Potholes, Other Street Repair
500 S Muller PKWY
- Case Date:
- 4/11/2024
The potholes going into The Village are INSANE. I have called and called the office and have yet to get a clear answer as to when these multiple potholes would be filled. One of my friends works in the office and said they are aware- and are also aware they are 4 inches deep. The road going into the complex is very narrow and now filled with potholes- making it impossible to avoid them. These will cause very serious damage to my car.
Potholes, Other Street Repair
- Case Date:
- 4/17/2024
Flooding down Brownridge is starting an erosion hole again the road side with a drop of about 3 ft. from the road bed. A short load of stone (2-3 yds maybe) added to the previous should solve it; the last treatment has remained stable and has worked well.
Potholes, Other Street Repair
- Case Date:
- 4/25/2024
The utility manhole covers in the Northbouand lane of Walnut Street from Miller Drive to Grimes are below the pavement level and need to be raised to pavement lever. This condition has existed since Walnut Street was re-paved years ago. Please fix. Thank you
Potholes, Other Street Repair
- Case Date:
- 5/8/2024
The street sign at S Churchill Court has faded out completely. It needs to be replaced. Visitors have difficulty finding out home on this court.
Potholes, Other Street Repair
- Case Date:
- 5/12/2024
Could the utility cut at the intersection of Nancy Street and Mark Street on the east side be paved, please?
Thank you.
Potholes, Other Street Repair
757 S Lincoln ST
- Case Date:
- 5/18/2024
The hole (and patch)m that was drilled in the north east part of the intersection of S. Lincoln St and Dodds ST by the fiber install people has washed out with the latest heavy rain storm.
To my undertstanding you might be patching in this area soon with the other Potholes that are along S. Lincoln Street and Wylie ST.
Thank you for your help!