Potholes, Other Street Repair
1015 N College AVE
- Case Date:
- 10/1/2017
There is a roadway which was a former street going all the way west from College to Madison that runs in front of Crown Management Sunflower II Apts. and is the only way that residents of Sunflower II Apts and a Crown Management rental property at 1020 N Woodburn can get to their parking areas. The city has taken care of the surface of this roadway at least between Woodburn and College for many years. I am reporting today that this roadway needs to be repaved or at least have the uneven surface patched to allow for safe driving on it this coming winter. Crown Management has done their part by resurfacing and resealing their parking lot in front of the apartments just north of this roadway. Please (desperate tone in voice) come and smooth the surface of this very small but fully used roadway. Thank you.
Potholes, Other Street Repair
- Case Date:
- 9/29/2017
I respectfully request that you paint crosswalks at the corners of Daniel and Forrestor and David and Forrestor in the Hyde Park neighborhood. We used to have crosswalks, but they were covered over on those three corners during recent paving and need to be repainted. Many people cut through the neighborhood on those streets and often roll through the stop signs. The Crosswalk will make it safer for the children and others who cross those streets on the way to Schmalz Park. Thank you for considering this request. Have a wonderful autumn.
Potholes, Other Street Repair
- Case Date:
- 9/27/2017
The crosswalk marking on 10th Street pavement in front of the Psychology Building on campus is barely visible even in broad daylight. Please replace the white lines/bars. Thanks.
Potholes, Other Street Repair
2801-2805 South Kings Court
- Case Date:
- 9/25/2017
There are some potholes in our cul-de-sac on Kings Court (Hyde Park)
Potholes, Other Street Repair
410-414 South College Avenue
- Case Date:
- 9/21/2017
The pavement on Washington Street behind the recently completed Chocolate Moose Building is in really bad shape. It is kind of filled in but not level with old pavement and has lots of gashes in it. The bike lane there is especially bad. The new pavement south of 2nd street is great, especially where the cars are on the left side.
Potholes, Other Street Repair
- Case Date:
- 9/19/2017
North South alley between Dunn and Grant perpendicular to 5th and 6th
Potholes, Other Street Repair
- Case Date:
- 9/18/2017
Hoping that the bushes that impede into the alleys can be trimmed back again now that summer is ending. The alley just east of Woodlawn Ave heading to south to Hunter is the worst offender, but the alley going east from Woodlawn to Faculty could use some trimming also. They all tend to scratch the car as we navigate through those alleys on a daily basis. Additionally, there are some bushes on the south end of the Subway building that block half of the sidewalk so that you can't see to pull out south on Woodlawn until the front of the car is already into the northbound lane, but more importantly, they block the view of pedestrians walking south until they are walking out into the alley and into the path of cars coming out of the alley onto Woodlawn. I've asked the manager inside Subway who said he cared for the landscaping and he said he'd talk to the building managers. I've also called the building managers and discussed the issue with them and nothing has improved.
Potholes, Other Street Repair
101-151 East Allen Street
- Case Date:
- 9/18/2017
Street work at the intersection of Walnut and Allen left potholes that may need to be filled in.
Potholes, Other Street Repair
1812 E 2nd ST
- Case Date:
- 9/11/2017
We rent the house at 1902 E 2nd St. Somehow the metal pole for the "No Parking at Any Time" sign in our front yard was broken. The base is still in the ground but the sign and pole are now lying on the ground.
Potholes, Other Street Repair
- Case Date:
- 9/10/2017
There a new overlay going down in Park Ridge East I'm hoping? Thanks. Mostly curious on a timeline.