uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (261)

closed #188532

Potholes, Other Street Repair

401 N Sheffield DR

Case Date:
5/20/2024

The trucks carrying asphalt are spending down Sheffield Dr. They did it when they were removing the asphalt so I talked to them. Didn't help.

closed #172427

Potholes, Other Street Repair

4017 E Providence CT

Case Date:
5/13/2020

On Providence Ct. there is a large and growing area of asphalt that is breaking. Looks to be an old repair. Trash trucks make it worse.

closed #187020

Potholes, Other Street Repair

405 N Union ST

Case Date:
1/29/2024

Incredibly deep and wide potholes here. Again, I’ve seen too many close calls. People are trying to avoid them and end up going into oncoming traffic.

closed #188031

Potholes, Other Street Repair

409 N Park AVE

Case Date:
4/16/2024

Street has been washed out and needs repaired through this alley from N Park Ave to N. Fess Ave.

closed #172235

Potholes, Other Street Repair

4109 E Cambridge DR

Case Date:
4/14/2020

Cambridge Dr in Parkridge East has asphalt that is crumbling from the corner of Sheffield Dr to about 4110 Cambridge on the west side of the road. When it rains it flows down to the storm drains. Thanks for all you do and stay safe.

closed #188136

Potholes, Other Street Repair

415 N Walnut ST

Case Date:
4/24/2024

potholes.

closed #188584

Potholes, Other Street Repair

416 1/2 N Lincoln ST

Case Date:
5/24/2024

Alley is no longer paved, has vegetation and grass growing through out the whole alley

closed #175819

Potholes, Other Street Repair

416 E Lakewood DR

Case Date:
5/17/2021

The blacktop at the corner and into the middle of the street is deteriorating or missing

closed #184566

Potholes, Other Street Repair

416 E Lakewood DR

Case Date:
7/11/2023

Pavement @ 2922 ramble road west needs swept before more pavement can be added

closed #184567

Potholes, Other Street Repair

416 E Lakewood DR

Case Date:
7/11/2023

Pavement at 504 E Lakewood Drive needs swept before more pavement can be added