closed #160457
Potholes, Other Street Repair
715 W 3rd ST
- Case Date:
- 8/4/2017
I'm wondering if you can tell me when W 3rd St is going to be repaved and the speed bumps re-installed (after sewer construction earlier this year). Thanks! Jaclyn
I'm wondering if you can tell me when W 3rd St is going to be repaved and the speed bumps re-installed (after sewer construction earlier this year). Thanks! Jaclyn
The general condition of 3rd Street, from Jackson to Euclid is full of severe potholes.
Pothole near south shoulder, eastbound 5th St/ W Kirkwood. Across the street from 816 W Kirkwood