City Construction Projects
West 6th Street
- Case Date:
- 7/26/2020
Hello. I'm sorry I don't know side streets. ,If you go down west 6th St. Probably half way, there is three good side section of potholes. It's in areas where it's been pre filled some. Hole are 1 food deep. They have been there well over 1 year. They didn't get like the over night. I ride a Mt bike, they are very dangerous if hit
City Construction Projects
W TAPP RD
- Case Date:
- 8/20/1997
Noticed that City has blocked off the road through the medical center/COTA which was acting as an alternate route around the Tapp Road work. State is working on 37 exits for Fullerton Pike and Rockport Road and has them down to one lane. This is creating a very dangerous situation since Rockport is the official Tapp Road detour. Someone should look at this and open the road through the medical center or see if something else can be done before someone is killed.
City Construction Projects
W Marquis DR
- Case Date:
- 8/26/2020
Caller said that semi's are taking w 17th to N Lismore Dr to W Marquis Dr. They are getting stuck and running over curbs. Also getting stuck and N Crescent Rd onto Fountain. Wants to know why they are routing them that way.
City Construction Projects
W 17th St & N Walnut St, Bloomington, IN 47404, USA
- Case Date:
- 6/22/2022
Since cross traffic is not permitted on 17th Street between College and Walnut and east of Walnut, it seems the traffic light signaling through its regular cycle is needless and leading to long backups on Walnut. At least make it flashing yellow.
City Construction Projects
W 17th St & N College Ave, Bloomington, IN 47404, USA
- Case Date:
- 4/19/2023
My guess is you are aware that: (1) Driving west on 17th there is a small no left turn sign. (2) Drivers (to be kind) apparently aren't seeing the sign (surely they aren't ignoring it). Anyway, it is causing some big backups at times. I was there twice today and both times someone waited to turn left onto College. Not sure it is solveable, but hopefully there is something.
City Construction Projects
S State Road 46
- Case Date:
- 8/9/2015
Subsidence to manhole cover in far turn lane. College mall and SR46
While on 46, turning left onto E. 3rd St.
Manhole cover is tight to island divider. Next to storm drain.
City Construction Projects
S Rogers St & W That Rd, Perry Township, IN 47403, USA
- Case Date:
- 8/16/2022
New traffic patterns require 4way stop or light. Please do not wait for the subdivision to be completed. Install now please.
City Construction Projects
S ROCKPORT RD
- Case Date:
- 9/18/1997
Rockport between 37 and Country Club has become very hazardous during the detour. Tapp Rd construction has taken far too long for the size of the project. Its not a long section of road. why hasn't this project been finished and reopened? If there's a valid problem, city or county should monitor the traffic.
City Construction Projects
S COLLEGE AVE
- Case Date:
- 9/8/1997
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.
City Construction Projects
S COLLEGE AVE
- Case Date:
- 9/8/1997
Citizen says City has shown poor planning by closing off College Ave right when all the students have come back, and when 4th street is also closed for a project. Why couldn't this have been done earlier in the summer when traffic wasn't so bad? College is one of the busiest streets in town and this should have been anticipated and planned better. Note: This is FYI only, citizen did not want a response.