closed #175294
Potholes, Other Street Repair
205 E Vermilya AVE
- Case Date:
- 3/31/2021
There is a pothole in the middle of the street in front of 205 e Vermilya. And there is another larger one at the end of the street towards the apartments.
There is a pothole in the middle of the street in front of 205 e Vermilya. And there is another larger one at the end of the street towards the apartments.
Edge of asphalt is deteriorated and narrows the road surface unsafely for two-way traffic.
roll curb is crumbling between 2024 and 2026 Ramsey Drive; has worsened over the summer months.
In front of 1950 W. Arbor Ridge Way there is a large pothole in the asphalt paving near the curb.
On the southbound side of Rogers Street, just north of Chambers Drive
The side of the street is rapidly eroding on the south side of the corner of E Queens Way and E Montclair. Much of the loose debris clogs up the drain further down the road near S Chelsey Ct.
As you travel East on Winslow on the hill before the round-a-bout there is a pot hole on the right edge of the road. It started out small but is getting larger and you cannot avoid hitting it without crossing the line and getting in the way of traffic going west. Should be filled as quickly as possible.
Potholes at the intersection of Arden and Wilton.
Drainage tile / manhole cover is shifting in the roadway on the bridge. Gravel underlayment and overlying asphalt is shifting making a dip and mound.
With the realignment of Weatherstone Drive where it meets Hillside, please consider smoothing out the low curb at the entrance to Olive Street on the other side of Hillside--maybe just a little asphalt ramp. I cross Hillside there on my bicycle every day. It's rough on a bike if you can't get over to go across on the manhole cover on the left side. It's the only place in town I ever got a flat on my commuter bike. With the realignment it will be harder to get over to the manhole cover "ramp" when going south. Thanks for considering this opportunity to fix a nagging problem.