Allen St. Bridge Bridge between S Morton and S Walnut (150-156 W Allen St) January 7, 2020 to January 7, 2027
County closed bridge to motor vehicles until it can be replaced. Bridge will remain open for bicyclists and pedestrians.
Planning & Transportation
LINESTRING(-86.53497807455625 39.15560747171148,-86.5349847800788 39.15559811226916)
E Gilbert Dr E Gilbert Dr from N Walnut St to N Lavern Dr May 1, 2021 to September 1, 2021 daily until September 1, 2021
E Gilbert Dr will be closed for sanitary sewer replacement.
Planning & Transportation
LINESTRING(-86.53331652707108 39.189363110139965,-86.53298272283654 39.18936728302555,-86.53242279315278 39.18920871319881)
7-Line, 7th Street Protected Bike Lane 7th Street from the B-Line Trail to North Indiana Avenue. June 1, 2021 to October 30, 2021
Eastbound lane closed to through traffic.
Planning & Transportation
LINESTRING(-86.53697688912268 39.168565471661935,-86.52705066426013 39.16851254375996)
Discovery Parkway East Discovery Parkway from IU Hospital to Old Range Road. June 28, 2021 to October 30, 2021
Multi-use trail construction. Westbound lane closed to through traffic.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.50080631205216 39.175586339267625,-86.50016470468856 39.17550344207967),LINESTRING(-86.50016470468856 39.17550344207967,-86.50002212527441 39.1755089685619,-86.49965141879764 39.17544265074639,-86.49929497026231 39.17542607128274,-86.4989599086391 39.17543159777108,-86.4988601030492 39.17537633286835,-86.49836820407042 39.175475809661975,-86.49819710877345 39.17553660096658,-86.49665012213008 39.175851609612295,-86.49627228668263 39.17584608315701,-86.49600851476647 39.17576318627525,-86.49586593535233 39.175669236357834))
South Olcott Blvd South Olcott Blvd from East Moores Pike to East Winston Place October 4, 2021 to October 28, 2021
Milling/Paving, weather permitting, 6:00 am to 4:00 pm
Street
LINESTRING(-86.48495560430314 39.15016706280082,-86.48490726159935 39.14997336692886,-86.48483071898501 39.149767173963255,-86.48483474754367 39.14962346335727,-86.48490726159935 39.149298551340195,-86.48489114736473 39.149061114686816,-86.4847420906947 39.1488049321361,-86.48446814870654 39.148598735747214,-86.48429492068462 39.14843627756082,-86.48418212104244 39.148276943206014,-86.4841378068973 39.148017633582924,-86.4841458640146 39.14789578897228,-86.48418212104244 39.14770521108133,-86.48443994879601 39.14740528417505,-86.48543097422395 39.146880409013704,-86.48560017368722 39.146736692513116,-86.48569283053617 39.146586727156176,-86.4857049162121 39.145786906522716)
Lane Closure on N Walnut 1800 North Walnut October 28, 2021 to December 1, 2021
CenterPoint Energy (through Miller Pipeline) will be closing the eastern most lane at approximately 1800 N Walnut daily to perform natural gas work. It is anticipated that the lane will open each afternoon after work has been completed, and remain open on weekends. Wright Traffic Control will be setting up all signage, barricades, and an arrowboard.
Planning & Transportation
LINESTRING(-86.533988814937 39.18303537795694,-86.53368425852737 39.18157600677213)
Lane Restriction - Fire Hydrant Installation 500 Block of N Woodlawn between 9th St. and 10th St. November 2, 2021
Please be advised that CBU crews have closed one lane on the 500 block of N. Woodlawn between 9th St. and 10th St. for a fire hydrant installation. Normal traffic flow is expected to resume at 4:00pm. We will be flagging.
Utilities
LINESTRING(-86.52348407756588 39.17164507226471,-86.52346368335724 39.17043215090328)
CBU Water Main Break Patterson/Grimes W Patterson/W Grimes between S Rogers St and S Walnut St November 5, 2021
Please be advised that CBU crews have closed W Patterson/W Grimes between S Rogers St and S Walnut St due to a water main break. Normal traffic flow is expected to resume by tomorrow.
