closed #199849
Potholes, Other Street Repair
1619 S Troy CT
- Case Date:
- 1/3/2025
Workers cut a hole in the blacktop and the fix isn't holding.
Workers cut a hole in the blacktop and the fix isn't holding.
Road (asphalt) is cracked from one side to another - all of its width, right in front of 1630 S Ira St. Please fix/pave/take corrective measures for crack not to become worse.
Pothole on 17th between Madison/Kinser Pike and Maple street, in eastbound lane. Getting worse daily.
The sewer cut for this new house was not properly compacted and the asphalt is subsiding.
On Thornton between Oxford Drive and Maxwell Street along the north edge of the street, then in the middle of Thornton as you get closer to Maxwell and on the south side of the street. Where Thornton meets Maxwell all along the eastern edge of that intersection, especially the southeast corner.
There is pothole on eastbound Allen St between Adams St and Christopher.
South Clifton Avenue, from 1500 hundred block to 1600 block needs prepared. Total length of segment is about a tenth of a mile.
Pot hole on the north side of the street. Between 1605 and 1609 w. allen st.
Uneven pavement at the intersection of Dunn and 20th street
There is construction and I understand that, but there are 2 large potholes that have been there for months. Can you please help? Thanks.