closed #125024
City Construction Projects
- Case Date:
- 2/7/2012
Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
Wet cement through entire lane with no covering or cones or signage on 10th east of bypass heading east
The sidewalks in front of 806 & 810 W. 4th Street are in very poor condition. They are crumbling and cracked. They are hazardous to walk across and need to be replaced.
Received email from Leland Rogers concerned about the timing of the Marilyn Drive Sidewalk Project.
citizen querried in re plans for improvement for three locations: rodgers rd between sare and snoody, olcott in hyde park, and generally potholes throughout the city. said they were "aweful".
Mr. Potter expressed disapproval and a desire for the West Third Street Phase II project to utilize two way left turn lanes instead of a raised median.
Deb McMullen is upset that the city has spent all this money on the College Mall Road project, and the best the city could come up with was restricting only one business, namely Dr. Steeles, to no entry from the south. She says that it looks bad on the department.
Desires a cleanout for the slotted drain in the driveway. Desires a tree well for the gum tree on north side of drive. Desires drainage improvements on the southeast side. Desires opening in the median.
Ms. Black stated that she had heard the Weddle Bro's were only going to place sod on one side of the sidewalk. She was very concerned with this.
Line torn out by contractor with backhoe.