City Construction Projects
W 17th St & N Walnut St, Bloomington, IN 47404, USA
- Case Date:
- 6/22/2022
Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.
City Construction Projects
- Case Date:
- 4/20/2022
The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.
City Construction Projects
- Case Date:
- 6/14/2022
Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?
City Construction Projects
- Case Date:
- 5/11/2023
Lumber on round about Tapp Road going west just before taking 69N towards Indpls. Could be dangerous if it gets on rotunda especially at night!
City Construction Projects
- Case Date:
- 9/7/2022
Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.
City Construction Projects
- Case Date:
- 12/3/2022
Orange barrels on 17th street , are creating a hazard pulling out of willis drive .
City Construction Projects
- Case Date:
- 1/29/2021
There is a utility cut near the intersection of E First and Henderson near #521, that has not been properly paved over. This can be a hazard to motorists' tires, since there is no warning sign at all about this cut.Especially at night not visible.
City Construction Projects
- Case Date:
- 7/11/2022
In front of house 725 E Second Street is a nasty utility cut.
City Construction Projects
- Case Date:
- 8/7/2022
Call toes second and Lincoln and second and College. Popo also third and Cory.
Utility cut 914 E. Atwater has sunken
City Construction Projects
- Case Date:
- 12/22/2022
The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.