closed #55005
Sewer Problems (Sanitary Sewers)
319 S Fairview ST
- Case Date:
- 2/3/2000
Carl says that when city ran new sewer main down the alley beside this residence that owner was not connected. She is now having sewer backup.
Carl says that when city ran new sewer main down the alley beside this residence that owner was not connected. She is now having sewer backup.
Parking Enforcement reported water overflowing to Utilities. Linda from Utilities called to report that the clean out is overflowing in the yard at 319 N. Dunn St.
SEWER CLEAN OUT LEAKING. RICK SCHROEDER WENT TO 319 N DUNN AND FOUND THAT THE RESIDENCE OF 418 E 8TH WAS ACTUALLY HAVING THE PROBLEM. THEY HAVE A LONG SEWER LATERAL WITH TWO CLEAN OUTS. THE CLEAN OUT IN THE YARD OF 319 N DUNN WAS LEAKING
CHICKEN JUICE FROM FROZE CHICKEN ON SIMS TRUCK RUNS INTO SEWER DRAIN.
SAYS WE HIT SEWER LATERAL AS WE WERE INSTALLING MAIN ON DODDS BETWEEN GRANT AND WYLIE STREET.
MR. FAULTLESS CALLED MAYOR'S OFC. TO COMPLAIN ABOUT LACK OF CBU DECISION ON SEWERS ON 17TH ST. HE SAID HIS SEPTIC FAILED SO HE NEEDED DECISION ABOUT SEWER IMMEDIATELY. IF CITY DOES NOT INSTALL SEWER, MR. FAULTLESS SAID HE CAN HAVE HIS OWN SYSTEM INSTALLED. MR. FAULTLESS FELT ONE HOLDUP WAS LARGE WATER MAINS ON KINSER. MR. FAULTLESS WOULD LIKE CITY TO TRANSFER MONEY FROM ANOTHER FUND TO CORRECT PROBLEM. MR. FAULTLESS WANTED MAYOR TO FORCE UTILITIES TO MOVE AHEAD WITH PROJECT.
Sewer backup.
SEWER BACKUP
SEWER DRAINS BURP, AND BACKUP BLACK STUFF INTO TUB
Possible sewer backup. 4 houses involved