Utilities
LINESTRING(-86.53864248086047 39.15381173465414,-86.53787022962386 39.153744123020005,-86.53707306687309 39.15345435823281,-86.5362260822344 39.15334811122099,-86.53480613676167 39.153338452072205,-86.53371003812192 39.153338452072205)
IUSF Little 500 Street Sprints E 7th November 6, 2021 09:00 am to 19:00 pm
Indiana University Student Foundation Street Sprints
Public Works
GEOMETRYCOLLECTION(POINT(-86.51935288613069 39.16845302641363),POINT(-86.52074795555696 39.16850294578097),POINT(-86.52116647638483 39.16841974681577),POINT(-86.51935288613069 39.168461346310636),LINESTRING(-86.52222887540944 39.16847798610172,-86.51935288613069 39.168461346310636),LINESTRING(-86.51936361743397 39.168461346310636,-86.51935288613069 39.168461346310636),LINESTRING(-86.51934215482741 39.168461346310636,-86.51935288613069 39.16845302641363))
Road Closed on N Elm Street between 7th and 8th Street N Elm Street between 7th and 8th Street November 6, 2021 09:00 am to 12:00 pm
Road Closed on N Elm Street between 7th and 8th Street
Parks & Recreation
LINESTRING(-86.54524656883277 39.169551165341005,-86.54526846131287 39.168661299652115)
Landscape maintenance on the West 3rd Street medians from Patterson Drive to Yancy Lane. West 3rd Street from Patterson Drive to Yancy Lane. November 8, 2021 07:30 am to 15:30 pm November 10, 2021
Landscape maintenance on the West 3rd Street medians from Patterson Drive to Yancy Lane. Lane closures from 7:30 am to 3:30 pm Monday 11/8 to Wednesday 11/10. One lane in the eastbound street and one lane in the westbound street adjacent to the medians will be temporarily closed to provide a safety zone for Parks staff.
Parks & Recreation
LINESTRING(-86.55316810609916 39.16435202658778,-86.57179336549859 39.16460158023588)
N Headley Rd N Headley Rd/N Hinkle Rd from E Maplecrest Dr to E Gramercy Park Dr November 15, 2021 to July 6, 2022
The southbound lane of N Hinkle Rd/ N Headley Rd will be closed for the construction of improvements to the Lake Griffy causeway.
Planning & Transportation
GEOMETRYCOLLECTION(LINESTRING(-86.51174219411425 39.19061370527572,-86.51183395760373 39.192427270196475,-86.51229277505114 39.19306734075863,-86.51229277505114 39.19370740549047,-86.5121551298169 39.19427634702424,-86.51311864645642 39.19672985461864,-86.51334805518013 39.19886326984221,-86.5142656900749 39.20039217756835),LINESTRING(-86.51431157181965 39.2006055108848,-86.51343981866961 39.20035662195261,-86.51022809653789 39.20177883254502),LINESTRING(-86.50999868781419 39.20213438069416,-86.50981516083526 39.203521001280876,-86.50825518151413 39.20440984623457))
Road Closure for Crane Placement on W 6th West 6th St between N Morton and N College November 18, 2021
Road closure on W 6th St between N Morton and N College Ave. Road will be closed for approximately 12-15 hours.
Planning & Transportation
LINESTRING(-86.53611477507312 39.167591527771805,-86.53487644201549 39.16757404905047)
ALL WAY STOP E Atwater Ave/ S Jordan Ave November 18, 2021 to December 2, 2021
Signal in All Way Stop until further notice due to accident
Street
LINESTRING(-86.51639730479823 39.16315125642424,-86.51638311353449 39.16294494597557,-86.5163937569823 39.16306047990139,-86.51656050433134 39.16306047990139,-86.51621636618546 39.16306047990139)
Downtown Holiday Lighting Ceremony: Kirkwood Closed between N. College and S. Walnut Kirkwood Closed between N. College and S. Walnut November 26, 2021 15:00 pm to 20:00 pm
Kirkwood Closed between N. College and S. Walnut
External Project
LINESTRING(-86.53482819242878 39.16659111399508,-86.5336288328401 39.16658588995588)
Please enable Javascript
To enjoy the best experience, please make sure Javascript is enabled, or switch to a browser that supports Javascript.
This service uses Javascript to display an interactive map of scheduled road closures, which helps visualize where roads are scheduled to close.