closed #185892
Potholes, Other Street Repair
2025 N Monroe ST
- Case Date:
- 10/5/2023
Part of the street was repaved but two large sections between Monroe and Arlington are nothing but potholes and missing patch. Please correct. Thank you.
Part of the street was repaved but two large sections between Monroe and Arlington are nothing but potholes and missing patch. Please correct. Thank you.
The alley off 9th street between lincoln and grant is deteriorating and has many potholes
Treacherously rough road; worried about potential damage to vehicle
There is a pot hole in the 800 bock of W 6th St. It should be patched before freezing weather ends access to hot asphalt.
Alleyway road is crumbled and impossible to drive on
Two new potholes opened up, hoped they could be patched before winter. THANK YOU!!
Small pothole in front of driveway at 11th and Blair. Hopefully can be repaired before winter!
There are two potholes in the eastbound lane of West Kirwood Avenue by Rose Hill Cemetery that are growing rapidly. Road base material is exposed.
Street repaving request for East Longview Ave. Looking for the 2024 paving schedule, may not be released yet. East Longview needs paving through its full length within Park Ridge, from N. Glenwood West through to N. Glenwood east cross streets. This would accomplish: -Repaving needed overall - Install updated traffic calming bump design replacing current full width bumps. -Stripe the bike path lane stripe as it's part of the E-W bike greenway. And thanks! for placing the stop stripes at the 4-way stop E. Longview and N. Glenwood west by the park. We have a significant issue with motorists running that stop sign by the park entering the neighboorhood. We appreciate your good work.
The alley to the north of 1212 N Grant has several very large pot holes