uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (54)

closed #180396

City Construction Projects

W 17th St & N Walnut St, Bloomington, IN 47404, USA

Case Date:
6/22/2022

Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.

closed #179574

City Construction Projects

Case Date:
4/20/2022

The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.

closed #180319

City Construction Projects

Case Date:
6/14/2022

Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?

closed #183770

City Construction Projects

Case Date:
5/11/2023

Lumber on round about Tapp Road going west just before taking 69N towards Indpls. Could be dangerous if it gets on rotunda especially at night!

closed #181401

City Construction Projects

Case Date:
9/7/2022

Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.

closed #182195

City Construction Projects

Case Date:
12/3/2022

Orange barrels on 17th street , are creating a hazard pulling out of willis drive .

closed #174600

City Construction Projects

Case Date:
1/29/2021

There is a utility cut near the intersection of E First and Henderson near #521, that has not been properly paved over. This can be a hazard to motorists' tires, since there is no warning sign at all about this cut.Especially at night not visible.

closed #180573

City Construction Projects

Case Date:
7/11/2022

In front of house 725 E Second Street is a nasty utility cut.

closed #180926

City Construction Projects

Case Date:
8/7/2022

Call toes second and Lincoln and second and College. Popo also third and Cory. Utility cut 914 E. Atwater has sunken

closed #182309

City Construction Projects

Case Date:
12/22/2022

The newly redone exit on Clarizz for Bloomingfoods East and the new apartment complex is too narrow by about 3 feet. It is nearly impossible for two vehicles to be in the intersection at the same time, and turning in or out is in-executable while another vehicle is present. Personally I have seen many instances that a car has to stop in the intersection to allow for a car to clear the way. This is a highly trafficked intersection that will only become more heavily traveled once the multiplex is finished and occupied. Thus, this intersection poses great risk for incident in its current configuration.