uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (90)

closed #155009

Traffic Related Complaints

Case Date:
8/22/2016

Intersection of North/South Bryan Avenue and East 5th Street. Vehicles traveling in excess of posted speed limits, sometimes not stopping at the posted stop sign, and it is a school bus stop for Elementary Students. South Bryan Avenue also has an issue with vehicles speeding to get to the traffic light at South Bryan Avenue and East 3rd Street. There are several children that live on this street and people don't always see them unless an adult is standing/walking in the road with them. There are no true sidewalks and it is VERY unsafe for the children.

closed #155041

Traffic Related Complaints

Case Date:
8/23/2016

With students returning, I've noticed an uptick in traffic speeding down North Washington between 12th and 10th street. I feel like the problem is only going to increase as the new apartment building at 714 N Walnut is completed. With several children that play in the neighborhood, I'm concerned with their safety. Can traffic calming measures be investigated for this area?

closed #148081

Traffic Related Complaints

Case Date:
9/6/2015

Why isn't the 17th st roundabout finished? Please apply the final asphalt topcoat.

closed #165760

Traffic Related Complaints

Case Date:
8/31/2018

I'm concerned that with the closure of Walnut St. Pike/Rhorer Rd., there will be a lot of traffic diverging through the Sherwood Oaks neighborhood, particularly on Allendale. We already have a lot of problems with individuals speeding down that street, and this will only make it worse. Is there any way that there can be the temporary speed bumps installed like there is through the Broadview & Summit areas right now? We would greatly appreciate it!!

closed #165986

Traffic Related Complaints

Case Date:
9/19/2018

Every day people use the right turn only lane to go straight through the light when another person is waiting to turn left. There have been many close calls between cars and cars and pedestrians. It would be more productive to change it to a left only lane and then a straight or right turn only lane.

closed #183260

Traffic Related Complaints

Case Date:
3/28/2023

Will the City work with Duke Energy and its contractors to properly manage traffic around the work of Duke de-beautifying Bloomington? The flaggers are not helpful and not managing traffic in an efficient way to keep people moving safely around the work. As a driver, you are just on your own to try to figure out what some person lazily waving a flag in the breeze intends for you to do, and go head-on against oncoming traffic who also has no clue what to do.

closed #184575

Traffic Related Complaints

Case Date:
7/12/2023

The traffic management by the company doing construction at the intersection of Henderson and Winslow is really frustrating. I know disruption is expected with construction, however, I would expect: 1. some clear signage, both in advance (there's nothing on Henderson/Walnut Pike)) as well as directing traffic (literally construction guys pointing fingers at this large, busy intersection with multiple turn lanes. Not effective or safe. And they have the audacity to yell at some of the cars not listening to their unclear pointing). 2. I would expect some respect to get traffic through when they can. I sat there for 10 minutes this morning when there was multiple instances where they were in between tasks and could have let us go for a few minutes, but they kept us waiting.

closed #184774

Traffic Related Complaints

Case Date:
7/26/2023

The pedestrian crossing at 10th Street and John Hinkle Place by Woodbridge apartments is very unsafe. I cross there every morning to get to the bus stop on the other side of the street. Cars don't slow down, and I've never had someone stop to let me cross before if though I'm waiting. They pick up speed on the slight hill in both directions. Could there be a flashing light, a pedestrian-triggered stoplight, or some other way of allowing safe crossings at that busy road to access the bus stop?

closed #184894

Traffic Related Complaints

Case Date:
8/4/2023

Please remove the confusing road closed and road closed ahead signage on Rogers street off of kinser pike, as the road is routinely open and causing traffic issues. All of this was supposed to be done prior to school beginning. When will the 17th street stuff with duke be finally completed? This town is causing construction fatigue as of late. Very worries about even more future re-routing and closures over long periods of time.

closed #185045

Traffic Related Complaints

Case Date:
8/15/2023

We just moved back to Bloomington after being overseas the past two years. In the two weeks here, at the traffic circle near our house there have now been three incidents where traffic just barrels into the circle at E. Rogers and S. Sare Rd. without caring about the traffic already in it. We have had to stop from being hit on two of these occasions, the other we observed. Is there any signage or other measure that can be done to make this intersection more safe? Thank you for any attention you can give to this.