Potholes, Other Street Repair
739 N Oolitic DR
- Case Date:
- 3/21/2024
There is a massive trench across the full width of N Oolitic Drive. It has gotten terrible and I fear is a safety risk. It has been there since at least August 2023.
Potholes, Other Street Repair
- Case Date:
- 5/12/2024
Could the utility cut at the intersection of Nancy Street and Mark Street on the east side be paved, please?
Thank you.
Potholes, Other Street Repair
2515 E Caray CT
- Case Date:
- 3/17/2024
Two large potholes in neighborhood. First is near intersection of Caray Ct and Claybridge Dr. Second is in Southern Oaks Dr (between Cedarwood Circle and Sare Rd).
Also, there is no street sign on the intersection of Canada Dr and Claybridge Dr. Can the neighborhood get a street sign here?
Thank you
Ryan Niehaus
Potholes, Other Street Repair
- Case Date:
- 5/8/2024
The street sign at S Churchill Court has faded out completely. It needs to be replaced. Visitors have difficulty finding out home on this court.
Potholes, Other Street Repair
757 S Lincoln ST
- Case Date:
- 5/18/2024
The hole (and patch)m that was drilled in the north east part of the intersection of S. Lincoln St and Dodds ST by the fiber install people has washed out with the latest heavy rain storm.
To my undertstanding you might be patching in this area soon with the other Potholes that are along S. Lincoln Street and Wylie ST.
Thank you for your help!
Potholes, Other Street Repair
1028 W Kirkwood AVE
- Case Date:
- 7/23/2021
Please come and pave our ally! We cannot get in our out of our driveway without hitting the bottom of our cars on the road because of the big holes missing in front of our driveway. A while back some men came and scattered little bits of asphalt along the ally, which did nothing but make the whole ally worse. The entire ally needs repaved dinner than later because the lack of upkeep to the ally is causing damage to our cars. We are documenting all the damage that is being caused to our vehicles because of the negligence of the city to properly maintain the ally and we are also taking note to the fact that the first report we submitted only resulted in the men placing little bits of asphalt around the ally that has made the conditions worse AND the second report we have submitted is still currently open, no response has been submitted to us, and no repairs have been completed. I will continue to report these repairs being needed until the work is finished.