Search Results: (59)

closed #125782

City Construction Projects

500-520 S Walnut St

Case Date:
4/18/2012

Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.

closed #128329

City Construction Projects

100-198 E Smith Ave

Case Date:
8/31/2012

It is not as safe as it should be to drop off and pickup students at the project school. The construction and parent traffic is directed to the alley between walnut street and Washington street. Often this vehicle traffic fails to yield to pedestrians making walking with children very worrisome.

closed #151354

City Construction Projects

Indiana University, Bloomington

Case Date:
4/4/2016

Road closed signs are knocked over and are in the southbound lane of Woodlawn.

closed #154032

City Construction Projects

Case Date:
7/12/2016

Citizen called, wanted to stay anonymous, reporting dangerous behavior by road crew working on Old 46. Drove toward her in her lane, head-on.

closed #179574

City Construction Projects

Case Date:
4/20/2022

The city recently replaced worn some worn curbs and this week repaved a big section of Park Ridge Road in Park Ridge East. The crew did an exceptional job! However, on the east side of the street between the park and Sheffield Drive there is a considerable amount of chunky gravel and dirt left on the sidewalk. Will the city please send someone to clean it up? Thank you so much.

closed #180319

City Construction Projects

Case Date:
6/14/2022

Location, Ticket 180318, NW corner N Park Ridge Rd & E Cambridge Dr. Perhaps others?

closed #181067

City Construction Projects

S Rogers St & W That Rd, Perry Township, IN 47403, USA

Case Date:
8/16/2022

New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.

closed #181310

City Construction Projects

500 W Fairway LN

Case Date:
9/1/2022

New construction site on South Rogers is scattering debris on the road. I live in Clear Creek housing edition and have to travel on South Rogers every day for work. In the past 2 weeks I have had two separate issues with the same brand of screws in my back left tire. I travel on I69 for work and have been traveling at 60 miles an hour with a screw in my tire. This has happened twice in two weeks at no fault of my own. This set of tires is less than 6 months old and today I found out from Royal Mazda that I need to purchase a new tire. This is unacceptable from a point of safety for the South Rogers neighborhood and an additional cost to citizen(s) of Bloomington.

closed #181401

City Construction Projects

Case Date:
9/7/2022

Badly needed stop light at Tapp Rd. & Leonard Springs. Also, a tree blocks visibility at this location.

closed #181800

City Construction Projects

7th & Washington, Bloomington, IN 47408, USA

Case Date:
10/12/2022

Hi there! It seems like every week there is an accident at the intersection of N Washington and 7th street. I’m wondering if you could put a stop sign there since it’s really dangerous for people driving and pedestrians crossing. Thanks!