closed #151316
Traffic Related Complaints
Indiana University, Bloomington
- Case Date:
- 3/30/2016
Missing stop sign on west side of 11th and Woodlawn
Missing stop sign on west side of 11th and Woodlawn
New paint on 3rd St is already beginning to chip away.
Stop sign (and pole) are missing on SE side of intersection of Kwood and Indiana. Perhaps related to the Homecoming Parade. Report filed on behalf of IU Campus Bus Service. 812-855-8384
Dashed white line dividing lanes of traffic is almost none-existent west of Jordan on Third.
12th St east of Indiana. Knocked down speed limit 25 sign. See photo. Thanks.
When will this double turn lane onto 37 be open. It backs up the left lane back past Hardee’s during high volume traffic. The turn lane should be timed longer on the 3rd and 37 exit so traffic can flow better
To whom it may concern, I am a concerned citizen and tax payer that would like to bring up an issue and question pertaining to the road construction in Bloomington, IN. In particular, my query pertains to the construction drums/barrels that are located on State road 46/45 between North Walnut street and Ellettsville, IN. I would like to know why there has been construction drums/barrels spanning this location for 3-4 weeks now, at least, with no construction working at this location. I drive home every day around 2-3pm and have not once seen construction crew at this location working since the drums went up. There have been crew work on a light down by Kinser/46/45 the last couple of days, but if this is the case i don't see why construction barrels are running to Elletsville. These construction barrels are blocking off a whole lane of traffic causing uneeded delays in travel using one if not the busiest road in Bloomington. I understand there may be scheduling conflicts with getting road crew etc out but to block miles of road with no one working on the road for weeks/months is uncalled for and does nothing but hurt the people that travel the road which consequently are the same people that paid for it. I don't think its unreasonable for an explanation. I don't understand why you would inconvenience people and shut down half the road for miles when quiet literally no one is working on the road. It seems a better solution would be to keep the road free until you are ready to start working on it, then place the drums. I look forward to hearing back on this issue and please let me know if you have any questions. Thanks, Dustin Headley
The stop sign at Holiday Dr. and Franklin Dr. is frequently parked too close to. If the curb were painted here or a similar deterrent I believe I could safely drive through Holiday drive towards Franklin with cars parked on both sides much more safely than currently.
The left turn lane that was painted on the street where Hillside turns onto South Highland is invisible. We’re waiting for an accident to happen. Please paint the street ASAP. Thank you.
The repaving project at the intersection of High and Moores Pike has been completed for months, but there are still no directional lines painted on the lanes. People are getting in the wrong lane to cross the intersection which is very dangerous. When will the arrows be painted on the lanes?