Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
Hi, I ride my bike to work from Tamarron to North Walnut. Usually I take the bike route, including the Grimshaw Trail beside the train tracks, then cross the Bypass to Eastgate. Because of the construction on the Bypass, Eastgate is now closed, but there is no warning until you actually get there, which is very inconvenient. I also don't know how else I can get to my destination without either going all way down to 3rd, which would add about 10 minutes to my trip in each direction, or take my life into my hands by riding on 10th (I know, I know, the spandex brigade do this, but at 49 I've moved beyond the "live fast, die young, leave a good looking corpse" philosophy). What I would like to know, is how can I get to work safely if I can't go from the Grimshaw Trail over to Eastgate, and why do you not warn cyclists a little earlier (like say at Pete Ellis Drive and maybe Union Street on the other side) that Eastgate is closed so we don't waste even more time heading in that direction? Thanks, Gerry Matthews
Regarding construction on South Walnut Street- at the intersection with second street, motorists are trying to go north from both lanes south of second into the single lane north of second street. These lanes need to be clearly marked during construction as typically the far left lane is for left turns only. Please make it easier for people to know where to go. Thanks.
Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.
Mr. Madsen called to express his concern about the efficiency of tax money on the sidewalk sweeper the City just purchased. He believes the City merchants should sweep their own sidewalks, and in the winter should shovel their own walks to better promote people to use the dowtown area. This was just a general complaint to voice his concern.
Mr. Stidd called and said that the road at 5717 S. Rogers was supposed to have been cleaned up by CBU contractor, but it is extremely dusty and dirty.
Rockport between 37 and Country Club has become very hazardous during the detour. Tapp Rd construction has taken far too long for the size of the project. Its not a long section of road. why hasn't this project been finished and reopened? If there's a valid problem, city or county should monitor the traffic.
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
Steve does not understand why contruction projects around campus and the kirkwood area begin exactly when the students return to school. Why don't they start in the summer when there is much less traffic?