closed #205743
Potholes, Other Street Repair
Woodscrest, near the intersection with E Second
- Case Date:
- 9/16/2025
In the Woodscrest lane that is nearest to the Army Center is a pothole.
In the Woodscrest lane that is nearest to the Army Center is a pothole.
Near the intersection with Woodscrest, on E Second Street between the field next to the elementary school and the Army building.
Road has gotten extremely deep potholes over the past year and residents are worried that during the winter cars will slide down onto the main road. Last winter potholes were not as deep and cars still slid into the main road almost causing collisions multiple times. this is the only exit for many houses as it is a one way road.
broken glass from car wrecks in the bike path needs cleaned up, major safety issue
Broken glass pieces all over on 6th Street just west of College Ave by Graham Plaza building and Social Cantina.
The large sunken patch has asphalt edges that are starting to breakdown. The southbound edge is particularly bad now and the edge hits tires hard as it is crossed and speed limit. I drive this daily so I have noticed the decline. The whole big pay h needs final paving ASAP.
Our sidewalks were updated over the summer. However, the curbs were not repainted, so we have cars parked to the very edge of our driveways and in bus zones. I am terrified to pull out of my driveway every day, because it's impossible to see the road. And, just this afternoon, one of my students pulled out and got into a terrible accident. So please repaint the sidewalks to prevent more accidents.
There is a large rock, probably 3 foot by 3 foot in the roadway by the sidewalk. Could not roll it into the grass, too heavy
Very large pothole on Huntington near Hillside. Any cyclist running over it will likely result in falls and injuries.
Road construction signs have been here for months. No construction is happening. I received a response to my previous report that, "This project is not yet completed. The signs will be removed upon completion." Whatever project this is has also not begun. The signs need to be removed until the project is actually ready to commence. Posting signs months in advance is irresponsible. When and if this mystery project ever starts, crews will be at higher risk because of the street division's poor planning. Everyone in this neighborhood is used to those signs being there for no reason, so they are useless as a safety measure.