closed #187828
Potholes, Other Street Repair
309 E 7th ST
- Case Date:
- 3/29/2024
I am following up on Ureport # 185950 and work order # 11905. Regards, Craig
I am following up on Ureport # 185950 and work order # 11905. Regards, Craig
Street drain plugged since last summer grass had started to grown in it
Flooding down Brownridge is starting an erosion hole again the road side with a drop of about 3 ft. from the road bed. A short load of stone (2-3 yds maybe) added to the previous should solve it; the last treatment has remained stable and has worked well.
The utility manhole covers in the Northbouand lane of Walnut Street from Miller Drive to Grimes are below the pavement level and need to be raised to pavement lever. This condition has existed since Walnut Street was re-paved years ago. Please fix. Thank you
The drains along the road here are so rough and sunken in that people drive up the middle of the road to avoid them
While this area is under construction, I wonder if you could fix the drainage on northwest corner of the intersection of 6th and Adams. The storm drain sits slightly above the pavement on one corner. The intersection itself may also be below grade. The intersection collects an inch or two of water when it rains.
Moores pike is in very rough shape here. Not helped by the gravel that gets washed out of this driveway every time it rains
Someone spilled a big load of mulch in the road here
Sand and debris in the intersection on Covenanter just east of College Mall Road.
Bus diesel fuel on the road at the Bloomington Hospital stop and leading up to it.