City Construction Projects
323 S Grant ST
- Case Date:
- 4/5/2023
There was a temporary traffic sign placed in front of the property. The street construction is complete, but the sign was never removed. The sign was blown over by the wind and has become an eye sore. It would be great if the city could get that picked up...
City Construction Projects
322 E Cottage Grove AVE
- Case Date:
- 4/11/2023
City and/or Utility contractors (Duke, Meridiam, etc.) have been leaving signage scattered about the neighborhood. Currently, there is the following:
1) Tall, metal support at SW corner of Cottage Grove and Grant (322 E. Grant), 2) Identical metal support on south retaining wall of 414 E. Cottage Grove, 3) Pile of signage and sandbags on NE corner of 325 E. 10th Street, 4) Pile of signs in west yard of 418 N. Grant, 5) Bag of construction waste (NaOH ?) sitting on east side of Lincoln near 518 N. Lincoln.
City Construction Projects
2711 N Dunn ST
- Case Date:
- 4/13/2023
Workers installing optic fiber cable in the neighborhood have left tools, trash, and a 15-20 foot pipe in our yard. We picked scattered stuff up but can't do anything with the tubing and pipe.
City Construction Projects
E 7th St, Bloomington, IN, USA
- Case Date:
- 4/17/2023
Left on Washington and Lincoln intersection as well. The curb is creating issues because it sticks out to far. Can you please update this
And if the vehicle cuts too close vehicle can be caught in the curb. Someone should check police reports and see how often police must do this. Pour gravel inside
They need to be filled with concrete because there are weeds in the curb area. Concerned about people falling off of curb area worried about bicyclists falling in.
Project feels unfinished
City Construction Projects
W 17th St & N College Ave, Bloomington, IN 47404, USA
- Case Date:
- 4/19/2023
My guess is you are aware that: (1) Driving west on 17th there is a small no left turn sign. (2) Drivers (to be kind) apparently aren't seeing the sign (surely they aren't ignoring it). Anyway, it is causing some big backups at times. I was there twice today and both times someone waited to turn left onto College. Not sure it is solveable, but hopefully there is something.
City Construction Projects
- Case Date:
- 5/11/2023
Lumber on round about Tapp Road going west just before taking 69N towards Indpls. Could be dangerous if it gets on rotunda especially at night!
City Construction Projects
1907 S Sussex DR
- Case Date:
- 11/1/2023
Fiber construction contractors (AEG?) were in our neighborhood (Sycamore Knolls) at the start of October. They've since moved on, but left open holes and piping sticking out the ground all over the place. These were visible, but with the falling leaves they have become numerous trip hazards spread throughout the neighborhood.
City Construction Projects
317 S Rogers ST
- Case Date:
- 12/6/2023
I let you know there duke engery doing road work 321 N Rogers St
Bloomington, IN 47404
United States
City Construction Projects
- Case Date:
- 12/12/2023
Kyle do you know when duke project done on 321 Roger street
City Construction Projects
- Case Date:
- 12/12/2023
Will our reports and inquiries be professionally responded to? We cannot get a response from Gray