1604 S Rogers ST
- Case Date:
- 4/7/1997
A CONCERNED CITIZEN CAME INTO THE ENGINEERING DEPARTMENT REGARDING THE CULVERT PIPE INSTALLED ON SOUTH ROGERS STREET ( A FEW YARDS NORTH OF #1604) AT THE RAILROAD TRACKS. THE GROUND/ROAD ON THE SOUTHEAST CORNER IS ERODING AWAY CAUSING A STEEP DROP OFF. REYNOLDS COMPANY DID A ROAD PROJECT AT THIS AREA APPROXIMATELY LAST YEAR OR THE YEAR BEFORE. THE CITIZEN IS CONCERNED THAT THE ROAD WILL CONTINUE TO ERODE AWAY, COULD SOMEONE FROM THE ENGINEERING DEPARTMENT TAKE A LOOK AT THE PIPE.
City Construction Projects
1809 E Southdowns DR
- Case Date:
- 10/4/1999
STREET CUT STILL NEEDS REPAIRED WHERE CBU REPAIRED MAIN BREAK
City Construction Projects
1901 S Weimer RD
- Case Date:
- 6/23/1998
Ms Sudbury is unhappy with the amount of traffic that is using Wapehani Road as a
cut-through from the Wapehani Hills development.
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
City Construction Projects
1924 E Marilyn DR
- Case Date:
- 4/5/2011
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
City Construction Projects
1969 S Henderson ST
- Case Date:
- 4/18/1997
ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.
City Construction Projects
2100 S Bent Tree DR
- Case Date:
- 2/3/1999
Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.
City Construction Projects
2202 S Rockport RD
- Case Date:
- 4/18/2000
There is currently straw around the drainage ditch in front of 2202 S. Rockport. There is not any grass growing, it is all mud filled. There is now a cement stone on the property, left from the construction, and the complaintant can not mow around it. Please call Ms. Smith with any updates on the situation.
City Construction Projects
2208 E Arden DR
- Case Date:
- 3/22/2020
Hello -- this cover has a hole in it and that seems dangerous.
City Construction Projects
2225 S High ST
- Case Date:
- 4/23/2022
A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?