uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (335)

open #188435

Potholes, Other Street Repair

1241 S Winfield RD

Case Date:
5/14/2024

Street cut on Winfield, just north of Valley Forge. Has been there for weeks - has this been forgotten? So bad that someone put cones in it. Thank you for looking!

closed #187648

Potholes, Other Street Repair

2515 E Caray CT

Case Date:
3/17/2024

Two large potholes in neighborhood. First is near intersection of Caray Ct and Claybridge Dr. Second is in Southern Oaks Dr (between Cedarwood Circle and Sare Rd). Also, there is no street sign on the intersection of Canada Dr and Claybridge Dr. Can the neighborhood get a street sign here? Thank you Ryan Niehaus

closed #188318

Potholes, Other Street Repair

Case Date:
5/8/2024

The street sign at S Churchill Court has faded out completely. It needs to be replaced. Visitors have difficulty finding out home on this court.

closed #188509

Potholes, Other Street Repair

757 S Lincoln ST

Case Date:
5/18/2024

The hole (and patch)m that was drilled in the north east part of the intersection of S. Lincoln St and Dodds ST by the fiber install people has washed out with the latest heavy rain storm. To my undertstanding you might be patching in this area soon with the other Potholes that are along S. Lincoln Street and Wylie ST. Thank you for your help!

closed #176662

Potholes, Other Street Repair

1028 W Kirkwood AVE

Case Date:
7/23/2021

Please come and pave our ally! We cannot get in our out of our driveway without hitting the bottom of our cars on the road because of the big holes missing in front of our driveway. A while back some men came and scattered little bits of asphalt along the ally, which did nothing but make the whole ally worse. The entire ally needs repaved dinner than later because the lack of upkeep to the ally is causing damage to our cars. We are documenting all the damage that is being caused to our vehicles because of the negligence of the city to properly maintain the ally and we are also taking note to the fact that the first report we submitted only resulted in the men placing little bits of asphalt around the ally that has made the conditions worse AND the second report we have submitted is still currently open, no response has been submitted to us, and no repairs have been completed. I will continue to report these repairs being needed until the work is finished.