closed #188104
Potholes, Other Street Repair
High & Rock Creek @ Childs, Bloomington, IN 47401, USA
- Case Date:
- 4/22/2024
pothole northbound
pothole northbound
I wanted to report a pothole on the intersection with S High St and Greenbriar Ln. The pothole is located on the right side of Greenbriar Ln as you turn right on High Street. Thank you
potholes still here, attaching a photo now.
In the northbound lane of High Street just north of Meadowbluff Ct up through Wimbleton, there are three decent-sized potholes that would likely get worse over the winter. I'm a bit surprised that the crew working on the biking/walking path didn't fix these. Last seen on 13Oct21.
10 inch sinkhall
Why has the city torn up the asphalt and then just left it for 3 weeks? Why would you remove it so long before replacing it?
Big pothole on Sare Rd near intersection with S Mill Stone Way
Large pothole on the East part of the intersection at Eagleson & 2nd; particularly a problem as it is directly in the line of travel of car tires for all East-bound cars on the road, especially those turning.
This pothole is not visible from a distance and is very dangerous. I was going 15 mph since it is right by the stoplight at Jordan and Atwater and my back rear tire popped and the front passenger rim is completely bent. My car was undrivable and required roadside assistance to get it towed. I now need to have two tires, a rim and wheel replaced as well as a complete alignment done on my car. I am now left without a car for a week, I am forced to pay nearly $1000 in damages to my car and as a full time student who also works part time, this is a very large sum of money. The city needs to fix this quickly so that it does not happen to anybody else.
Kinser Pike road and sidewalk have been destroyed after the construction and gas line work. Why are you all just letting it be f'd up for so long? These need repaired ASAP before winter so the ice and snow don't exacerbate the already dangerous area. Shame we aren't IU or Eastside a-holes or you all would've had your nodes up our asses day after construction ended