uReport

City of Bloomington, Indiana

Search

Fields to display

Search Results: (5954)

closed #200813

Potholes, Other Street Repair

S Bainbridge Dr

Case Date:
2/9/2025

Multiple deep potholes between Ellison Drive and Laura Way.

closed #201806

Potholes, Other Street Repair

S Bainbridge Dr

Case Date:
3/31/2025

S. Bainbridge Drive, perhaps the most important street for Sherwood Oaks after Allendale, has been deteriorating badly ever since I moved to the neighborhood 2 1/2 years ago. It has been patched and patched and patched, but the breakup goes on. Really in need of a general redo.

closed #202187

Potholes, Other Street Repair

S Buffstone Ct

Case Date:
4/21/2025

The street at edge of cul de sac is crumbling and the street inside cul de sac is a mess. It hasn’t been replaced in over a decade. Yet you keep raising our taxes. Please fix this street

closed #200863

Potholes, Other Street Repair

S College Ave

Case Date:
2/12/2025

At 3rd st Madison to walnut

closed #193459

Potholes, Other Street Repair

S College Mall Rd

Case Date:
9/10/2024

There is a large pothole in the northbound lanes of College Mall Rd, just north of Moore's Pike.

closed #169938

Potholes, Other Street Repair

S College Mall Rd, Bloomington, Indiana, 47401

Case Date:
8/18/2019

White lines for pedestrian crosswalks are severely faded on college mall road, which is quite dangerous—especially at night. Please repaint them.

closed #153235

Potholes, Other Street Repair

S Coppertree DR

Case Date:
6/1/2016

Mr. Kuebler wrote on behalf of the Coppertree Homeowners Association thanking the Streets Division and City for the recent resurfacing of the street.

closed #202209

Potholes, Other Street Repair

S Derby Dr

Case Date:
4/22/2025

Potholes--large potholes in various spots

closed #183062

Potholes, Other Street Repair

S Eagleson Ave & E University St, Bloomington, IN 47401, USA

Case Date:
3/7/2023

The eastbound lane of E University Street on the eastern side of Eagleson is an absolute mess - not safe for bikes, have to go fully to the other side of the street to avoid in car, enough loose debris that it's even a little treacherous for pedestrians. Really needs to be properly paved over because the patch jobs just result in this same issue recurring. Sincerely, thanks for all you do!

closed #202429

Potholes, Other Street Repair

S Eastside and E DSecond Street

Case Date:
5/1/2025

Alas, the holes you filled a couple of weeks ago, are back due to the heavy rainfall. Thanks for filling them one more time.