 39.171387800272555,-86.5385670618046 39.171404435545725)
Tapp Road & Rockport Road Intersection Improvement Tapp Road & Rockport Road June 10, 2018 to November 23, 2018
Installation of a traffic signal and other improvements at the intersection of Tapp Road and Rockport Road.
Planning & Transportation
LINESTRING(-86.54948049435549 39.136365399922454,-86.54765659222537 39.13631546923446,-86.54875093350344 39.13633211280106,-86.5491586292737 39.135899378790896,-86.5481501186841 39.13688134829175)
Tapp Road and Pinehurst Drive Intersection of Tapp Road and Pinehurst Drive June 11, 2018 to November 23, 2018
The intersection of Tapp Road and Pinehurst Drive will be closed to traffic during the re-construction of the Tapp Road and Rockport Road Intersection Improvement Project.
Planning & Transportation
LINESTRING(-86.55000246835337 39.13667389442412,-86.55000246835337 39.136357667521)
W Tapp Rd W Tapp Rd between S Kegg Rd and Adams St September 1, 2018 to October 27, 2018
There will be lane shifts on W Tapp Rd between S Kegg and S Adams beginning 9/1 and ending 10/27. Signage and barricades will be in place to direct vehicular traffic. Expect lanes to shift and signage to change as listed: • Phase 1 9/1/18-9/22/18 • Phase 2 9/22/18-10/13/18 • Phase 3 10/14/18-10/27/18
Planning & Transportation
LINESTRING(-86.56017958145783 39.13653360166177,-86.55524431687041 39.13650863638185)
Arlington Rd Arlington Rd north of 17th St to Prow Road September 24, 2018 to January 1, 2019
E&B Paving, working on behalf of the City of Bloomington Utilities, has scheduled a water line installation project, weather permitting. To facilitate this work, it will be necessary to reduce traffic at this location to one lane of two-way traffic during the hours work is underway, . Signage and traffic control personnel will be in place.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.54727734399412 39.179301587087565,-86.54809273553467 39.179700787625336,-86.54873646569823 39.180332850507654,-86.5498093493042 39.18199614672781,-86.55010975671387 39.182727984597165,-86.5501526720581 39.18402531482246,-86.55023850274658 39.184723867333986,-86.551397217041 39.18698579925939,-86.5518263704834 39.18831631344736),LINESTRING(-86.55178345513914 39.18834957597937,-86.55178345513914 39.18834957597937))
IU Fine Arts E. 13th Street from Fess Avenue to Woodlawn Avenue. October 3, 2018 to October 26, 2018
Weddle Brothers has been contracted by IU to perform a renovation on the building located at 802 E. 13th Street.
Public Works
GEOMETRYCOLLECTION(LINESTRING(-86.52475291516149 39.17521819290104,-86.52362638737522 39.17518492415513),LINESTRING(-86.52362638737522 39.175201558530034,-86.52362638737522 39.17518492415513),LINESTRING(-86.52362638737522 39.17519324134307,-86.52362638737522 39.175201558530034),LINESTRING(-86.52362638737522 39.175201558530034,-86.52371221806371 39.17519324134307))
South Walnut Street Stormwater Culvert Replacement Project South Walnut Street, between East 1st Street and East Dodds Street October 15, 2018 07:30 am to 15:30 pm October 19, 2018
The City of Bloomington Utilities has scheduled a stormwater culvert replacement project, weather permitting. The west lane of South Walnut Street, between East 1st Street and East Dodds Street, will be closed to all traffic for the duration of the project. Signage is in place.
Utilities
LINESTRING(-86.53365172219848 39.159390821875036,-86.53366245103453 39.157410858598666)
Ketcham Road Between Cedar Bluff Road and Thrasher Road October 22, 2018 to November 20, 2018
This section of road will be closed for a bridge preservation project. Detour routes will be posted.
Monroe County Highway Department
POINT(-86.56687334941265 39.034052265843684)
Thomas Road Vernal Pike and Ratliff Road October 22, 2018 to October 24, 2018
The segment of roadway will be under flagging conditions for perform ditching activities. Please use caution when traveling in the area.
Monroe County Highway Department
LINESTRING(-86.63010395837424 39.18901091011185,-86.63061894250511 39.21667962069523)
Tanglewood Road Union Valley Road to the dead end October 22, 2018
This road segment will have lane restrictions for paving activities. Please use caution while traveling in this area.
Monroe County Highway Department
LINESTRING(-86.592710934634 39.231206252453546,-86.59205289935568 39.23147218980213,-86.59166666125753 39.23150543189985,-86.59070106601217 39.23150543189985,-86.58855529880026 39.23157191604801,-86.58716055011251 39.231688263155746,-86.58580871676901 39.231787989094556,-86.5855941400478 39.23202068240067,-86.58533664798237 39.232220133191674,-86.58535810565449 39.23245282506474,-86.58555122470356 39.23268551616616,-86.58619495486715 39.232984689305624,-86.58623787021138 39.233250619914315,-86.58591600512959 39.233483308370154,-86.58570142840841 39.23381571911139,-86.58570142840841 39.234414054477185,-86.58574434375265 39.23474646080908,-86.5856799707363 39.23516196650937,-86.58570142840841 39.235610709902005,-86.58608766650654 39.23595973055649)
Leonard Springs Road, west SR 45 to Fullerton Pike October 22, 2018 to October 23, 2018
This segment of road will be closed for paving operations, weather permitting. Detour routes will be posted.
Monroe County Highway Department
LINESTRING(-86.61417683773827 39.12234630174399,-86.61336144619776 39.12221312665764,-86.58452233486962 39.12221312665764,-86.58340653591942 39.122712531933246,-86.58276280575583 39.12294558651692,-86.58254822903466 39.123345106866594)
Westernmost lane of S. Walnut between First Street and Dodds closed to facilitate culvert repair. South Walnut Street October 22, 2018 to October 26, 2018
Lane of South Walnut closed to facilitate culvert repair.
Utilities
LINESTRING(-86.5337014655196 39.159338197475364,-86.53369171173463 39.15714495597135)
Spicer Lane Garrison Chapel Road to dead end October 23, 2018 to October 24, 2018
Spicer Lane will be under flagging operations for paving activities. Weather permitting. Please use caution while traveling in this area.
Monroe County Highway Department
LINESTRING(-86.64290919839536 39.14166884623609,-86.64732947885189 39.14171877312762,-86.64797320901545 39.14164388277703,-86.64903536378534 39.141152932950206,-86.64927139817866 39.141036435878505,-86.64995804368645 39.14086446365846,-86.65005460321099 39.14078957239903,-86.65062323152213 39.14073964484851,-86.65622368394523 39.140797893654025)
South Walnut Street Stormwater Infrastructure Repair Project South Walnut Street, between East 1st Street and East Dodds Street October 26, 2018 07:30 am to 05:00 am October 31, 2018
South Walnut Street, between East Dodds Street and East 1st Street, will be restricted to one lane of traffic. This lane restriction will continue for the duration of the project. Signage is in place.
Utilities
LINESTRING(-86.53358734918211 39.15743253917054,-86.53365172219848 39.15939586372721)

Please enable Javascript

To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.

This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.