City Construction Projects
100-198 E Smith Ave
- Case Date:
- 8/31/2012
It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.
City Construction Projects
- Case Date:
- 2/7/2012
Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
City Construction Projects
- Case Date:
- 6/7/2017
Hunter and Eastside
City Construction Projects
Indiana University, Bloomington
- Case Date:
- 4/4/2016
Road closed signs are knocked over and are in the southbound lane of Woodlawn.
City Construction Projects
427 N Washington ST
- Case Date:
- 9/6/2016
Sidewalk has lifted due to tree roots
City Construction Projects
Indiana University Bloomington
- Case Date:
- 10/26/2016
Manhole cover removed on west side of Highland Ave. by Lambda Chi House.
City Construction Projects
- Case Date:
- 5/6/2017
Missing manhole cover. 2d east of Lincoln.
City Construction Projects
- Case Date:
- 2/24/2015
steel plates across Jordan and Hunter are moving you can see the whole down into the street
City Construction Projects
S State Road 46
- Case Date:
- 8/9/2015
Subsidence to manhole cover in far turn lane. College mall and SR46
While on 46, turning left onto E. 3rd St.
Manhole cover is tight to island divider. Next to storm drain.
City Construction Projects
555 N Morton ST
- Case Date:
- 8/11/2015
Side walk lift (5")