City Construction Projects
2225 S High ST
- Case Date:
- 4/23/2022
A new walkway and rail was installed in 2020 along Rogers Road to make it safer for children to walk to school. Shortly after it was completed a tree fell and damaged the railing for a bridge which is about 15 feet above Jackson Creek. The tree was removed but the railing was not repaired, it was simply wrapped with caution tape. This may have been adequate temporarily but it has been left this way for over a year. This is unsafe and an eyesore. Can you please arrange to have this properly repaired?
City Construction Projects
2215 W 3RD ST
- Case Date:
- 6/16/2004
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
City Construction Projects
2208 E Arden DR
- Case Date:
- 3/22/2020
Hello -- this cover has a hole in it and that seems dangerous.
City Construction Projects
2202 S Rockport RD
- Case Date:
- 4/18/2000
There is currently straw around the drainage ditch in front of 2202 S. Rockport. There is not any grass growing, it is all mud filled. There is now a cement stone on the property, left from the construction, and the complaintant can not mow around it. Please call Ms. Smith with any updates on the situation.
City Construction Projects
214 E 15th ST
- Case Date:
- 4/20/2022
Construction site utilizing alleyway creating potholes and divots
City Construction Projects
2100 S Bent Tree DR
- Case Date:
- 2/3/1999
Mr. Jones wrote letter dated 2/2/99 that stated that CBU crews constructed sanitary sewer thru east end of his property during 1995. The surveyor stake for the property line marker was removed and not replaced. Mr. Jones states that the easement agreement provides that the property will be returned to the original condition prior to construction work. Mr. Jones would like the marker replaced.
City Construction Projects
205 E 17th ST
- Case Date:
- 8/22/2015
Water shut off cover missing
City Construction Projects
201-251 North Lincoln Street
- Case Date:
- 6/21/2017
Hi,
There's a couple of large road cuts at the intersection of Lincoln and 6th St. If the city is not planning on filling these any time soon could we at least get the sharp edges softened? Sometimes I've seen this done and it makes road cuts much easier to drive over without damaging your tires.
Thanks,
Vickie Nelson
Bloomington
City Construction Projects
2-54 E Winslow Rd, Bloomington, Indiana, 47401
- Case Date:
- 12/27/2019
Motorists are confused about which lane to be in going westbound on E. Winslow approaching S. Walnut since there is a solid white line dividing the two westbound lanes of the road. I have seen drivers in the right lane turning left onto southbound Walnut.
City Construction Projects
1969 S Henderson ST
- Case Date:
- 4/18/1997
ELEANOR BARKLEY CALLED ON 4/18/97. SHE WANTED TO COMPLAINED ABOUT CONSTRUCTION WORK DONE IN THE VICINTY OF HER APTS. AT 2ND & ADAMS. APPARENTLY, A WATER LINE WAS CUT BY THE CREW DOING THE WORK ON 4/15/97. THIS CAUSED MUD BUILDUP IN THE LINES IN HER APTS. MS. BARKLEY HAD TO PAY OUT A CONSIDERABLE AMOUNT OF MONEY TO CLEAN UP THE MESS AND MAKE THE APTS. LIVABLE FOR HER TENANTS. MS. BARKLEY FEELS THAT SHE SHOULD BE REIMBURSED FOR HER EXPENDITURES. SHE DOES NOT KNOW IF CREW WAS COB, CBU, OR PRIVATE.