City Construction Projects
401 N Morton ST
- Case Date:
- 8/9/1996
Sidewalk on Maple from 5th to 6th was recently replaced. While it needed to be replaced, this was a historic sidewalk as are many on the west side. Policy should be developed to preserve historic sidewalks in original condition when repairing/replacing.
City Construction Projects
1210 W 8th ST
- Case Date:
- 12/14/1995
Street Dept. is installing a handicap ramp in front of his property. He says that the property is not handicap accessible and that there shouldn't be a ramp there. Sidewalk crews told him that they are required to put in ramps per ADA.
City Construction Projects
502 N INDIANA AVE
- Case Date:
- 8/1/1995
WITH THE NEW SIDEWALK GOING IN ON 500 BLOCK OF INDIANA, MR. DEKALB IS CONCERNED ABOUT HIS RETAINING WALL.
City Construction Projects
1204 E Wylie ST
- Case Date:
- 5/17/1995
A section of sidewalk was removed last fall and was never replaced.